Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF FEBRUARY 15, 2017 FBO #5563
MODIFICATION

A -- NASA/GSFC Partnership Opportunity Document (POD) For Planetary Space Flight Instrument Electronics Development

Notice Date
2/13/2017
 
Notice Type
Modification/Amendment
 
NAICS
336419 — Other Guided Missile and Space Vehicle Parts and Auxiliary Equipment Manufacturing
 
Contracting Office
NASA/Goddard Space Flight Center, Code 210.S, Greenbelt, Maryland, 20771, United States
 
ZIP Code
20771
 
Solicitation Number
NASA-GSFC-Partnership-Opportunity-Document-For-Planetary-Space-Flight-Instrument-Electronics-Development
 
Point of Contact
Julie Anne Janus, Phone: 3012864931, Irene Bibyk, Phone: (301) 286-6803
 
E-Mail Address
julie.a.janus@nasa.gov, Irene.Bibyk@nasa.gov
(julie.a.janus@nasa.gov, Irene.Bibyk@nasa.gov)
 
Small Business Set-Aside
N/A
 
Description
Partnership Opportunity Document (POD) For NASA's Goddard Space Flight Center (GSFC) Planetary Space Flight Instrument Electronics Development dated February 13, 2017 1.0 Introduction and Scope This partnership opportunity is for NASA Planetary Mission Opportunities in 2017. NASA's GSFC is seeking partners for spaceflight instrument development for potential proposals to these opportunities. GSFC mission teams will be submitting proposals that will include New Frontiers Announcement released in December 2016. This opportunity will be a two-step process, with the first proposal response primarily focused on the scientific merit and technical feasibility of the proposed mission and its associated scientific investigation. The initial submissions will then be down-selected after formal peer review and the resultant subset of proposals will be funded to perform Phase A mission concept studies. During Phase A, proposals will be expanded and refined to detail the entire end-to-end life cycle concept, with greater attention to engineering implementation, cost, and schedule. Information on the New Frontiers-4 AO can be found in the Community Announcement Regarding New Frontiers Program Draft Announcement of Opportunity: https://nspires.nasaprs.com/external/solicitations/summary.do?method=init&solId={F65A5657-0E72-362E-2D4C-DE87A16A82B7}&path=open OR https://newfrontiers.larc.nasa.gov/announcements.html The time frame for the solicitation is intended to be: AO Release Date...............................................................December 9, 2016 Preproposal Conference (target)......................................January 17, 2017 (target) Notice of Intent to Propose Deadline...............................January 20, 2017 Electronic Proposal Submittal Deadline at 11:59 p.m. Eastern Time...............................................April 28, 2017 Letters of Commitment Due (with Proposal ).....................April 28, 2017 Deadline for Receipt of Proposal on CD-ROMs at 5:00 p.m. Eastern Time..................................................May 5, 2017 Step-1 Selections Announced (target)...............................November 2017 (target) Initiate Phase A Concept Studies (target)..........................December 2017 (target) Phase A Concept Study Reports Due (target)....................December 2018 (target) Down-selection of Investigation(s) for Flight (target)........July 2019 (target) Launch Readiness Date....................................................... NLT December 31, 2025 Responses to this partnership opportunity are solicited from any interested and qualified teaming partners to help prepare the NASA/GSFC concepts for proposal submittal and to provide a flight qualified instrument subsystem should the instrument be selected for flight. The flight system GSFC is interested in finding partners for is a high-reliability, low cost, compact electronics package for interplanetary missions. For this partnership opportunity dealing with the preparation of the initial submission, there will be no exchange of funds between the teaming partners. Funding will be available for Phase A and subsequent phases should the investigation be approved to continue through the mission-defined gates for flight. NASA/GSFC reserves the option to not select any teaming partners under this POD offering. 2.0 Overview GSFC is interested in finding partners to support the development of spaceflight mass spectrometer electronics packages, potentially including low- and high-voltage DC and RF power supplies, analytical instrument micro-controllers, valve, heater, and temperature sensor controllers, harnessing, and associated Electrical Ground Support Equipment (EGSE) (e.g., instrument simulators) to integrate and service a spaceflight science instrument being developed for the mission opportunities described above. Additional information and detailed requirements will be available to those Notice of Interest respondents (see 6.0). 3.0 Pre-selection Support 3.1 Initial Proposal Support SOW: It is expected that the selected respondent will provide support using their own resources to help develop and write the proposal in response to the opportunities in the area of the electronics, harnessing and associated EGSE. This will involve meeting with the scientists and the overall instrument engineering team: to help define the end-to-end performance requirements, including interfaces to the various subsystems and the spacecraft; to define the flight instrument electronic architecture; to identify study topics; and to predict performance. This will include cost estimation for all development phases. The period of performance for this interval is the timeframes shown above from POD selection to initial proposal submission. 3.2 Phase A Study and Phase A Proposal Support SOW: If the instruments are selected for Phase A studies, the proposal team will receive funding to conduct a Phase A study and submit a detailed Concept Study Report (CSR) to NASA. The respondent providing the electronics system will be allocated a portion of this funding to perform trade studies as identified in the initial proposal. The respondent will also be expected to contribute to designing, documenting, and costing the electronics system design, fabrication, integration and testing for inclusion in the final CSR. The period of performance for this interval is detailed in the above timelines. 3.3 POD Response Instructions for Pre-Selection Support The respondent shall: 1)Demonstrate understanding and extensive experience in the design, fabrication, integration and testing of spaceflight electronic systems (including harnessing and associated EGSE) for spaceflight instruments for interplanetary science applications. Highlight particularly critical or challenging areas for the design of the electronics system, harnessing approach, or EGSE. The respondent shall: •Provide a technical summary/description of the proposed hardware including relevant heritage, •Explain what types of capabilities and cost-effective implementation approaches the electronics provide for the intended target instrument(s). 2)Identify available design and modeling capabilities required to support development of the instrument electronics, harnessing and associated EGSE and what level of experience in similar spaceflight electronics, harnessing and associated EGSE relevant personnel possess. 3)Provide any recommended potential study topics related to the electronics development. 4)Indicate what level of resources would be allocated to the proposal phase of support. •Discuss skills that will be provided and ideas at the level of conceptual design and important analysis and trade studies that will be needed to develop the system. 5)Identify the pertinent instruments for which they have provided support for proposal writing in the area of space flight electronics design, fabrication, integration and testing: •Provide data on scope of the electronics design, the role that they played in the proposal process, and the portions of the proposal they have written or provided assistance in writing and provide a customer reference POC. •Describe how this proposal role mapped to their role in the end instrument and if the scope changed explain why. 4.0 Development Support SOW: At the end of Phase A another down-select occurs. If the mission is selected for development and launch, the respondent will be responsible for the design, development, and test of the proposed electronics system. The respondent is responsible for: identifying electronics system requirements and providing all aspects of the system (either directly, through purchasing or teaming arrangements). The period of performance for this interval is expected to last approximately 30-45 months. The date will depend upon selection timelines and budget allocations. POD Response Instructions for Development Support The respondent shall: 1)Describe your team's experience in similar spaceflight systems applications. 2)Identify available design and modeling capabilities required to support development of the electronics system. 3)Identify fabrication and testing facilities that will be required to support development and test of the electronics system. 4)Identify which missions they have successfully supported in this capacity and provide a customer reference POC. •Provide information on recent similar electronics systems designed and delivered, and how that experience is applicable to the mission. Basic information on scope of work, and how well the fielded electronics system met the requirements (cost and technical, and how well they met the proposed schedules). 5)Provide a very Rough Order of Magnitude (ROM) cost estimate and timeline for the scope of the design, fabrication, and testing of the electronics, harnessing and associated EGSE. This ROM will not be considered a binding commitment, but will serve as a consideration during the partnership evaluation. Cost of the electronics, harnessing and associated EGSE will be an important consideration. The respondent should comment on the reasonableness of the placeholder cost and provide historic justification for the ROM. 6)List ideas and methods of keeping costs low and the risk of cost growth low, including how they would utilize heritage designs and components or existing open market hardware to minimize costs and provide a more robust system. Identify cost savings or efficiencies of designing, fabricating, testing similar electronic systems that may be common to all instruments. 7)Identify which missions they have successfully supported in this capacity and provide a customer reference POC. 8)Provide information on recent similar electronics, harnessing and associated EGSE designed and delivered, and how that experience is applicable to the targeted instrument. Basic information on scope of work, and how well the fielded electronics, harnessing and associated EGSE met the requirements (cost and technical) as well as how well they met the proposed schedules. 5.0 Additional Information The respondent may provide any additional information on any other pertinent electronics, harnessing and associated EGSE for which his/her establishment and any partners/vendors have provided electronics, harnessing and associated EGSE, and identify the relevant details of similar systems. Also, identify any other ideas and related activities, which your organization is or has been involved with, and the significance of that activity to the target instrument(s) you are responding to. 6.0 General Instructions for POD Response Potential respondents are asked to contact the GSFC Point of Contact as soon as possible after release of this document with a Notice Of Interest (intentionally not called notice of intent). The Notice of Interest should be received 5 business days after publication of this action. This contact does not create an obligation to respond to the POD, but allows GSFC to disseminate more details on the parameters of the electronics system being considered and provide answers to questions from potential partners. All Notice of Interest respondents will receive further details on the missions that will facilitate a focused response. These details are competition sensitive and not to be shared outside the teams necessary to prepare a full response. All questions and answers will be sent to those who responded to the Notice of Interest, while the source of the questions shall be held confidential. Questions and answers that contain information unique to a respondent's proprietary approach will not be shared if they are identified as such. The answers provided to all qualified Notice Of Interest responders are vital to focused responses. Questions can be sent to the contact listed below via email. For purposes of this partnership opportunity, the primary contact is Irene Bibyk, Irene.Bibyk@nasa.gov, 301.286.6803. The back-up contact is Michael Adams, Michael.L.Adams@nasa.gov, 301.286.2010. Responses to the Partnership Opportunity Document [POD] shall: 1)Be in a presentation format (viewgraphs) that shall not exceed 30 pages. The font size for the text shall be no smaller than 12 point. 2)Be specific about the electronics, harnessing and associated EGSE the response is for. 3)Address all requirements noted in sections 3.0 through 7.0 of this document. Responses will be treated as proprietary information and controlled as such. The respondents shall deliver the requested information in presentation format. Final presentation packages must be received by 4:00 ET, February 21, 2017. Presentations are to be delivered electronically to Irene Bibyk at the above listed email address. 7.0Acronyms List AOAnnouncement of Opportunity CSRConcept Study Report EGSEElectrical Ground Support Equipment EDTEastern Daylight Time GSFCGoddard Space Flight Center PEAProgram Element Appendix POCPoint of Contact PODPartnership Opportunity Document ROMRough Order of Magnitude SOWStatement of Work
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/notices/f29d4dcf88aba7cfa18579595280037d)
 
Record
SN04400202-W 20170215/170214100354-f29d4dcf88aba7cfa18579595280037d (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.