SOLICITATION NOTICE
C -- AE Repair CHPP Electrical Panel, Phase A - Package #1
- Notice Date
- 12/19/2016
- Notice Type
- Combined Synopsis/Solicitation
- NAICS
- 541330
— Engineering Services
- Contracting Office
- Department of the Air Force, Pacific Air Forces, 354 CONS - Eielson, 2310 Central Ave, Eielson AFB, Alaska, 99702, United States
- ZIP Code
- 99702
- Solicitation Number
- FA5004-AE-FTQW180504
- Archive Date
- 2/2/2017
- Point of Contact
- Tanya L. Gutka, Phone: 9073777061, Donovan A. Wall, Phone: 9073770108
- E-Mail Address
-
tanya.gutka@us.af.mil, donovan.wall@us.af.mil
(tanya.gutka@us.af.mil, donovan.wall@us.af.mil)
- Small Business Set-Aside
- Total Small Business
- Description
- Past Performance Questionnaire SF330 Statement of Work Evaluation Factors Instructions to Offerors ARCHITECT-ENGINEERING (A-E) SERVICES AT EIELSON AFB, AK. "Notice to Offeror(s)/Supplier(s): Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date for receipt of proposals. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs." The 354th Contracting Squadron is seeking qualification packages and past performance information from vendors interested in providing professional architect and engineering services at Eielson AFB, AK to replace the low voltage electrical panels, lighting and wiring throughout the Central Heat & Power Plant (CH&PP). BACKGROUND: The CH&PP is a coal-fired cogeneration power plant providing steam for district heat and electricity for the facilities on Eielson AFB. The plant was originally built in 1952 and has six floors (including the basement). The majority of the low voltage (480V and lower voltage) electrical panels, lighting throughout the power plant and the interconnecting wiring are old and in poor condition. In addition, lighting levels in many parts of the plant are inadequate. In 2012 and 2013, a design was produced for replacement of all of the lighting and lighting panels in the plant as well as in the cooling pond pump house and the ash silo building. At the end of the design, it was determined that the project was too costly and should be broken into three phases, however, funding was not available at the time to modify the existing design contract. The design consultant, however, did provide a rough phasing plan. Since completion of the 2013 design, Boilers 5 and 6 at the plant have been replaced. As part of the boiler replacements, the lighting around those boilers has also been replaced, and other electrical changes have been made. Almost all areas inside the plant are dusty. Many areas are classified as Class II, Div 1 or 2, Group F. In addition, many of the metal surfaces inside may be coated with lead-based paint and there may be asbestos containing materials in the project area. This is a competitive selection process in which competing offeror's qualifications will be evaluated in accordance with (IAW) FAR Part 36.6 to determine the most highly qualified firms. The Government intends to award one Firm Fixed-Price contract. IAW FAR 36.603(b): To be considered for architect-engineer contracts, a firm must file with the appropriate office or board the Standard Form 330, "Architect-Engineer Qualifications," Part II and when applicable, SF 330, Part I. Responders are advised that the Government will not pay for any information or administrative costs incurred in response to this posting; all costs associated with responding will be solely at the interested parties' expense. Failure to respond to this post does not preclude participation in the subsequent technical evaluation so long as a firm's SF 330 is currently on file with the 354th Contracting Squadron. It is the responsibility of the potential offerors to monitor these sites for additional information pertaining to this requirement. This acquisition is being solicited on a 100% Small Business Set-Aside basis. The NAICS 541330 (Engineering Services) applies to this acquisition, with a small business size standard of $15M. The Disclosure of Magnitude for the subsequest construction project is between $1,000,000 and $5,000,000 IAW FAR 36.204(f). The work to be performed shall include but is not limited to: 1. Site investigation, investigation of options, development of design concepts, and production of an investigation report, including a discussion of options with recommendations and cost estimates. 2. Development of the design documents for the selected option - including design analysis, specifications, drawings and cost estimates. 3. Attendance at the various project related meetings and review conferences. 4. Responding to review comments and making revisions to the design as agreed upon during the reviews. 5. Producing and submitting the final project design documents. A-E EXPERIENCE REQUIREMENTS: A-E's experience shall include that which is commensurate with the requirements specific to the scope of design. A. The ideal firm should have experience designing modifications and upgrades to low voltage electrical systems and lighting, especially in operating industrial plants and in hot, dirty and hazardous environments, specifically Class II, Div1 and 2, Group F; experience in surveying existing facilities for hazardous materials, and design including remediation of such hazards as necessary to complete the other work of the project. B. The A-E shall demonstrate that they have experienced personnel with Alaska Registrations, and adequate capacity and depth in the following disciplines: 1. Electrical Engineering C. The A-E shall demonstrate that they have experienced personnel with certification, and adequate capacity and depth in the following discipline: 1. Industrial Hygiene The Air Force requires complete and functional designs that are appropriate for the sub-arctic environment for interior Alaska and that meet all applicable Federal, State, Local, Industry, U.S. Air Force and Eielson AFB requirements. The A-E shall be responsible for all travel and lodging arrangements and expenses involved in the performance of work under this contract. The A-E shall furnish the Air Force with complete and usable products to include: planning documents, investigative reports, study reports, design analyses, project drawings, technical provisions (specifications), equipment layouts, cost estimates, submittal registers, quality assurance plans, constructability review reports, construction bidding amendments, construction contract modifications, and other documents. QUESTIONS: All questions regarding this synopsis must be submitted in writing no later than 5 January 2016. Primary POC email: tanya.gutka@us.af.mil Alternate POC email: donovan.wall@us.af.mil The following documents are considered attachments to this A&E Announcement: Attachment 1 - Instructions to Offerors Attachment 2 - Evaluation Factors Attachment 3 - Statement of Work Attachment 4 - SF 330 Attachment 5 - Past Performance Questionnaire
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USAF/PAF/354CONS/FA5004-AE-FTQW180504/listing.html)
- Place of Performance
- Address: Central Heat and Power Plant, Eielson AFB, Alaska, 99705, United States
- Zip Code: 99705
- Zip Code: 99705
- Record
- SN04355030-W 20161221/161219234326-047e52cb4f548fbfdebe12916b62dbdf (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |