Y -- PFO ROAD GRADING CONTRACT

Notice Date
9/12/2016
 
Notice Type
Modification/Amendment
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
BLM ID-STATE OFC HR&ADM SVC (ID953) 1387 S. VINNELL WAY BOISE ID 83709 US
 
ZIP Code
00000
 
Solicitation Number
L16PS01228
 
Response Due
9/16/2016
 
Archive Date
10/1/2016
 
Point of Contact
Barker, Diane
 
Small Business Set-Aside
Total Small Business
 
Description
IGF::OT::IGF PFO ROAD GRADING CONTRACT This amendment is to address questions asked during the site tour or changes made by the government. Change made by the Government, The upper 2 miles of the Wood Canyon Road will be removed from the contract due to safety concerns (steep slope, narrow road). The project still includes 20 miles of grading. Please see attachments with revised maps. Question 1., Contract refers to 95% compaction, but there are no specs. Answer, The statement of work referred to compaction in 2 places, they have been removed and annotated. Question 2., Do we have to dig potholes down to the bottom. Answer, No, blade smooth to the top of the pothole so the entire road surface is smooth. Blading t the bottom of potholes would result in too much material removal. Question 3., Is a water truck required? Answer, Only if needed to fulfill the contract. Weather conditions (rain) should provide a reasonable window for adequate soil condition in the fall and/or spring without the use of a water truck, but re lying on the weather condition is a risk that you will have to take. Question 4., Performance period as stated in Section F. The vendor needs to be prepared to start the contract within 5 days of when the Notice to Proceed is issued. The government estimates this to be a 8 day project with up to 10 seasonal delay days making the total 18 days. The contract period of performance shows 9/26/16 to 5/31/17. The government wants this project completed this fall unless weather permits it. If it can't be completed (too wet or frozen) this fall then the contract will be completed next spring once the conditions are acceptable. Question 5., Do we have to maintain all roads to 14'. Answer, Contractor shall ensure that the travelway width remains the same or wider post-maintenance.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOI/BLM/ID/L16PS01228/listing.html)
 
Record
SN04266320-W 20160914/160912234534-3516c906635ee0bc7dc999b55198d61b (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.