Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF SEPTEMBER 11, 2016 FBO #5406
DOCUMENT

J -- 636-17-1-5058-0006 Boiler Inspections, Adjustments and Calibrations - Attachment

Notice Date
9/9/2016
 
Notice Type
Attachment
 
NAICS
811310 — Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance
 
Contracting Office
Department of Veterans Affairs;VA Medical & Regional Office Center;2501 W. 22nd St.;Sioux Falls SD 57105
 
ZIP Code
57105
 
Solicitation Number
VA26316Q0955
 
Response Due
9/16/2016
 
Archive Date
10/16/2016
 
Point of Contact
Scott Morrison, Contract Specialist
 
Small Business Set-Aside
Total Small Business
 
Description
Location of service: VA Nebraska-Western Iowa Health Care System, Grand, Island VA Medical Center, Building 7. 2201 North Broadwell Avenue, Grand Island, NE 68803 Provide all necessary labor, skill and test equipment required to inspect, service and adjust burners, controls and associated instrumentation of boiler system located in Building #7. Knowledge of calibration/adjustment procedures of Superior boiler and controls along with Cleaver Brooks boilers and Cleveland controls is required. Technical: Boiler and instrumentation inspection and calibration will be performed semi-annually in October and March of each year under the contract. Boilers: Cleaver Brooks (two each).Superior (one each) Fire TubeFire Tube 200 Horsepower200 Horsepower Instrumentation: (1) Cleveland Controls and Superior Controls Boiler burner combustion testing and adjustment: Test and adjust to maximum efficiency (two) Cleaver Brooks CB200X-200 and (one) Superior gas and #2 fuel oil combination burners. Test equipment should be accurate and capable of reading minimum of excess air, 02, stack temperature and efficiency. Burner should be adjusted for no more than 15% excess air at high fire with no CO. Written results for each fuel and boiler at each adjustment screw on fuel cams is required. Contractor just provide at least a five-minute time delay between fuel cam set screw adjustments to allow boiler time to stabilize. As a guideline, it is expected that eight hours will be required to test and adjust each boiler. Calibration of boiler panels and instrumentation: (1) The following equipment will be required to perform testing and calibration: 4-20 M.A. meter. 4-20 milliampere and 1-5 volt simulator. Accurate volt-ohm meter. Barometer. Decade box. (2) Check and calibrate the following: (a) Draft gauges. Feedwater controls. Boiler steam pressure submaster control. Boiler steam pressure master control. 3. Checklist: Contractor will provide a completed service report indicating complete details specifically identifying each burner, control, sensor, gauge, panel and instrumentation unit calibrated within three weeks after service has been performed.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/VA/SFaVAMC/VAMCCO80220/VA26316Q0955/listing.html)
 
Document(s)
Attachment
 
File Name: VA263-16-Q-0955 VA263-16-Q-0955_1.docx (https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=2997534&FileName=VA263-16-Q-0955-000.docx)
Link: https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=2997534&FileName=VA263-16-Q-0955-000.docx

 
Note: If links are broken, refer to Point of Contact above or contact the FBO Help Desk at 877-472-3779.
 
Place of Performance
Address: Department of Veterans Affairs;C/O Grand Island CBOC;2201 N. Broadwell Ave.;Grand Island, NE
Zip Code: 68803
 
Record
SN04264334-W 20160911/160911092129-ed998c98049145b830291359b9b0445c (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.