Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF SEPTEMBER 11, 2016 FBO #5406
AWARD

Y -- Ventilation System for Abiquiu

Notice Date
9/9/2016
 
Notice Type
Award Notice
 
NAICS
238220 — Plumbing, Heating, and Air-Conditioning Contractors
 
Contracting Office
Department of the Army, U.S. Army Corps of Engineers, USACE District, Albuquerque, Attn: CESPA-CT, 4101 Jefferson Plaza NE, Albuquerque, New Mexico, 87109-3435, United States
 
ZIP Code
87109-3435
 
Solicitation Number
W912PP-16-T-0091
 
Archive Date
9/22/2016
 
Point of Contact
Glenda D. Kohlieber, Phone: 5756524135
 
E-Mail Address
glenda.d.kohlieber@usace.army.mil
(glenda.d.kohlieber@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W912PP-16-P-0072
 
Award Date
9/7/2016
 
Awardee
Groundhog Excavating, Inc, 805 NIKANDA RD NE, ALBUQUERQUE, New Mexico 87107, United States
 
Award Amount
$30886.85
 
Line Number
0001
 
Description
The Contractor shall provide all plant, labor, materials, appurtenances, equipment, shop facilities, supervision, tools, staging, scaffolding, mechanical lifts, and any other items necessary to provide the installation of the Ventilation System. All work shall be in accordance with this SOW and these specifications. The Contractor shall install a Keeptheheat 'Or Equivalent' Air -to -Air Ventilation Heat Exchanger in the Abiquiu Maintenance Building at the Abiquiu Lake Project Office, located at 4731 Highway 96. The Maintenance building is approximately 44,268 Cubic Feet of inside space. The Maintenance building is 62 Feet in Length, 42 Feet in Width and 17 Feet High (Measurement is from the middle of the Floor inside the building to the highest point in the ceiling, the ceiling is a pitched roof).The edges of the inside of the building measurement from the floor to the roof is 10 feet. This ventilation system will remove stagnate air while maintaining heated air inside the building. This ventilation system shall have an Air-to-Air Heat Exchanger which will keep the heat inside of the building instead of exhausting it outside. The electrical hookups for the ventilation system (On/Off switches for each fan) will not be provided by the contractor for the installation. The electrical portion of the ventilation system which is powered by either 115,208-230, 1 phase or 230/460 3 phase, will be the responsibility of the Abiquiu Lake Project Office
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA47/Awards/W912PP-16-P-0072.html)
 
Record
SN04265728-W 20160911/160911093317-a98b2dacfcc32c10bc2934f53f016cb7 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.