Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF SEPTEMBER 08, 2016 FBO #5403
MODIFICATION

Z -- Woods Creek Decommission, Close and Stabilize, Cowlitz Valley Ranger District

Notice Date
9/6/2016
 
Notice Type
Modification/Amendment
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Agriculture, Forest Service, R-6 Contracting North - Gifford Pinchot NF, 10600 NE 51st Circle, Vancouver, Washington, 98682, United States
 
ZIP Code
98682
 
Solicitation Number
AG-05K3-S-16-0043
 
Archive Date
10/4/2016
 
Point of Contact
Lisa N Peterson, Phone: 3608915079
 
E-Mail Address
lnpeterson@fs.fed.us
(lnpeterson@fs.fed.us)
 
Small Business Set-Aside
Total Small Business
 
Description
The Gifford Pinchot National Forest intends to acquire by contract contractor supplied equipment, operators, and labor for the decommissioning of Forest Service Road 2505016 (MP 0.0-0.1), and closure and stabilization of FSR 2305027 (0.0-0.5 mile) and FSR 2508049 (MP 0.0 - 0.3). Project work includes the removal and disposal of cross-drain culverts, diversion of stream channels, utilization of best management practices to prevent soil erosion and control pollution in stream channels, removal and disposal of stream channel culverts, construction of stream channel grade control structures, excavation and placement of roadway embankment material, ditch filling, construction of cross drains, scattering of slash encountered in clearing operations, seeding and mulching of all disturbed areas, and noxious weeds control (e.g. wash equipments prior to arrival on site). Close and stabilize, and decommission of roads by completing work at designated locations staked on the ground, and shown in the plans. All work shall conform to the contract plans and specifications. This project will result in the closure and stabilization of 0.8 miles of road, and 0.1 miles of road decommissioning. Project entails the removal and disposal of 1 stream channel culvert (Ames Creek), one overflow culvert (Ames Creek), soil erosion and pollution control at the Ames Creek stream channel crossing, construction of 22 cross drains, seeding and mulching of 0.41 acres. Operators can propose any type of equipment up to 36,000 lbs that would meet the needs of the project. Anticipate an excavator or similar piece of equipment to remove materials from road prism in order to remove culverts, help re-establish water flow in channel after culvert removal, and construct cross drains. Equipment will be needed to haul and transport culverts to a proper disposal site off of U.S. Forest Service lands. The work is anticipated to be done in the Summer of 2016 or when dry ground conditions exist as determined by the Contracting Officer Representative (COR) and continue for 5 calendar days. This acquisition is a 100% Small Business set-aside. The applicable NAICS code is 237310- Highway, Street and Bridge Construction. The corresponding size standard is $36.5 million. Offerors will be evaluated on technical capability (experience), past performance and price. The Contract will be awarded to the offeror whose submittal, in compliance with the solicitation, is the best value to the Government. The Government's estimated price range is between $25,000 and $100,000. All responsible sources may submit an offer which will be considered by the government. In accordance with FAR 4.1102(a), prospective contractors must be registered in the System for Award Management (SAM) prior to award of a contract. Lack of registration in the SAM Database will render an offeror ineligible for award. SAM replaced the Central Contractor Registration (CCR) Database. Offerors may obtain information on registration and annual confirmation requirements via the internet at: https://www.sam.gov/portal/public/SAM/. A solicitation for this project will be posted to this website on September 6, 2016 with offers due on September 19, 2016.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/05K3/AG-05K3-S-16-0043/listing.html)
 
Place of Performance
Address: The project location from Randle, Washington on Highway 12 travel south on road 131 crossing the Cowlitz River bridge. Road then transitions and veer slightly to the right onto Forest Service Road 25. All of the proposed roads for decommissioning, and closure and stabilization are accessible from Forest System Road 25 or 23., United States
 
Record
SN04257193-W 20160908/160907173221-202e7ca2cbeddfce75062009f733ad84 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.