SOLICITATION NOTICE
Y -- TX FTNP PAIS 10(1) MAIN PARK ROAD
- Notice Date
- 7/7/2016
- Notice Type
- Presolicitation
- NAICS
- 237310
— Highway, Street, and Bridge Construction
- Contracting Office
- Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, 12300 West Dakota Avenue, Lakewood, Colorado, 80228
- ZIP Code
- 80228
- Solicitation Number
- DTFH6816B00015
- Archive Date
- 7/28/2016
- Point of Contact
- Joseph Wilson, Fax: 7209633360
- E-Mail Address
-
cflcontracts@dot.gov
(cflcontracts@dot.gov)
- Small Business Set-Aside
- N/A
- Description
- THIS IS NOT AN INVITATION FOR BID. PLANS AND SPECIFICATIONS ARE CURRENTLY NOT AVAILABLE. THE TENTATIVE ADVERTISMENT DATE IS JULY 22, 2016. THIS PROJECT WILL BE ADVERTISED ON A FULL AND OPEN BASIS. PROJECT DETAILS: This project will provide resurfacing, restoration, and rehabilitation to the 5.8 miles of the main entrance road from the northern park boundary, to the south where the road terminates at the beach. Resurfacing, restoration, and rehabilitation will also be done on portions of Bird Island Basin Road and the campground road; totaling 0.87 miles. The project also includes raising the profile by the fee station to avoid flooding, a minor realignment of the Campground road, new pullouts, pavement preservation for the Malaquite Visitor Center Parking Lot and its entrance roads, and drainage improvements throughout the project. Type of Construction: road rehabilitation, pulverizing, drainage, parking lot micro-surfacing Prospective bidders are hereby alerted that there is a potential for the presence of unexploded ordnance (UXO) within the project limits from former U.S. military training. The Government will provide UXO construction support during the clearing and grubbing operations and for other construction work as determined to be needed. Any unexploded ordnance found during these surveys will be removed from the project site. Prospective bidders are hereby alerted that no construction work involving heavy equipment or that generates ground vibrations above current Park traffic conditions will occur within a 0.5 mile radius of the turtle incubation facility when eggs are present. The contracting range for this project is between $5 million to $10 million. The estimated construction period is October 2016 to April 2017.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FHWA/68/DTFH6816B00015/listing.html)
- Place of Performance
- Address: The TX FTNP PAIS 10(1) Main Park Road project is located at Padre Island National Seashore in Kleberg County, Texas near the city of Corpus Christi, Texas., Texas, United States
- Record
- SN04173743-W 20160709/160707234830-4dc30546c1fa7c50c35af58cc078a9be (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |