Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF FEBRUARY 02, 2017 FBO #5550
SOLICITATION NOTICE

10 -- B61 Mod 12 Life Extension Program (LEP) Tail Kit Assembly (TKA) Production Pre-solicitation Notice

Notice Date
1/31/2017
 
Notice Type
Presolicitation
 
NAICS
336415 — Guided Missile and Space Vehicle Propulsion Unit and Propulsion Unit Parts Manufacturing
 
Contracting Office
Department of the Air Force, Air Force Materiel Command, AFNWC/PZNE - Eglin, 207 W D Ave, Bldg 349, Ste 626, Eglin AFB, Florida, 32542, United States
 
ZIP Code
32542
 
Solicitation Number
FA2103-18-R-0061
 
Archive Date
3/21/2017
 
Point of Contact
Michelle C Rivera, Phone: 850-882-6259, David Fennell,
 
E-Mail Address
michelle.rivera.3@us.af.mil, david.fennell.2@us.af.mil
(michelle.rivera.3@us.af.mil, david.fennell.2@us.af.mil)
 
Small Business Set-Aside
N/A
 
Description
This notice serves as a pre-solicitation notice/procurement synopsis for The Department of Defense, United States Air Force (USAF), Air Force Materiel Command (AFMC), Air Force Nuclear Weapons Center (AFNWC), B61 Mod 12 LEP TKA Program Office Lot buys 1-2 (FY18-21). The B61 Mod 12 LEP TKA Division, in preparation for its 1 st production run of B61 Mod 12 LEP TKA, is envisioned to award a sole source contract for Production/Sustainment, including engineering and logistics support, possible field service representatives, sustainment and maintenance of the TKAs after production, and support of annual flight tests. Additionally, B61Mod 12 LEP TKA trainers and long lead assets to support LRIP will be purchased on the existing Engineering and Manufacturing Design (EMD) contract. The solicitation/award is expected to include a basic period (Lot1/FY18), one option period (Lot 2/FY19) and a possible third option for the TKA trainers. The solicitation/award is expected to include the production of approximately 813 TKAs, including trainers, within a 24 month period. Inasmuch as The Boeing Company, the current provider of the B61 Mod 12 LEP TKA is currently in the EMD phase of the program, the Government will not be able to provide government property/government special tooling/special test equipment/technical data package to any new prospective source. Therefore, the fulfillment of the supplies/services listed above requires substantial initial investment and an extended period of preparation for manufacture. Anticipated date of letter of solicitation for Lots 1-2 production and associated efforts is on or about 18 April 2017; date of closing response is on or about 29 December 2017. This acquisition is contemplated sole source under authority of FAR 6.302-1(a)(2)(ii), "Only One responsible Source and no other supplies or services will satisfy agency requirements" to The Boeing Company, 6200 JS McDonnell Blvd., Saint Louis, MO 63134-1939. Should your firm desire subcontracting opportunities, contact Ms. Sarah Boyett (The Boeing Company) at the above address or phone (314)563-6701. The date of response for this pre-solicitation/synopsis for the B61 Mod 12 LEP TKA Program Office is 6 March 2017. Note: This pre-solicitation/synopsis supersedes the sources sought released on 18 August 2016 under Solicitation Number FA2103-18-R-0061, which is no longer valid. Communication concerning this acquisition should be directed to Michelle Rivera, Contract Specialist, michelle.rivera.3@us.af.mil or Mr. David Fennell, Contracting Officer, david.fennell.1@us.af.mil.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/notices/2eb23b4715a6bd91d48e5830238fd3b2)
 
Record
SN04385920-W 20170202/170131234353-2eb23b4715a6bd91d48e5830238fd3b2 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.