Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF NOVEMBER 09, 2016 FBO #5465
SOLICITATION NOTICE

S -- Starkey Snowplow Services

Notice Date
11/7/2016
 
Notice Type
Presolicitation
 
NAICS
488490 — Other Support Activities for Road Transportation
 
Contracting Office
Department of Agriculture, Forest Service, R-6 Contracting East - Wallowa-Whitman NF, 1550 Dewey Avenue, Suite A, Baker City, Oregon, 97814, United States
 
ZIP Code
97814
 
Solicitation Number
AG-04M3-S-17-0004
 
Point of Contact
Andrea J. Stanbro, Phone: 541-523-1252, Lorrie D. Hill, Phone: (541) 523-1233
 
E-Mail Address
astanbro@fs.fed.us, ldhill@fs.fed.us
(astanbro@fs.fed.us, ldhill@fs.fed.us)
 
Small Business Set-Aside
Total Small Business
 
Description
THE SOLICITATION FOR THIS PROJECT WILL BE POSTED ON OR AROUND NOVEMBER 15, 2016. Description of Work: The intent and purpose of this solicitation will be to obtain snow removal services on approximately 30 miles of single and double lane gravel roads on the Starkey Experimental Forest and Range. The service period will be from approximately December 1 and continue until approximately April 30 each year. This is an Indefinite Quantities Contract that will cover three winter seasons, starting December 2016 and ending April 2018. All work hours are estimates - there is no guarantee that actual work hours will be the same as original estimates. The Contractor shall begin snow removal operations within 12 hours after being notified by the Forest Service - alternative contacts must be provided by the contractor so that timely notification can take place. All snow plowing operations shall adhere to the following requirements: a. All work shall be performed in a manner to preserve and protect roads and appurtenances and to prevent erosion damage to roads, streams, and other forest values. b. Banks shall not be undercut, nor shall gravel or other surfacing material be bladed off the road. c. Roadbed drainage ditches and culverts shall be functional when needed during operations and upon completion of operations. d. Snow removal shall be controlled to identify the usable traveled way having roadbed support. Over-width plowing shall be re-shaped as necessary to define the usable road width. e. Drainage holes shall be constructed, spaced, and maintained in the snow berm caused by snow removal, as designated by USFS. f. Snow shall be removed for the entire traveled way, including turnouts, trap access, etc. to provide for safe and efficient use. Intruding windfalls, debris, shough/slide material be removed for the full width of the roadbed, and disposed of at agreed upon locations.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/04M3/AG-04M3-S-17-0004/listing.html)
 
Place of Performance
Address: Starkey Experimental Forest and Range, Starkey, Oregon, United States
 
Record
SN04322277-W 20161109/161107234605-7c631a878733e54b9f87dc611ba73ea9 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.