AWARD
99 -- Bldg. 1010 Logistics at KAFB
- Notice Date
- 9/20/2016
- Notice Type
- Award Notice
- NAICS
- 236220
— Commercial and Institutional Building Construction
- Contracting Office
- Department of the Army, U.S. Army Corps of Engineers, USACE District, Albuquerque, Attn: CESPA-CT, 4101 Jefferson Plaza NE, Albuquerque, New Mexico, 87109-3435, United States
- ZIP Code
- 87109-3435
- Solicitation Number
- W912PP-16-T-0072
- Archive Date
- 10/5/2016
- Point of Contact
- Glenda D. Kohlieber, Phone: 5756524135
- E-Mail Address
-
glenda.d.kohlieber@usace.army.mil
(glenda.d.kohlieber@usace.army.mil)
- Small Business Set-Aside
- N/A
- Award Number
- W912PP-16-P-0085
- Award Date
- 9/20/2016
- Awardee
- Rocky Mountain Excavating, Inc., 3620 Wyoming Blvd NE Ste 127, ALBUQUERQUE, New Mexico 87111, United States
- Award Amount
- $149269.56
- Line Number
- 0001
- Description
- The contractor shall furnish all parts, material, labor, equipment and supervision necessary to complete the work for Building 1010 Logistics Office and Dock Repair. a. Demolition;1. Contractor shall remove existing duplexes and j-box as indicated on drawings. 2.Contractor shall remove/reuse existing data and phone as indicated on drawings.3.Contractor shall remove existing blank plate and j-boxes as indicated on drawings.4.Contractor shall remove existing doors and frames as indicated on drawings.5.Contractor shall demo walls and prep for openings as indicated on drawings. 6.Contractor shall saw cut existing concrete slab as indicated on drawings. 7.Contractor shall remove all wall coverings as indicated on drawings.8.Contractor shall remove all flooring and base trim as indicated on drawings.9.Contractor shall remove existing window as indicated on drawings.10.Contractor shall remove & salvage existing refrigerator as indicated on drawings. 11.Contractor shall demo existing ceiling tile and grid as indicated on drawings.12.Contractor shall demo existing emergency lighting as indicated on drawings. 13.Contractor shall demo existing lighting as indicated on drawings.14. Contractor shall relocate existing sprinklers as indicated on drawings. 15.Contractor shall demo HVAC supply and return grills as indicated on drawings.16.Contractor shall demo/relocate existing light switches as indicated on drawings.17.Contractor shall remove and save for reuse existing dock bumper as indicated on drawings. 18.Contractor shall demo existing dock bumper as indicated on drawings.19.Contractor shall demo existing door frame and save door for reuse as indicated on drawings. b. Construction 1.Contractor shall provide and install new duplexes as indicated on drawings. 2. Contractor shall provide and install new GFCI duplexes as indicated on drawings. 3. Contractor shall provide and install new 2 port RJ-45 jacks and purple Cat 6 cable for DREN lines as indicated on drawings. 4.Contractor shall provide and install new 2 port RJ-45 jacks and blue Cat 6 cables for new COMM and phone lines as indicated on drawings. 5.Contractor shall finish wall openings as indicated on drawings. 6.Contractor shall infill door and window openings as indicated on drawings. 7.Contractor shall provide and install new doors and frames as indicated on drawings.8.Contractor shall paint existing door frames as indicated on drawings.9.Contractor shall construct new wall as indicated on drawings. 10. Contractor shall extend existing walls to deck as indicated on drawings. 11.Contractor shall patch, repair, texture & paint all walls as indicated on drawings.12.Contractor shall provide and install new water and drain lines as indicated on drawings.13.Contractor shall provide and install new carpet tile, base and transition strips as indicated on drawings. 14.Contractor shall provide and install new floor tile, base and transition strips as indicated on drawings. 15.Contractor shall provide and install new plastic laminate upper and lower cabinets as indicated on drawings. 16.Contractor shall provide and install new solid surface counter and integral sink as indicated on drawings. 17.Contractor shall provide and install new microwave as indicated on drawings. 18.Contractor shall provide and install new faucet as indicated on drawings.19.Contractor shall provide and install new garbage disposal as indicated on drawings. 20.Contractor shall provide and install new copper water line as indicated on drawings.21.Contractor shall install existing refrigerator as indicated on drawings. 22.Contractor shall provide and install new fire extinguisher as indicated on drawings.23.Contractor shall provide and install new ceiling grid and lay-in tile as indicated on drawings.24.Contractor shall provide and install new lay-in lighting as indicated on drawings.25.Contractor shall provide and install new emergency lay-in lighting as indicated on drawings. 26.Contractor shall provide and install new exit sign as indicated on drawings.27.Contractor shall provide and install new HVAC supply and return and re-balance system as indicated on drawings.28.Contractor shall provide and install new light switches as indicated on drawings. 29.Contractor shall provide and install new switch for garbage disposal as indicated on drawings.30.Contractor shall provide and install new STL edge angle as indicated on drawings.31.Contractor shall install saved for reuse existing dock bumper as indicated on drawings. 32.Contractor shall provide and install new STL edge angle with beveled edge as indicated on drawings. 33.Contractor shall provide and install new Edge-of-Dock mechanical protection as indicated on drawings. 34.Contractor shall provide and install new roll up door motor as indicated on drawings.35.Contractor shall provide and install new signage as indicated on drawings.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA47/Awards/W912PP-16-P-0085.html)
- Record
- SN04280607-W 20160922/160920235902-36cfc3c9aaf68b5a81de6d54e6934180 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |