Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF JULY 24, 2016 FBO #5357
SOLICITATION NOTICE

Y -- Air Traffic Control Tower Seymour-Johnson AFB, NC

Notice Date
7/22/2016
 
Notice Type
Presolicitation
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
Department of the Army, U.S. Army Corps of Engineers, USACE District, Savannah, Attn: CESAS-CT, 100 W. Oglethorpe Ave, Savannah, Georgia, 31402-0889, United States
 
ZIP Code
31402-0889
 
Solicitation Number
W912HN-16-R-0035
 
Point of Contact
Gosia M. Thompson, Phone: 9126525901
 
E-Mail Address
gosia.m.thompson@usace.army.mil
(gosia.m.thompson@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Description
Magnitude of the project: $10M-$25M Period of Performance: 540 days after the issuance of Notice to Proceed (NTP) Method of Procurement: Lowest price Technically Acceptable (LPTA) 2 Technical Factors: 1. Past Performance, 2. Corporate Relevant Specialized Experience Scope of Work PN: VKAG 01-3004R5, Seymour Johnson AFB, NC Air Traffic Control Tower/Base Operations Complex New construction of an eleven story air traffic control tower. The site is in a high risk zone for other on-going airfield-related operations in associated existing facilities as well as the immediately adjacent active airfield. The tower portion of the project includes erection of complex progressive collapse structural building framing, all dedicated heating ventilation, air conditioning (HVAC), emergency auto-start back-up electrical power for multiple functions, dedicated air traffic electronics communications infrastructure, and specialized control tower cab space to accommodate customized installation of new control systems/hardware. This tower has an added degree of complexity in that it is to be constructed as an integral part (within the same building footprint) of a 25,000 square feet base operations facility supporting tower and airfield operations. All other supporting building site improvements and infrastructure are also included. Following acceptance and operational activation of the complex, the project includes demolition of existing air traffic control tower, Radar Approach Control (RAPCON), base operations and related buildings and infrastructure. The new construction must be completed within 540 calendar days of notice to proceed.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA21/W912HN-16-R-0035/listing.html)
 
Place of Performance
Address: Seymour-Johnson Air Force Base, North Carolina, SJ AFB, North Carolina, United States
 
Record
SN04193067-W 20160724/160722234459-f9cc3974a9f44667585c078ec3e063a3 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.