Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF SEPTEMBER 11, 2016 FBO #5406
SOLICITATION NOTICE

Z -- BEAVERHEAD_DEERLODGE NF Hill Reservoir Dam Breach

Notice Date
9/9/2016
 
Notice Type
Presolicitation
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
Department of Agriculture, Forest Service, R-1 East Side Acquisition Team: Beaverhead-Deerlodge; Custer Gallatin; Helena; Lewis & Clark NFs; Dakota Prairie NG, Montana, United States
 
ZIP Code
00000
 
Solicitation Number
AG-0356-S-16-0027
 
Archive Date
9/30/2016
 
Point of Contact
Lisa Rakich, Phone: 406-683-3968, Mark Libby, Phone: 406-683-3971
 
E-Mail Address
lrakich@fs.fed.us, mlibby@fs.fed.us
(lrakich@fs.fed.us, mlibby@fs.fed.us)
 
Small Business Set-Aside
Total Small Business
 
Description
Z- Hill Reservoir Dam Breach on teh Madison Ranger District PRESOLICITATION NOTICE Project Location : Hill Dam is located in the North Fork Indian Creek drainage in the Tobacco Root Mountains approximately 9.5 air miles northeast of Sheridan, MT; longitude 112d 02.387' W, latitude 45d 32.353' N; T3S, R4W, S25. Prebid Tour: No tour is scheduled, however, Prospective Offerors are strongly encouraged to inspect the project site to satisfy themselves regarding conditions that may affect the cost of contract performance and access. Access to the site in the winter will be very difficult! Scope of Contract: This project is to breach the Hill Reservoir dam. The dam is an earthen dam located in the Tobacco Root Mountains. The dam was constructed prior to 1916 and has been abandoned since 1989. The dam has a structural height of 18 feet and has a 15-inch CMP outlet pipe 89 feet in length. The breach will create a notch in the dam embankment the full height of the dam. In the tentative design, the bottom of the notch will be at the outlet pipe invert and will create a 10 foot wide channel. The side slopes of the channel will be at a 2 H: 1 V slope. Erosion control measures and disposal of the CMP outlet pipe will be included in the contract.The dam currently impounds water during spring runoff and drains down by late summer. Access to the Project Site for Pre-Bid Purposes : Hill dam is accessed by FS Road #158, then North Fork Indian Creek Trail #6015 (2.2 miles), then Hill Reservoir Trail #6007 (1 mile). North Fork Indian Creek Trail #6015 and the Hill Reservoir Trail #6007 are non-motorized. Area travel restrictions prohibit road vehicle, ATV, and motorbike use year long and winter motorized travel is prohibited December 2 to May 15. Prospective Offerors shall comply with current Beaverhead-Deerlodge NF travel management regulations. Access to the Project Site During Construction : After award of the contract, the successful Offeror will be given authorization to access the site with motorized equipment via North Fork Indian Creek Trail #6015 and Hill Reservoir Trail #6007 as follows: a single trip in and out at the beginning and end of the project with an excavator; the track width of the excavator shall not exceed 10 feet; a single daily trip in and out each day that work is being performed by an ATV/UTV; ATV/UTV width shall not exceed 60 inches. Sections of trail #6015 and #6007 have been reconstructed and re-routed off the original route/prism. All motorized use shall stay on the original route/prism. All logs, debris, and rocks moved to allow access shall be placed back while exiting the project to return the trail tread to its current width and to obscure and obliterate the original route/prism. All constructed features such as road water bars, drain dips, turnpikes, and approaches that are damaged shall be returned to their current condition. Price Range: Between $25,000 and $100,000 Anticipated Bidding Period : It is anticipated that quotes will be solicited for this project in February and/or March, 2017. Anticipated Period of Performance : It is anticipated that the period of performance will be after around August 15 to October 1, 2017.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/398/AG-0356-S-16-0027/listing.html)
 
Place of Performance
Address: Sheridan Work Center, S. Main, Sheridan, Montana, 59749, United States
Zip Code: 59749
 
Record
SN04265434-W 20160911/160911093046-ee7b54ac3ba2c112d13c96258dd4bce5 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.