MODIFICATION
Y -- UT FLAP 73(1), La Sal Mountain Loop Road - Solicitation 1
- Notice Date
- 9/1/2016
- Notice Type
- Modification/Amendment
- NAICS
- 237310
— Highway, Street, and Bridge Construction
- Contracting Office
- Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, 12300 West Dakota Avenue, Lakewood, Colorado, 80228
- ZIP Code
- 80228
- Solicitation Number
- DTFH6816B00025
- Archive Date
- 10/31/2016
- Point of Contact
- Joe Wilson, Fax: 7209633360, Agnes Rysz, Fax: 7209633360
- E-Mail Address
-
cflcontracts@dot.gov, cflcontracts@dot.gov
(cflcontracts@dot.gov, cflcontracts@dot.gov)
- Small Business Set-Aside
- N/A
- Description
- Cross Sections Geotech Report Plan Sheets Invitation for Bid THIS PROJECT WILL BE ADVERTISED ON AN UNRESTRICTED (FULL AND OPEN) COMPETITION. PROJECT DETAILS: UT FLAP 73(1), La Sal Mountain Loop Road This project in includes reconstruction of a 10.83 miles roadway reconstruction on County Road 73, otherwise called La Sal Mountain Loop Road located in Grand and San Juan Counties, Utah. Type of Construction: grading, MSE Retaining walls, culverts, concrete headwalls, and riprap, aggregate base course, and paving, traffic control, public information This project consists of: Schedule A: Phased Construction of 9.08 miles of roadway reconstruction and paving. Significant Items for Schedule A Include: 2,000 LF of fiber rolls; 40,000 CY of roadway excavation; 500 subexcavation; 600 cuyd of riprap; 18,600 sqft of mechanically stabilized earth wall; 39,300 tons of aggregate base; 17,820 tons of hot asphalt paving; 3,490 LF of pipe culvert placement; 1,450 LF of guardrail; hydraulic seeding 23 acre; 71.0 miles of pavement markings; 1,120 flagger hours Option X: Phased Construction of 3.21 miles of roadway reconstruction and paving. Significant Items for Option X Include: 625 LF of fiber rolls; 56,800 CY of roadway excavation; 35,400 cuyd excavation waste; 160 cuyd of riprap; 16,0000 tons of aggregate base; 7,300 tons of hot asphalt paving; 1,090 LF of pipe culvert placement; hydraulic seeding 15 acre; 5.0 miles of pavement markings; 480 flagger hours. Estimated total cost for Schedule A and Option X is $9 to $15 million.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FHWA/68/DTFH6816B00025/listing.html)
- Place of Performance
- Address: Grand and San Juan Counties, Utah, 84532, United States
- Zip Code: 84532
- Zip Code: 84532
- Record
- SN04251110-W 20160903/160901234747-f93acbbeedcd1ef3b3d498c82025a052 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |