Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF SEPTEMBER 17, 2016 FBO #5412
SOLICITATION NOTICE

Z -- Bonneville Bradford Fish Ladder Erosion Repair

Notice Date
9/15/2016
 
Notice Type
Presolicitation
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
Department of the Army, U.S. Army Corps of Engineers, USACE District, Portland, Attn: CECT-NWP, PO Box 2946, Portland, Oregon, 97208-2946, United States
 
ZIP Code
97208-2946
 
Solicitation Number
W9127N-17-B-0001
 
Point of Contact
David Dvorak, Phone: 5038084633
 
E-Mail Address
david.l.dvorak@usace.army.mil
(david.l.dvorak@usace.army.mil)
 
Small Business Set-Aside
Total Small Business
 
Description
The work includes site preparation and placement of rip-rap for armoring a slope that has recently been scoured due to high flows. Site preparation includes demolition of a grouted rip-rap layer about 3 feet thick as shown on the attached plans. Site preparation also includes demolition of the concrete slabs indicated on the latest bathymetric survey. The existing rip-rap must be removed to the slopes and elevations shown on the attached plans to allow for placement of new stone in a layer 5 feet thick. The top of the existing slope is at approximately elevation +15 feet NGVD 29. The site preparation and stone placement will extend down to an approximate elevation of -27 feet NGVD29. Government furnished stage-duration data for Bonneville Dam between Dec 1 and Feb 28 is attached. The median historical tailwater surface elevation is 15.6 feet in the month of December and 16.7 feet for the entire period. Therefore, there is a 50% chance water depth is 45 feet however the data provided indicate that larger fluctuations between 35 feet and 65 feet should be anticipated. The Government anticipates that all rock placement will occur underwater. The stone to be placed has an average weight of 3,000 pounds and diameter of 3.3 feet. The Government estimates that 4,800 tons of stone will be required to complete the work using a density of 165 PCF. Quality control on grading includes surveys before site preparation, after site preparation, and after final stone placement. These surveys may be all bathymetric in nature depending on the water surface elevations, however the entire affected area must be surveyed. Quality controls on materials and placement specifications are in Section 35 31 19 STONE, CHANNEL SHORELINE/COASTAL PROTECTION FOR STRUCTURES.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA57/W9127N-17-B-0001/listing.html)
 
Place of Performance
Address: Bonneville Dam Skamania County, Washington, United States
 
Record
SN04272898-W 20160917/160915235225-80a9d2e2ad51ea59086275709c489b4f (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.