FBO DAILY - FEDBIZOPPS ISSUE OF SEPTEMBER 03, 2016 FBO #5398
MODIFICATION

Y -- Ft. Peck Draft Tube Bulkheads

Notice Date
9/1/2016
 
Notice Type
Modification/Amendment
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
Department of the Army, U.S. Army Corps of Engineers, USACE District, Omaha, Attn: CENWO- CT, 1616 Capitol Ave, Omaha, Nebraska, 68102-4901, United States
 
ZIP Code
68102-4901
 
Solicitation Number
W9128F-16-R-0033
 
Point of Contact
Timothy B. Boyte, Phone: 4029952589
 
E-Mail Address
timothy.b.boyte@usace.army.mil
(timothy.b.boyte@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Description
Federal Business Opportunities Information Date: 2016 May 11 SOLICITATION NO. W9128F-16-R-0033 On or about 10 Aug 2016, this office will issue Request for Proposals for the construction of the Draft Tube Bulkhead, Fort Peck, MT. The solicitation will close on or about 9 September 2016. This solicitation is UNRESTRICTED AND OPEN TO BOTH LARGE AND SMALL BUSINESS PARTICIPATION. A site visit date and time will be issued with the advertisement package. DO NOT submit requests for plans and specifications to the site visit personnel listed above. See ‘Obtaining Solicitation Documents' below. _______________________________________________________________________________ Project Description: (Approx. quantities) The work consists of removal/recycling of two (2) existing draft tube bulkheads with lead paint. Contractor shall cut four (4) large (12"x12") coupons from the existing draft tube bulkheads, which shall remain the property of the government. Removal/recycling of one (1) existing draft tube bulkhead lifting beam with lead paint. Fabrication, painting, delivery, installation, and testing of two (2) new structural steel draft tube bulkheads with new seals. Detailed design, fabrication, painting, delivery, installation, and testing of one (1) new draft tube bulkhead lifting beam. Each bulkhead is approximately 20'-6" wide by 13'-2" tall by 2' deep and weighs approximately 10 tons. Existing bulkheads will be removed and new bulkheads will be delivered to the draft-tube deck of Fort Peck Powerhouse No. 2. Access to the site of the draft tube deck will be unusually challenging. Delivery access is blocked by the tailrace water on three sides and by Powerhouse No. 2 on the 4th side. The contractor shall determine the delivery method. Delivery method may include mobile crane, barge mounted crane, sky crane, or other methods to be determined by the contractor The estimated construction cost of this project is between $750,000 and $1,000,000. _______________________________________________________________________________ The Contractor will be required to commence work within 10 days after notice to proceed and complete the work 540 calendar days after receipt of Notice to Proceed. Provisions will be included for liquidated damages in case of failure to complete the work in the time allowed. Performance and payment bonds will be required. Bonding documents including the power of attorney shall bear an original signature by an officer of the surety. Bidders (Offerors): Please be advised of on-line registration requirement for Representations and Certifications Application (ORCA) is now located in System for Award Management (SAM) database https://www.sam.gov/portal/public/SAM/. Representations and certifications are required to be updated annually as a minimum to keep information current, accurate and complete. The electronic annual representations and certifications are effective until one year from date of submission or update to SAM. Obtaining Solicitation Documents: Solicitation documents will be posted to the web via Federal Business Opportunities (www.fbo.gov). Find solicitation announcement in Fed Biz Opps (www.fbo.gov) 1. Use the ‘Quick Search' to locate the project (by entering the solicitation number) or use the advanced search features offered in the ‘Find Opportunities' (large arrow in the middle of the page) or use the ‘Opportunities' tab followed by the ‘Advanced Search' tab. 2. By using the ‘login' feature, it allows additional search features and allows you to keep your searches. Login might be required on some solicitations that are considered restricted. 3. Once you have located your project, click on link to solicitation to view the project. Files may be downloaded from the column on the right side reading ‘All Files' or from the ‘Packages' tab. 4. If you want other vendors, sub-contractors or contractors to contact you, click on the ‘Interested Vendors' tab and then ‘Add me to Interested Vendors' link at the bottom of the page. Questions regarding contractual matters should be made to: Timothy Boyte 402-995-2589. Commander U.S. Army Engineer District, Omaha ATTENTION: CENWO-CT-C 1616 Capitol Avenue Omaha, NE 68102 4901
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA45/W9128F-16-R-0033/listing.html)
 
Place of Performance
Address: Ft. Peck Dam, Montana, United States
 
Record
SN04253043-W 20160903/160902000712-a8b25e75456f5d459ccd5e5a855fd953 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.