Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF SEPTEMBER 01, 2016 FBO #5396
MODIFICATION

N -- REPLACE SCHOODIC PROPANE BOILERS

Notice Date
8/30/2016
 
Notice Type
Modification/Amendment
 
NAICS
238220 — Plumbing, Heating, and Air-Conditioning Contractors
 
Contracting Office
NPS, NER A/E- CONSTRUCTION - IA MAB 200 Chestnut Street, 3rd Floor Philadelphia PA 19106 US
 
ZIP Code
00000
 
Solicitation Number
P16PS02089
 
Response Due
9/7/2016
 
Archive Date
9/22/2016
 
Point of Contact
Braccia, Daniel
 
Small Business Set-Aside
Total Small Business
 
Description
The purpose of this Amendment is provide answers to questions posed and to incorporate revisions to the existing SOW. Q1. Boiler exhaust penetrations typically need to be three feet above ground when exiting building. The exhaust penetrations from the top of the basement level wall will be about one foot above existing grade. Should the documents be modified to show rising thru slab on deck into 1st level and then exit Transportation Building? A1. The boiler referenced in the specification 15510 2.L. "or equal", installation Manual requires 12 " above ground or snow line and includes various permissible venting scenarios. Boiler selected and submitted by the contractor should accommodate the space available. See revised 15510 Para. 2.L. 4. a. Q2. Is it the intent to place the new to tank to the East of the existing tank or to the West behind the guard rail which will require a lot of granular fill to get the new tank to the same level as the existing? A2. It is the intent to place the new tank behind the guard rail which will require some granular fill (limited by the installation of a wood timber framework) to get the new tank to the same level as the existing tank. No change to drawings or specifications required. Q3. What size should we be getting pricing on? What is the Btu/h input and output required? A3. Notes on sheets M2 and M4 specify minimum MBH DOE heat capacity. CHANGE:200,000 to 200 MBH DOE on Sheet M2 and 280,000 to 280 MBH DOE on Sheet M4. ADD to Sheets M2 and M4: Units to comply with the minimum DOE, select ARHI to comply. Q4. You are asking for stainless steel combustion chamber, do you want the heat exchanger to be stainless steel? A4: Specification 15510 2. J. and L 5 intends to specify a stainless steel heat exchanger as well if separate from chamber/fire tube. See revised 15510 Para. 2.L. 3. a. which is reformatted to clarify. Please note: DELETE Section 15010 - Boilers in its entirety and replace it with the attached revised version of Section 15510 - Boilers The due date and time for receipt of bids is hereby extended to NLT 2PM local time on Wednesday September 7 2016.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOI/NPS/APC-IS/P16PS02089/listing.html)
 
Place of Performance
Address: Schoodic Education & Research Ctr. Acadia National Park 20 McFarland Hill Drive Bar Harbor ME 04609 USA
Zip Code: 04609
 
Record
SN04247354-W 20160901/160830235607-7705824114dd560650042c1e8b0be9fc (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.