Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF SEPTEMBER 03, 2016 FBO #5398
MODIFICATION

Y -- UT FLAP 73(1), La Sal Mountain Loop Road - Solicitation 1

Notice Date
9/1/2016
 
Notice Type
Modification/Amendment
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, 12300 West Dakota Avenue, Lakewood, Colorado, 80228
 
ZIP Code
80228
 
Solicitation Number
DTFH6816B00025
 
Archive Date
10/31/2016
 
Point of Contact
Joe Wilson, Fax: 7209633360, Agnes Rysz, Fax: 7209633360
 
E-Mail Address
cflcontracts@dot.gov, cflcontracts@dot.gov
(cflcontracts@dot.gov, cflcontracts@dot.gov)
 
Small Business Set-Aside
N/A
 
Description
Cross Sections Geotech Report Plan Sheets Invitation for Bid THIS PROJECT WILL BE ADVERTISED ON AN UNRESTRICTED (FULL AND OPEN) COMPETITION. PROJECT DETAILS: UT FLAP 73(1), La Sal Mountain Loop Road This project in includes reconstruction of a 10.83 miles roadway reconstruction on County Road 73, otherwise called La Sal Mountain Loop Road located in Grand and San Juan Counties, Utah. Type of Construction: grading, MSE Retaining walls, culverts, concrete headwalls, and riprap, aggregate base course, and paving, traffic control, public information This project consists of: Schedule A: Phased Construction of 9.08 miles of roadway reconstruction and paving. Significant Items for Schedule A Include: 2,000 LF of fiber rolls; 40,000 CY of roadway excavation; 500 subexcavation; 600 cuyd of riprap; 18,600 sqft of mechanically stabilized earth wall; 39,300 tons of aggregate base; 17,820 tons of hot asphalt paving; 3,490 LF of pipe culvert placement; 1,450 LF of guardrail; hydraulic seeding 23 acre; 71.0 miles of pavement markings; 1,120 flagger hours Option X: Phased Construction of 3.21 miles of roadway reconstruction and paving. Significant Items for Option X Include: 625 LF of fiber rolls; 56,800 CY of roadway excavation; 35,400 cuyd excavation waste; 160 cuyd of riprap; 16,0000 tons of aggregate base; 7,300 tons of hot asphalt paving; 1,090 LF of pipe culvert placement; hydraulic seeding 15 acre; 5.0 miles of pavement markings; 480 flagger hours. Estimated total cost for Schedule A and Option X is $9 to $15 million.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FHWA/68/DTFH6816B00025/listing.html)
 
Place of Performance
Address: Grand and San Juan Counties, Utah, 84532, United States
Zip Code: 84532
 
Record
SN04251110-W 20160903/160901234747-f93acbbeedcd1ef3b3d498c82025a052 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.