Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF FEBRUARY 11, 2017 FBO #5559
SOURCES SOUGHT

Z -- Fish Weir, Fish Passage at Foster Dam, Oregon

Notice Date
2/9/2017
 
Notice Type
Sources Sought
 
NAICS
332312 — Fabricated Structural Metal Manufacturing
 
Contracting Office
Department of the Army, U.S. Army Corps of Engineers, USACE District, Portland, Attn: CECT-NWP, PO Box 2946, Portland, Oregon, 97208-2946, United States
 
ZIP Code
97208-2946
 
Solicitation Number
W9127N-17-R-0057
 
Point of Contact
Robbie Newland, Phone: 5038084634, Clovia Sue Jones, Phone: 5038084632
 
E-Mail Address
robbie.newland@usace.army.mil, sue.jones@usace.army.mil
(robbie.newland@usace.army.mil, sue.jones@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Description
This summary does not provide the technical detail for particular work activities, but describes the work as a whole, providing overall perspective to the separate tasks and their interrelationships. The purpose of this project is to improve downstream fish passage at Foster dam with a new Fish Weir. The features of work include an improved weir that operates with flows of 300 cfs to 860 cfs, three (3) new stoplogs, and the demolition of an existing fish crane. The fish weir will be installed in existing spillway stoplog slots and will pass water onto the spillway through an approximate opening of 14ft x 9ft. The weir can be constructed offsite. The weight of the new weir is limited by the lifting capacity of the deployment truck-crane on the bridge overhead; the weir is designed to weigh less than 22,000lbs. The new stoplogs will be deployed below the fish weir to set it at elevations required to pass desired flowrates during low and high pool. The existing fish crane is a concrete structure crossing the entire roadway 35 feet above the deck. Demolition and removal of the crane will allow proper positioning of the crane and will facilitate the delivery and installation of the weir and stoplogs. The demolition involves removing all equipment from the crane including all lights, hoists, gearboxes, drums, conduit, etc. Location: Foster Dam is located at river mile 37.9 on the South Santiam River at Foster, Oregon; 38.5 miles above the confluence of the North and South Santiam Rivers and approximately 25 miles southeast of Albany, Oregon. Timeframe: Fabrication is anticipated to begin in October 2017 with a completion date no later than March 1st, 2018.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA57/W9127N-17-R-0057/listing.html)
 
Place of Performance
Address: Foster Dam is located at river mile 37.9 on the South Santiam River at Foster, Oregon; 38.5 miles above the confluence of the North and South Santiam Rivers and approximately 25 miles southeast of Albany, Oregon., Foster, Oregon, 97345, United States
Zip Code: 97345
 
Record
SN04397187-W 20170211/170209234359-2509cf804d5150b95a713886cff3c5d2 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.