Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF JUNE 16, 2016 FBO #5319
AWARD

S -- Levee Clearing, Ditch Clearing, and Dead Tree Removal

Notice Date
6/14/2016
 
Notice Type
Award Notice
 
NAICS
561730 — Landscaping Services
 
Contracting Office
N69450 NAVFAC Southeast, PWD Mid-South 5722 Integrity Drive Building 455 Millington, TN
 
ZIP Code
00000
 
Solicitation Number
N6945016R6225
 
Archive Date
7/13/2016
 
Point of Contact
Michael Terrell
 
E-Mail Address
l.w.terrell@navy.mil
 
Small Business Set-Aside
Partial Small Business
 
Award Number
N6945016C6225
 
Award Date
6/13/2016
 
Awardee
Information Security and Training (DUNS 944073324)<br />
 
Award Amount
266680.70
 
Line Number
0001
 
Description
Clear all levees locations (Approximately 5,620 LF/ 2 acres) per attached Levee Restoration map to 15 from toe of levee. Completely clear (including stump grinding all trees) identified areas by removing trees, vegetation, etc. Install straw on all areas to keep from any run off from occurring. At completion; apply approved fertilizer in all cleared areas to promote faster grass growth. Finished areas will be completely clean and able to be mowed with a finishing mower without any issues at project completion. Cut down and completely remove by stump grinding 30 identified/tagged dead trees (20 each up to 24 and 10 each up to 36 in diameter) around the installation. Install sod after tree removal and stump grinding has been completed. Areas will be clean, level, and debris free at completion. List and location will be given during pre-con. Contractor will drive around with government representative to ensure exact trees are cut down. Cut and clean approximately 4500 LF of drainage ditches around the installation at various locations (approximately 30 wide x 1 deep). Existing drainage ditches should be properly cut, clean, graded, and smooth at project completion to ensure proper flow of our drainage system in each area work is performed. All excess dirt/debris will be removed and all areas are clean, level, and sodded (new sod to match existing grass in area) at completion. Any tracks left from heavy equipment will be repaired/sodded as required for final appearance. See attached drainage base map with exact locations and approximate distances/measurements.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DON/NAVFAC/N40083A/Awards/N6945016C6225.html)
 
Record
SN04148680-W 20160616/160614234523-95c52721d9814c5ad2386d0e8645314d (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.