Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF FEBRUARY 11, 2017 FBO #5559
MODIFICATION

Z -- SSA-OIG Initial Space Alteration - Amendment 2

Notice Date
2/9/2017
 
Notice Type
Modification/Amendment
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
General Services Administration, Public Buildings Service (PBS), Boston Service Center Branch (1PSM), 10 Causeway Street, Boston, Massachusetts, 02222-1077, United States
 
ZIP Code
02222-1077
 
Solicitation Number
GS-01-P-17-BW-C-0009
 
Point of Contact
Carolyn L. Weekes, Phone: 6175655059, Donna M. Maffeo, Phone: (617) 565-6012
 
E-Mail Address
carolyn.weekes@gsa.gov, donna.maffeo@gsa.gov
(carolyn.weekes@gsa.gov, donna.maffeo@gsa.gov)
 
Small Business Set-Aside
Total Small Business
 
Description
Amendment 0003 Proposal due date changed reference Amenment 0003 Title: SSA-OIG Initial Space Alteration, Manchester, NH Classification: Z NAICS: 236220, Commercial and Institutional Building Construction. This procurement is a 100% Total small business Set-aside. The estimated cost is between $250,000.00 to $500,000.00. The Small Business Size standard is $36.5 MILLION. A project for the initial space alteration (ISA) of third floor space in the Norris Cotton Federal Building (NCFB) is to be completed for SSA-OIG. The work consists of the demolition of the following building items: GWB metal stud partitions, electrical power infrastructure, data infrastructure and cabling, millwork recovery, HVAC above ceiling equipment, SAT system, overhead lighting system, sprinkler system and flooring systems. The work will then consist of the interior installation / build out of the 3 rd floor suite to include: GWB metal stud partition construction, security mesh, electrical power system, data and voice infrastructure and cabling, HVAC system equipment, SAT system, lighting system, electronic security system, split AC system, sprinkler system reconfiguration and flooring system. Two ancillary efforts are required on the 4 th floor of NCFB: 1 -installation of data and power in a conference room and 2 - installation of recovered millwork from the 3 rd floor into a suite on the 4 th floor.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/GSA/PBS/1PMPODM/GS-01-P-17-BW-C-0009/listing.html)
 
Place of Performance
Address: Norris Cotton Federal Building, 275 Chestnut Street, Manchester, New Hampshire, 03101, United States
Zip Code: 03101
 
Record
SN04397773-W 20170211/170209234849-e3ab332b8f228fb836f0405653c7736b (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.