SOLICITATION NOTICE
Y -- NV BLM 10(1) RED ROCK CANYON SCENIC LOOP DRIVE & PARKING AREAS
- Notice Date
- 6/20/2016
- Notice Type
- Presolicitation
- NAICS
- 237310
— Highway, Street, and Bridge Construction
- Contracting Office
- Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, 12300 West Dakota Avenue, Lakewood, Colorado, 80228
- ZIP Code
- 80228
- Solicitation Number
- DTFH6816B00020
- Archive Date
- 8/16/2016
- Point of Contact
- Agnes Rysz, Phone: 7209635700, Joseph Wilson,
- E-Mail Address
-
cflcontracts@dot.gov, cflcontracts@dot.gov
(cflcontracts@dot.gov, cflcontracts@dot.gov)
- Small Business Set-Aside
- N/A
- Description
- THIS IS NOT AN INVITATION FOR BID. PLANS AND SPECIFICATIONS ARE CURRENTLY NOT AVAILABLE. THE TENATIVE ADVERTISEMENT DATE IS JULY 2016. THIS PROJECT WILL BE ADVERTISED ON A FULL AND OPEN BASIS Project Number: NV BLM 10(1) Project Name: Red Rock Canyon Scenic Loop Drive and Parking Areas Project Description: The work will be located at Red Rock Canyon National Conservation Area in Nevada. The Scenic Loop Drive and Parking Areas improvements will occur at the following locations: along the 12.5 mile Scenic Loop Drive, along 0.5 miles of Rocky Gap Road, at 12 parking areas along the route, and along 2.4 miles of a new alignment between Sandstone Quarry and the Visitor Center. The project includes pavement rehabilitation of the roadways, expansion of the parking areas, and a new route to reduce the travel length. Schedule A (12.9 miles in length) - Pavement Rehabilitation of Scenic Loop Drive, Rocky Gap Road, and Calico 1 Parking Lot Expansion Significant items include (approximate quantities subject to change): • 35,300 Tons Asphalt Concrete Pavement • 180,500 SY Full Depth Reclamation • 18,900 LF Curb, Asphalt • 3,820 CY Embankment Construction • 3,900 SF Reinforced Concrete Retaining Wall Schedule B includes Schedule A and 11 Parking Areas - Parking Expansion at All Other Areas Significant items include (approximate quantities subject to change): • 6,000 Tons Asphalt Concrete Pavement • 17,000 SY Full Depth Reclamation • 2,300 SF Reinforced Concrete Retaining Wall Option X (2.42 miles in length) - New Alignment for Return Route from Sandstone Quarry to Visitor Center Significant items include (approximate quantities subject to change): • 6,900 Tons Asphalt Concrete Pavement • 15,500 CY Embankment Construction • 191 CY Structural Concrete It is anticipated this project will be advertised in July 2016 with construction beginning in August 2016 and extending through September 2017. The contracting range for this project is $8,000,000 to $13,000,000.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FHWA/68/DTFH6816B00020/listing.html)
- Place of Performance
- Address: Red Rock Canyon National Conservation Area, Nevada, 89161, United States
- Zip Code: 89161
- Zip Code: 89161
- Record
- SN04154890-W 20160622/160620234015-03c592a36a196b96eebae7c5a62c49d5 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |