Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF JUNE 22, 2016 FBO #5325
MODIFICATION

Y -- Falfurrias Checkpoint Border Patrol Solicitation - Solicitation 1

Notice Date
6/20/2016
 
Notice Type
Modification/Amendment
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
Department of the Army, U.S. Army Corps of Engineers, USACE District, Fort Worth, Attn: CESWF-CT, PO Box 17300, Fort Worth, Texas, 76102-0300, United States
 
ZIP Code
76102-0300
 
Solicitation Number
W9126G16R0085
 
Response Due
7/20/2016 2:00:00 PM
 
Archive Date
12/31/2016
 
Point of Contact
Natasha Kennedy, Phone: 8178861075, Linda Eadie, Phone: 816-886-1085
 
E-Mail Address
natasha.p.kennedy@usace.army.mil, linda.d.eadie@usace.army.mil
(natasha.p.kennedy@usace.army.mil, linda.d.eadie@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Description
Acknowledgement page Solicitation and Specs The U.S. Army Corps of Engineers, Galveston District Office requires a contract in which the contractor shall provide labor, equipment, and materials to incorporate a new checkpoint design for a 1.4 mile site to include demolition of existing checkpoint without any operational interruption. This new checkpoint will consist of the following: 8 primary inspection lames (4 non-commercial/ 4 commercial) with full canopy, 16 secondary inspection lanes (8 non-commercial/ 8 commercial) with full canopy, administration/ processing building, secondary evidence storage building with loading dock, vehicle lift area, 10 short stay kennels, 150 foot antenna, 3900 square foot impound lot, 34 parking spaces, 12000 combined regular/ diesel fueling system, water well system, and septic system with an estimated construction cost between $20M to $25M. This new project is located 14 miles South of Falfurrias, Texas, in Brooks County and will be phased not to exceed 600 calendar days duration. There will be options. During new construction an emphasis must be place on project phasing (maintaining current checkpoint traffic operations; bringing new checkpoint site up to full operation without any downtime). Borrow material (fill material) may be available through King Ranch, Rachel Foundation, or other land owners in the local area. Contract is responsible for acquiring borrow material as needed in accordance to contract requirements.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA63/W9126G16R0085/listing.html)
 
Record
SN04155125-W 20160622/160620234221-30d6d9145d829618f88c93fb4eb8e138 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.