Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF JUNE 22, 2016 FBO #5325
SOLICITATION NOTICE

Y -- NV BLM 10(1) RED ROCK CANYON SCENIC LOOP DRIVE & PARKING AREAS

Notice Date
6/20/2016
 
Notice Type
Presolicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, 12300 West Dakota Avenue, Lakewood, Colorado, 80228
 
ZIP Code
80228
 
Solicitation Number
DTFH6816B00020
 
Archive Date
8/16/2016
 
Point of Contact
Agnes Rysz, Phone: 7209635700, Joseph Wilson,
 
E-Mail Address
cflcontracts@dot.gov, cflcontracts@dot.gov
(cflcontracts@dot.gov, cflcontracts@dot.gov)
 
Small Business Set-Aside
N/A
 
Description
THIS IS NOT AN INVITATION FOR BID. PLANS AND SPECIFICATIONS ARE CURRENTLY NOT AVAILABLE. THE TENATIVE ADVERTISEMENT DATE IS JULY 2016. THIS PROJECT WILL BE ADVERTISED ON A FULL AND OPEN BASIS Project Number: NV BLM 10(1) Project Name: Red Rock Canyon Scenic Loop Drive and Parking Areas Project Description: The work will be located at Red Rock Canyon National Conservation Area in Nevada. The Scenic Loop Drive and Parking Areas improvements will occur at the following locations: along the 12.5 mile Scenic Loop Drive, along 0.5 miles of Rocky Gap Road, at 12 parking areas along the route, and along 2.4 miles of a new alignment between Sandstone Quarry and the Visitor Center. The project includes pavement rehabilitation of the roadways, expansion of the parking areas, and a new route to reduce the travel length. Schedule A (12.9 miles in length) - Pavement Rehabilitation of Scenic Loop Drive, Rocky Gap Road, and Calico 1 Parking Lot Expansion Significant items include (approximate quantities subject to change): • 35,300 Tons Asphalt Concrete Pavement • 180,500 SY Full Depth Reclamation • 18,900 LF Curb, Asphalt • 3,820 CY Embankment Construction • 3,900 SF Reinforced Concrete Retaining Wall Schedule B includes Schedule A and 11 Parking Areas - Parking Expansion at All Other Areas Significant items include (approximate quantities subject to change): • 6,000 Tons Asphalt Concrete Pavement • 17,000 SY Full Depth Reclamation • 2,300 SF Reinforced Concrete Retaining Wall Option X (2.42 miles in length) - New Alignment for Return Route from Sandstone Quarry to Visitor Center Significant items include (approximate quantities subject to change): • 6,900 Tons Asphalt Concrete Pavement • 15,500 CY Embankment Construction • 191 CY Structural Concrete It is anticipated this project will be advertised in July 2016 with construction beginning in August 2016 and extending through September 2017. The contracting range for this project is $8,000,000 to $13,000,000.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FHWA/68/DTFH6816B00020/listing.html)
 
Place of Performance
Address: Red Rock Canyon National Conservation Area, Nevada, 89161, United States
Zip Code: 89161
 
Record
SN04154890-W 20160622/160620234015-03c592a36a196b96eebae7c5a62c49d5 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.