SOLICITATION NOTICE
47 -- Strainer Assembly
- Notice Date
- 10/19/2016
- Notice Type
- Presolicitation
- NAICS
- 332996
— Fabricated Pipe and Pipe Fitting Manufacturing
- Contracting Office
- Defense Logistics Agency, DLA Acquisition Locations, DLA Land and Maritime, P O Box 3990, Columbus, Ohio, 43218-3990, United States
- ZIP Code
- 43218-3990
- Solicitation Number
- SPE7M316R0025
- Archive Date
- 12/20/2016
- Point of Contact
- mandy l. phipps-kuhlman, Phone: 6146928675
- E-Mail Address
-
mandy.phipps-kuhlman@dla.mil
(mandy.phipps-kuhlman@dla.mil)
- Small Business Set-Aside
- N/A
- Description
- Item Description: in return of the ECP/RFV without processing. (1) Documentation listed in Paragraph 3.3.1 (for ECPs), 3.3.2 (RFV), 3.3.3 (for SCNs) or 3.3.4 (for Notices of Revision (NORs)) of the latest revision of EIA-649-1. (2) DD Form 1692 (current revision) for ECP. (3) DD Form 1694 (current revision) for RFV. (4) DD Form 1695 (current revision) for NOR. 4. DLA's responsibilities: A. Upon receipt of the ECP or RFV, the PCO will ensure that the applicable product specialist receives the copy from DCMA. B. Within five (5) working days from the date of receipt of the Contractor's ECP or RFV from DCMA, the PS must submit the requests and any supporting documentation via a 339 to the appropriate Engineering Support Activity (ESA), when applicable. C. Routine ECPs will be processed within 90 days from receipt by the ESA. RFVs will be evaluated and processed within 30 days from receipt by the ESA or as negotiated with the ESA. (1) The contractor will be notified in writing of approval by the return of an approved copy of the ECP or RFV. Approval will be reflected by signature of the contracting activity or a review activity specifically identified in the contract. (2) The contractor will be notified in writing of disapproval including reason(s) for disapproval. 5. For an approved RFV or an approved ECP, when the request affects the Contract, a modification will be issued to the contract incorporating the applicable requirement changes. Only a Contracting Officer is authorized to issue a modification incorporating the approved RFV and/or ECP. 6. Questions regarding the status of previously submitted ECP or RFV should be directed to the PCO. 7. The submission of an ECP or RFV by the Contractor does not affect the required delivery date of the contract. If a delivery date change is needed, it must be negotiated with the Contracting Officer and documented via modification to the contract. 8. The period of time for evaluation and approval/disapproval of an ECP and/or a RFV, as specified in Paragraph 4. C., shall not constitute excusable delay in the performance of this Contract by the Contractor or in any way relieve the contractor from compliance with the contract delivery schedule. The submission of an ECP and/or RFV by the Contractor shall not preclude the Government from exercising its rights under any clause of the Contract. (End) MERCURY OR MERCURY CONTAINING COMPOUNDS SHALL NOT BE INTENTIONALLY ADDED TO<(>,<)> OR COME IN DIRECT CONTACT WITH<(>,<)> ANY HARDWARE OR SUPPLIES FURNISHED UNDER THIS CONTRACT. EXCEPTION: FUNCTIONAL MERCURY USED IN BATTERIES, FLUORESCENT LIGHTS, REQUIRED INSTRUMENTS; SENSORS OR CONTROLS; WEAPON SYSTEMS; AND CHEMICAL ANALYSIS REAGENTS SPECIFIED BY NAVSEA. PORTABLE FLUORESCENT LAMPS AND PORTABLE INSTRUMENTS CONTAINING MERCURY SHALL BE SHOCK PROOF AND CONTAIN A SECOND BOUNDARY OF CONTAINMENT OF THE MERCURY OR MERCURY COMPOUND. (IAW NAVSEA 5100-003D). ADEQUATE DATA FOR THE EVALUATION OF ALTERNATE OFFERS IS NOT AVAILABLE AT THE PROCUREMENT AGENCY.THE OFFEROR MUST PROVIDE A COMPLETE DATA PACKAGE INCLUDING DATA FOR THE APPROVED AND ALTERNATE PART FOR EVALUATION. DETAILED DRAWING (ONE ITEM) ELECTRIC BOAT CORPORATION 96169 P/N 4687571-0001 DERBYSHIRE MACHINE TOOL CO DBA 71905 P/N 845-4687571-0001 Quantity: 3 Unit of Issue: EA Destination Information: DLA Distribution Puget Sound Delivery Schedule: 310 days The solicitation will be available in FedBizOpps on its issue date of 11/03/2016. Specifications, plans or drawings are not available. This acquisition is for supplies for which the Government does not possess complete, unrestrictive technical data; therefore, the Government intends to solicit and contract with only approved sources under the authority of 10 U.S.C. 2304(c)(1). Approved sources are: ELECTRIC BOAT CORPORATION 96169 P/N 4687571-0001 DERBYSHIRE MACHINE TOOL CO DBA 71905 P/N 845-4687571-0001 While price may be a significant factor in the evaluation of offers, the final award decision will be based upon a combination of price, delivery, past performance and other evaluation factors as described in the solicitation. TYPE OF SET-ASIDE: unrestricted
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/DLA/J3/DSCC/SPE7M316R0025/listing.html)
- Record
- SN04307889-W 20161021/161019234214-f0794fd134b30061dafda2b5ef563a19 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice