Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF JUNE 18, 2016 FBO #5321
SOURCES SOUGHT

Y -- NM IRR 85(1), Peralta Wash

Notice Date
6/16/2016
 
Notice Type
Sources Sought
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, 12300 West Dakota Avenue, Lakewood, Colorado, 80228
 
ZIP Code
80228
 
Solicitation Number
DTFH6816R00011
 
Point of Contact
Jeremiah B. Rogers, , Agnes Rysz,
 
E-Mail Address
cflcontracts@dot.gov, cflcontracts@dot.gov
(cflcontracts@dot.gov, cflcontracts@dot.gov)
 
Small Business Set-Aside
N/A
 
Description
PROJECT NUMBER: NM IRR 85(1) PROJECT NAME: Peralta Wash PROJECT DESCRIPTION: The project is located on Tribal Lands at Cochiti Pueblo, New Mexico which located roughly halfway between Albuquerque and Santa Fe. It is for construction of a 250 foot bridge across Peralta Creek. The project will consist of a base schedule that will include the construction of the drilled shafts and an option for the remaining work for the bridge. The option may take up to 120 days to award and is dependent on funding. The contractor needs to display experience in delivering a two phased bridge construction project in the past where they have delivered the first phase of the project prior to receiving the notice to proceed on the second phase without a shutdown between the two phases. SIGNIFICANT QUANTITIES (Schedule B): Schedule A Significant Quantities: Drilled Shaft, 36-Inch Diameter: 330 LNFT Drilled Shaft, 42-Inch Diameter: 330 LNFT Option X Significant Quantities: Asphalt Concrete Pavement: 600 TON Structural Concrete, Class A (AE): 389 CUYD Precast, Prestressed Concrete AASHTO Girder (Type III): 990 LNFT Reinforcing Steel, Epoxy Coated: 88,100 LB Bridge Railing, Steel: 559 LNFT ENGINEER'S ESTIMATE: The contracting range for this project is: Schedule A - $1.5 - $2.0 million Option X - $0.5 - $1.0 million CONSTRUCTION DURATION: Construction is anticipated to begin around September 15, 2016 with a contract completion date of May 2, 2017 FUNDING SOURCE: Construction will be funded utilizing Homeland Security, Indian Reservation Roads, New Mexico Statewide Transportation Program and Tribal Transportation funds. ADDITIONAL INFORMATION FOR NOTICE Anticipated advertisement in late-July 2016. Anticipated bid opening in late August 2016 Anticipated contract award for Schedule A in early September 2016. Award Option X in mid-December 2016
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FHWA/68/DTFH6816R00011/listing.html)
 
Record
SN04152107-W 20160618/160616234637-1603a17cd1421806a4d1d6a60a2ffec8 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.