SOLICITATION NOTICE
V -- Hotel rooms for VIP visit - J&A
- Notice Date
- 7/27/2016
- Notice Type
- Justification and Approval (J&A)
- NAICS
- 721110
— Hotels (except Casino Hotels) and Motels
- Contracting Office
- Department of State, European Posts, U.S. Embassy Madrid, Spain, Serrano 75, 28006, Madrid, Non-U.S., Spain
- ZIP Code
- 00000
- Point of Contact
- Aurora Lopez de Larrinzar, Phone: 345872297, Maria Jose Moyano, Phone: (34) 915872219
- E-Mail Address
-
lopezay@state.gov, moyanomx@state.gov
(lopezay@state.gov, moyanomx@state.gov)
- Small Business Set-Aside
- N/A
- Award Number
- SSP50016D0005
- Award Date
- 6/28/2016
- Description
- J&A for hotel rooms for VIP visit JUSTIFICATION AND APPROVAL FOR OTHER THAN FULL AND OPEN COMPETITION, PRICE JUSTIFICATION (JOFOC) ACQUISITION OF HOTEL ACCOMMODATIONS IN SUPPORT OF SENIOR HIGH LEVEL USG VIP VISIT 1. I recommend that the Department of State use other than full and open competition for the acquisition of hotel rooms for this VIP visit. The estimated cost is 192,377.14 Euros ($221,123.11), 2. Nature and/or description of the action being approved. Acquisition of lodging is required for the various agencies providing support to the USG VIP Visit to Madrid. 3. A description of the supplies or services required to meet the agency's needs. Hotel: Meliá Galgos, Calle de Claudio Coello, 139, 28006 Madrid Estimated quantity of rooms: 150 Deluxe Rooms (single or double) (1400 room nights) 3 Junior Suite (12 room nights) 4 rooms to be used as storage (56 room nights) The hotel is not found to be on the Excluded Parties List dated June 2, 2016 and FAPIIS list dated June 2, 2016. 4. An identification of the statutory authority permitting other than full and open competition. [X] 41 U.S.C. 253 (c) (2), FAR 6.302-2; Unusual and Compelling Urgency; (Based on the available time and urgency of the requirement as detailed below) Security concerns prohibit sufficient advanced notification of VIP travel to allow for sufficient time to conduct full and open competition. The Department of State can only communicate with the staff at Posts abroad when authorization is given due to security concerns. They have an extremely short turnaround time when authorization has been granted for negotiations to commence and site selections to be finalized with both the local vendors and Posts before the actual Senior High Level USG VIP visit occurs. Security and logistical teams make determinations during the site survey as to which hotels are most suitable for the Senior High Level USG VIP and his traveling staff to remain overnight. Consideration of the Senior High Level USG Principal and the location are taken into consideration as a determining factor. The types of events, meetings, locations and availability of venues to support the Senior High Level USG VIP and the delegation are often times designated by the host countries. Unique requirements for communications support are under severe time limitations and always a determining factor in the selection process as its capacity to be augmented to the unique requirements necessary to support certain Senior High Level USG Principals. Many of the arrangements for hotel and transportation are often not confirmed until just before the actual visit. In addition to supporting a large delegation within a short time frame, last minute and frequent changes of itineraries for supporting personnel often result in significant changes in how Posts work with the vendors. With the exception of a few trips, contracts are not permitted to be signed until the Department of State (Post) has written confirmation from all supporting agencies, which enables collection of funds from said agencies in the event of cancellation. This results in an unusual and compelling urgency in accordance with 41 U.S.C. 253 (c) (2), FAR 6.302-2. These unique Senior High Level USG VIP travel requirements result in only a single or a very limited number of responsible sources with no other supplies or services capable of satisfying agency requirement in accordance with 41 U.S.C. 253 (c ) (2), Far 6.302-2. 5. A demonstration that the proposed contractor's unique qualifications or the nature of the acquisition requires use of the authority cited. Security and logistics are the Department of State's primary considerations when procuring hotel rooms. The Department of State must be able to provide a safe and secure environment for VIP visitors. Frequently VIP visits are not announced or confirmed in sufficient time to conduct a competition, creating an urgent and compelling need. At other times, the security requirements and/or requirements of the host country government limit the acquisition to one or a small number of predetermined hotels. [X] The VIP visit information was not available in sufficient time thereby creating an urgent and compelling need. [ ] The host country government requires the use of this/these hotel(s). [X] The proposed contractor has the following unique qualifications which meet the Department of State's security and logistical requirements. [ ] Set-back (hotel is safe distance from the street) [X] Location (able to secure building, travel route; distance to and from event) [X] Size and number of rooms (able to house everyone in one hotel) [ ] Conference facilities (adequate space for meetings, press conferences) [X] Communications (able to install equipment/lines, command center) [X] Accommodating to security needs 6. A description of efforts made to ensure that offers are solicited from as many potential sources as is practicable. Due to urgency and exception in FAR 25.401(a)(5) this solicitation cannot be posted but the JOFOC will be published in FedBizOpps. The following other hotels were reviewed but were not adequate because of the following: a) Westin Palace Hotel. Hotel location not as convenient as the selected hotel. In addition, they did not have enough rooms to accommodate the USG needs. b) Barceló Emperatriz - Although hotel location is as convenient as the selected hotel, they did not have enough rooms to accommodate the USG needs and the rooms were too small. c) InterContinental Hotel - Although hotel location is almost as convenient as the selected hotel, they did not have enough rooms to accommodate the USG needs. 7. A determination by the Contracting Officer that the anticipated cost to the Government will be fair and reasonable. Based on cost comparison with other hotel room rates, the Contracting Officer determines that the rates offered by Meliá Los Galgos Hotel are fair and reasonable, and in the best interest of the USG. Meliá Los Galgos submitted the lowest rates. 8. Any other facts supporting the use of other than full and open competition. NONE 9. A listing of sources, if any, that expressed, in writing, an interest in the acquisition. NONE 10. A statement of the actions, if any, the agency may take to remove or overcome any barriers to competition before any subsequent acquisition for the supplies or services required. NONE CERTIFICATIONS I certify that the information in this justification is accurate and contains complete data necessary to support the recommendation for other than full and open competition to the best of my knowledge and belief. June 7, 2016__________ _____/S/_________________ Date: Michael X. Dobbs Director, Office of Presidential Travel Support I certify that this justification is accurate and complete to the best of my knowledge and belief. Based on my assessment, I conclude that other than full and open competition is justified and the proposed price is fair and reasonable. June 7, 2016_____________ ______/S/_______________ Date: Richard C. Price Contracting Officer
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/notices/16950bd622835db106572cbc7ae342c9)
- Place of Performance
- Address: Calle Claudio Coello, 139, Madrid, Spain, Madrid, Non-U.S., 28006, Spain
- Record
- SN04199178-W 20160729/160727235928-16950bd622835db106572cbc7ae342c9 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |