Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF JUNE 26, 2016 FBO #5329
SOLICITATION NOTICE

J -- Repair three 40ft open top submarine fender transport containers and certify.

Notice Date
6/24/2016
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
488390 — Other Support Activities for Water Transportation
 
Contracting Office
N68836 NAVSUP Fleet Logistics Center Jacksonville Mayport Office Bldg. 191, Naval Station Mayport Fleet Contracting Center Mayport, FL
 
ZIP Code
00000
 
Solicitation Number
N6883616T0302
 
Response Due
6/29/2016
 
Archive Date
7/14/2016
 
Point of Contact
Miguel E Rivera 904-270-7179 Please email ALL your questions to
 
E-Mail Address
.e.rivera1@navy.mil
 
Small Business Set-Aside
Total Small Business
 
Description
STATEMENT OF WORK (SOW) FOR REPAIRS AND CERTIFICATION OF THREE OPEN TOP SUB FENDER TRANSPORT CONTAINERS AND ONE STORAGE CONTAINER 1. SCOPE Repair three 40ft open top submarine fender transport containers and certify; repair one 20ft storage container (no certify) to include transporting from and to Naval Station Mayport, Florida. Heat and straighten dents in panels as required, cut out and replace damaged corrugated metal paneling, abrasive blasting interior and exterior, coating with a fast clad zinc HS reinforced zinc primer, Seaguard 5000HS, top coating with Acrolon 218 HS acrylic Polyurethane paint. Install decals, zerk fittings to all doors and hinges and lubricate. 2. SUBMARINE FENDER TRANSPORT CONTAINER IDENTIFICATION 2.1 40 ™ (L) x 8 ™ (W) x 8.5 ™ (H) weather resistant locker #FSCU7400706 2.2 40 ™ (L) x 8 ™ (W) x 8.5 ™ (H) weather resistant locker #FSCU0415080 2.3 40 ™ (L) x 8 ™ (W) x 8.5 ™ (H) weather resistant locker #FSCU0411079 2.4 20 ™ (L) x 8 ™ (W) x 8.5 ™ (H) weather resistant locker 3. REFERENCES: None 4. REQUIREMENTS 4.1 Sub Fender transport containers and storage container are located at Naval Station Mayport, Florida 4.2 Contractor is responsible for transporting. 5. PERIOD OF PERFORMANCE 5.1 All work to be completed by 30 Sep 2016. 6. WORK TO BE ACCOMPLISHED ON SUB FENDER TRANSPORT CONTAINER LISTED IN 2.1 THROUGH 2.3 6.1 Contractor coordinates with gov ™t representative to pickup lockers and transport to contractor ™s facility. 6.2 Replace up to 24 ea. 4ft x 8ft plywood decking with 1 and 1/8 in thick 19 ply Apitong marine grade flooring. 6.3 Cut out and patch one 3ft W x 5ft H section of roadside panel with 14 gage metal corrugated panel. 6.4 Heat, hammer and straighten multiple dents in the unit as needed. 6.5 Cut out and patch one 18in W x 8ft H section next to curbside corner post with 14 gage metal corrugated panel. 6.6 Manufacture 8 bows as per sample provided by government representative, test fit in open top to ensure proper fit of the bows. 6.7 Cut out one 18in x 18in section, one 18in by 24in section, one 24in x 24in section and one 5ft x 5ft section and replace with 14 gage metal corrugated panels on curbside panel. 6.8 Replace up to 25 undercarriage stringer channels. 6.9 Install zerk fittings and lubricate 8 door hinges and 8 rod guides. 6.10 Ensure surface profile of equipment container has been blasted to an SP-10 profile (sides, doors, bottom), apply 40mil thickness of Sherwin Williams Fast Clad Zinc HS Reinforced Zinc Primer, apply one coat of Sherwin Williams Seaguard 5000HS, and one coat of Sherwin Williams Acrolon 218 topcoat to equipment container interior and exterior. (Terracotta interior, terracotta exterior) 6.11 Heat, straighten, weld or replace tarp eyelets as needed. 6.12 Restencil all doors with manufactures data, including nameplates and paint sysem 6.13 Perform certification inspection to make box ISO compliant. 7. WORK TO BE ACCOMPLISHED ON STORAGE CONTAINER LISTED IN 2.4 7.1 Contractor coordinates with gov ™t representative to pickup lockers and transport to contractor ™s facility. 7.2 Cut out and insert up to 8 sqft of corrugated roofing and side panels that are deteriorated. 7.3 Heat, hammer and straighten up to 6 dents in the unit as needed. 7.4 Refurbish and straighten doors, replace gaskets, install zerk fittings in 8 door hinges and bar guides and lubricate. 7.5 Ensure surface profile of equipment container has been blasted to an SP-10 profile all sides, top and bottom. Apply 40mil thickness of Sherwin Williams Fast Clad Zinc HS Reinforced Zinc Primer, apply one coat of Sherwin Williams Seaguard 5000HS, and one coat of Sherwin Williams Acrolon 218 topcoat to equipment container interior and exterior. (haze gray interior and exterior, coat bottom of container with coal tar)
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DON/NAVSUP/N68836Mayport/N6883616T0302/listing.html)
 
Record
SN04161631-W 20160626/160624234639-653536d1a192d751cc1d0af7873ff79c (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.