MODIFICATION
C -- Indefinite Delivery/Indefinite Quantity Contract for A-E Services for the Preparation of Navy and Marine Corps National Environmental Policy Act (NEPA) and Related Documents for NAVFAC Pacific AOR
- Notice Date
- 2/10/2017
- Notice Type
- Modification/Amendment
- NAICS
- 541330
— Engineering Services
- Contracting Office
- N62742 NAVFAC PACIFIC, ACQUISITION DEPARTMENT 258 Makalapa Drive, Suite 100, Pearl Harbor, HI
- ZIP Code
- 00000
- Solicitation Number
- N6274217R1804
- Response Due
- 3/15/2017
- Archive Date
- 10/31/2017
- Point of Contact
- Norine E. Horikawa 808-471-4666
- Small Business Set-Aside
- N/A
- Description
- 02/10/2017 - Modification 1 to the synopsis. Criterion 2, Professional Qualifications of the Key Personnel, Submission Requirements: SF330, Part 1, Section E and G is deleted in its entirety and replaced with the following: SUBMISSION REQUIREMENT: SF330, Part1, Section E and G. Provide a brief but complete resume as instructed in Section E for each proposed key personnel who will participate significantly in the work required for this contract. Maximum of 2 single sided or one double sided page. Submit one resume for each key personnel, with the exception of the Project Managers/Senior Planners for which a firm shall submit a minimum of three (3) and a maximum of five (5) key personnel. Should the SF330 submit more than one resume for each of the other key personnel, only the first will be evaluated. All others will be disregarded. Each resume shall include a maximum of five (5) projects that were completed or substantially completed within the past five (5) years that best illustrate the individual ™s experience relevant to the requirements of this contract. For biologists, identify the threatened or endangered species for which the individual possesses U.S. Fish and Wildlife Service survey permits, and describe experience surveying plant and animal species in Hawaii, Japan, and other Pacific islands. Provide resumes only for those key personnel who will actually perform work under the proposed contract. Complete Section G as instructed to indicate key personnel participation in the projects submitted for evaluation in Criterion 1. Key personnel identified under this criterion shall also be shown with their roles on the Organizational Chart provided under Section D. All other terms and conditions remain unchanged. Notice No. 1, Questions and Answers is posted this date.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/DON/NAVFAC/N62742/N6274217R1804/listing.html)
- Record
- SN04398766-W 20170212/170210234147-e29ad76610bda2ec424e859e2fd7abdc (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |