Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF JANUARY 08, 2017 FBO #5525
SOLICITATION NOTICE

Z -- Sidney L. Christie Electrical Project - Package #1

Notice Date
1/6/2017
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
238210 — Electrical Contractors and Other Wiring Installation Contractors
 
Contracting Office
General Services Administration, Public Buildings Service (PBS), ACQUISITION MANAGEMENT DIVISION (3PQ), The Dow Building, 100 S Independence Mall West, 2nd Fl, Philadelphia, Pennsylvania, 19106-1521, United States
 
ZIP Code
19106-1521
 
Solicitation Number
GS-03-P-17-QN-C-0003
 
Archive Date
2/15/2017
 
Point of Contact
DANYEL B. HERDMAN, Phone: 6813134187
 
E-Mail Address
danyel.herdman@gsa.gov
(danyel.herdman@gsa.gov)
 
Small Business Set-Aside
Total Small Business
 
Description
GS-03-P-17-QN-C-0003 - SF 1442 with Attachments WORK LOCATION Sidney L Christie Federal USCH (WV0016FP) 845 5th Avenue Huntington, West Virginia 25701 GENERAL The contractor shall provide all labor, materials, supplies, equipment and supervision to complete the following work: Sidney L Christie Federal USCH - Huntington, WV - general scope of work will be to provide electrical/data feed conduits with pull rope on the 1st and 2nd Floor Courtroom areas, select demolition and re-installations, structural blocking, millwork, painting, carpet patching/retrofitting, and existing finishes protection. Work shall include, but is not limited to, the following: GENERAL NOTES: • Provide new 1 ¼" conduit feeds to various areas to support new data and electrical installations. Areas included are exterior walls 1st Floor Courtroom, floor boxes (1) for 1st Floor Courtroom, interior jury railing relocation and addition of rail electrical boxes of 2nd Floor Courtroom, floor boxes (2) for 2nd Floor Courtroom, abandon in place electrical components of Inca Lift for 2nd Floor Courtroom. • All conduit paths shall terminate in 1st Floor Server Room. Routing of conduits may be established above suspended ceilings in selected areas and supported by "J" hooks (by others). Floor coring/boring will be required for floor boxes in both Courtroom areas (1st and 2nd Floors). At 1st Floor locations, all conduits shall be routed to Basement space and proceed to a floor entry point of the 1st Floor Server Room. Exposed conduits in finished spaces will not be acceptable. • Electrical boxes for jury rails, data and electrical shall be steel and blank covers provided. Existing electrical boxes called out to be relocated can be re-used with existing covers (jury rails/TV electrical and cable). • Cable/Data wiring conduits once daylighted above suspended ceiling (in 1st Floor hallway) can be terminated and cable/data wire supported on "J" hooks to Server Room location. Penetrations into Server Rooms through wall or floor deck will require sleeve or conduit to meet applicable codes. • Floor boxes for each Courtroom shall match those existing. Additional specifications on floor boxes shall be provided at mandatory Pre-Bid Meeting. Pre-Bid Meeting date and time to be determined. • Structural blocking shall be ¾" CDX plywood or 2" x 12" stock lumber. Structural blocking shall be installed to provide adequate anchoring points in the wall cavity and provide a solid backing for proposed new flat screen (up to 90") TV. • The existing Inca Lift shall be disabled in the "closed" position. The existing wall mounted TV shall be removed from the cavity and returned to the USDC prior to disabling of the Inca Lift. 2ND FLOOR COUTROOM SCOPE OF WORK • Jury Rail o Furnish and Install one (1) new duplex receptacle and one (1) new data/video jack on the interior side of the jury rail to support one (1) additional monitor. The existing three (3) duplex receptacles and data/video jacks are to be relocated on the jury rail to provide equal distance to accommodate the 4th monitor. o Furnish and install four (4) new pathways from the jury rail monitors to the 1st Floor Server Room in 1 ¼" conduit. Note: Conduits can be turned in jury rail wall and routed to one exit point through floor deck. o Furnish and install three (3) new pathways form the jury rail to the 1st Floor Server Room to accommodate three (3) jury rail mounted flat screens in 1 ¼" conduit. Note: Conduits can be turned in jury rail wall and routed to a second exit point through floor deck. o Jury rail millwork shall be carefully removed (including foot rail and kick plate). All millwork damaged during removal shall be replaced and match existing finish and style. The interior portion of the jury rail panels shall be re-installed to be removable. Submittals on all jury rail millwork finish and construction shall be required and approvals needed prior to fabrication and re-installation. • Floor Boxes (2) o Furnish and install two (2) floor boxes with duplex receptacle (minimum) and as per location on drawings. Floor boxes shall be held as closely to the galley rail and interior wall as possible. A submittal on the proposed floor box will be required prior to ordering. Note that a carpet remnant will need to be saved from the existing carpet cut to be placed back into the floor box. o The existing carpet is to be carefully cut and floor boxes installed so as not to require additional carpet material. No carpet attic stock is available. Due care should be taken to protect the carpet to the maximum extent possible during construction activities. • Inca Lift o Furnish and install one (1) duplex receptacle o Furnish and install one (1) new pathway from behind TV to the 1st Floor Server Room to accommodate data/video jacks. 1 ¼" conduit required in all wall cavities and through floor decks. o Provide structural blocking as required to support new flat screen (up to 90") TV. Note that the new TV will not be contained in the Inca Lift cavity but will be stationary and installed with standard TV mount. Submittal on TV mounting method and bracket shall be required. 1st FLOOR COURTROOM SCOPE OF WORK • Floor Boxes (1) o Furnish and install floor box with quad receptacle as shown on drawing. A submittal of the floor box will be required prior to ordering. Note that a carpet remnant will need to be saved from the existing carpet cut to be placed back into the floor box. o The existing carpet is to be carefully cut and floor boxes installed so as not to require additional carpet material. No carpet attic stock is available. Due care should be taken to protect the carpet to the maximum extent possible during construction activities. • Wall Mounted TV o Relocate electric and data jacks from behind existing TV to a new location on same wall. Exact location to be determined. o Existing support panel of TV is to be removed in its entirety and the wall patched. o Furnish and install blocking support for wall mounted TV in new location. o Painting of entire wall from corner to corner/floor to ceiling will be required and to match existing paint. 1st FLOOR SERVER ROOM • Furnish and install four (4) new quad receptacles. Locations to be determined. Site Visits • Any site visits to review field conditions or for clarification must be coordinated and scheduled with the Huntington Field Office Building Manager, Meghan Spensky (681-313-4191) or Construction Manager, Greg Perry (304-389-1237). PERIOD OF PERFORMANCE The project is expected to be substantially completed by: 4/1/2016
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/GSA/PBS/3PK/GS-03-P-17-QN-C-0003/listing.html)
 
Place of Performance
Address: Sidney L. Christie Federal Building, 845 Fifth Avenue, Huntington, West Virginia, 25701, United States
Zip Code: 25701
 
Record
SN04365530-W 20170108/170106234027-af3e7c59c4dbb837566c3ae5957385b0 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.