Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF FEBRUARY 16, 2017 FBO #5564
DOCUMENT

45 -- Semi-annual Water Temperature Testing - Attachment

Notice Date
2/14/2017
 
Notice Type
Attachment
 
NAICS
238220 — Plumbing, Heating, and Air-Conditioning Contractors
 
Contracting Office
Department of Veterans Affairs;Network Contracting Office 9;1639 Medical Center Parkway;Suite 400;Murfreesboro TN 37129
 
ZIP Code
37129
 
Solicitation Number
VA24917Q0344
 
Response Due
2/22/2017
 
Archive Date
4/23/2017
 
Point of Contact
Trudy Bryant
 
E-Mail Address
de.bryant@va.gov<br
 
Small Business Set-Aside
N/A
 
Description
COMBINED SYNOPSIS/SOLICITATION - This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in the Federal Acquisition Regulation (FAR) Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued. (ii) This solicitation is issued as a request for quote (RFQ). Submit a written proposal on RFQ reference number VA249-17-Q-0344. (iii) This is a solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2005-95 (effective 1/13/2017). (iv) This solicitation is set aside service disabled veteran owned small businesses the associated NAICS code is 238220 and the small business size standard is $10 Million dollars. (v) This combined synopsis/solicitation is for the following commercial service: CLIN: 1001 Semi-Annual Testing 1 JB Options: Base Period: 3/1/2017 thru 9/30/2017 Option Year 1: 10/1/2017 thru 9/30/2018 Option Year 2: 10/1/2018 thru 9/30/2019 Option Year 3: 10/1/2019 thru 9/30/2020 Option Year 4: 10/1/2021 thru 9/30/2021 (vi) Description of requirements is as follows: The Murfreesboro Veteran Affairs Medical Centers has a requirement for semi-annual water temperature testing services per the attached Statement of Work (SOW) and listing of faucets. (vii) Anticipated period of performance is 1 March through 30 Sep 2017 for the base period with (4) annual option periods. (viii) FAR 52.212-1, Instructions to Offerors - Commercial Items (Jun 2008), applies to this acquisition. Addenda: Quotes must be submitted in according to the price schedule. (ix) Quotes will be evaluated in accordance with FAR 13.106-2. Award will be made in response to the lowest priced quote meeting the needs of the government. The needs of the government are expressed in the attached statement of work (SOW). (x) FAR 52.212-3, Offeror Representations and Certifications -- Commercial Items (Apr 2012) An offeror shall complete only paragraphs (b) of this provision if the offeror has completed the annual representations and certificates electronically via the SAM website at https://www.sam.gov/portal/public/SAM/. If an offeror has not completed the annual representations and certifications electronically at the SAM website https://www.sam.gov/portal/public/SAM/ the offeror shall complete only paragraphs (c) through (o) of this provision. (xi) The clause at FAR 52.212-4, Contract Terms and Conditions-Commercial Items, applies to this acquisition; as well as the following addenda: N/A, no addenda to subject clause. (xii) The clause at FAR 52.212-5, Contract Terms and Conditions Required to Implement Statutes or Executive Order-Commercial Items (Deviation), applies to this acquisition. FAR 52.219-6, FAR 52.219-13, FAR 52.219-27, FAR 52.222-36, FAR 52.222-50, FAR 52.223-18, FAR 52.225-1, FAR 52.232-33, FAR 52.222-43. (xiii) The date, time, and place for submission of quotes is as follows: February 22, 2017, 8::00 A.M. (Central Time). Submit written quotes (oral quotes will not be accepted) via mail, email to: Contract Specialist Trudy Bryant, Department of Veterans Affairs, Network Contracting Office 9, 1639 Medical Center Parkway, Suite 400 Murfreesboro, TN 37129; e-mail: gertrude.bryant@va.gov. (xiv) For further information regarding this solicitation, offerors can contact the following individual: Trudy Bryant, via email at Gertrude.bryant@va.gov. Statement of Work Domestic Hot Water Temperature Monitoring PART I: GENERAL Introduction This requirement is to provide a temperature monitoring service contract, a base year +4 years on all faucets in patient care areas (approximately 800 each) at the Tennessee Valley Healthcare System (TVHS), Alvin C. York VA Medical Center, 3400 Lebanon Pike, Murfreesboro Tennessee, 37129. Scope of work The contractor is to provide certified technicians, transportation, equipment, maintenance parts, materials, specialty tools and supervision to complete the semi-annual temperature measuring and recording of all faucets in patient care areas at TVHS per specification. Period of Performance The base year period of performance for this requirement is from March 1 2017 through September 31 2017. Succeeding years will be from October 1 through September 31. Scheduling The Contractor will schedule with the COR to perform the temperature testing and recording during normal working hours. Hours of work shall be from 8:00 am to 4:30 pm, Monday through Friday, excluding federal holidays. This contract does not include any requirements for emergency call backs or emergency repairs. Delivery The Contractor will coordinate the testing with the COR. The contractor will schedule the date and time with the appropriate COR seven (7) workdays prior to accomplishing the work. York Campus, Murfreesboro Semi-annual testing and recording will be performed during the months of November and May. The first year will be during the months of March and September. Progress and Compliance The Contractor will provide the CORs electronic files of temperature testing within 10 working days upon completion of all testing. Information will be recorded on Excel spreadsheets provided by the COR. PART II: REQUIREMENTS A. Semi-Annual inspection requirements in accordance to: Water testing shall occur as follows: Turn on hot water and allow it to reach maximum temperature. Measure temp using a digital thermometer. Temp must be between 100 and 110 degrees F. VHA Directive 1061, Prevention of Healthcare associated Legionella disease and scald injury from potable water distribution systems, dated August 13, 2014. Record on spreadsheet provided as actual temperature and PASS/FAIL (between 100 and 110 degrees F). Failures must be immediately reported to medical center personnel escorting for corrective action. Retest immediately after corrective action taken by engineering personnel, before moving on to next test and document results on spreadsheets provided by VA. B. Personnel and other requirements The contractor shall identify which employees will be working under the awarded contract. Contractor personnel shall include employees, sub-contractors, subcontractor employees, suppliers and delivery personnel. The Contractor is required to check in with the COR prior to starting any testing. The Contractor will visit the job site prior to performing any testing to become familiar with the locations of the faucets. Parking will be arranged for contractor service vehicles at the York Campus. Tentative Listing of Faucets, Sinks and Showers Bldg # Room # Description Temp Reading Inspection Date Inspection Date Temp Reading Pass/Fail Corrective Action 2 105F SINK X 2 2 105G SINK       1 101 SINK 1 102 SINK 1 107 SINK X 2 1 141 SINK 1 153 SINK X 2       1G G32 SINK 1G G35 SINK X 2 1G G36F SINK 1G G37D SINK 1G G39J SINK       120G G09E SINK 120G G18A SINK 120G G20A SINK       120 100 SINK 120 105A SINK 120 105B SINK 120 105C SINK 120 105D SINK 120 105F SINK 120 105G SINK 120 105H SINK 120 105J SINK X 2 120 105K SINK 120 105L SINK Bldg # Room # Description Temp Reading Inspection Date Inspection Date Temp Reading Pass/Fail Corrective Action 1A 206 SINK 1A 209 SINK 1A 209A SINK AND SHOWER 1A 213 SINK 1A 213A SINK AND SHOWER 1A 214 SINK 1A 216 SINK 1A 216A SINK AND SHOWER 1A 218 SINK 1A 218A SINK AND SHOWER 1A 219 SINK 1A 221 SINK 1A 221A SINK AND SHOWER 1A 222 SINK 1A 226 SINK 1A 226A SINK AND SHOWER 1A 227 SINK 1A 228 SINK 1A 228A SINK AND SHOWER 1A 229 SINK 1A 230 SINK 1A 230A SINK AND SHOWER 1A 234 SINK 1A 238 SINK 1A 241 SINK 1A 241A SINK AND SHOWER 1A 243 SINK 1A 246 SINK 1A 246A SINK AND SHOWER 1A 247 SINK Bldg # Room # Description Temp Reading Inspection Date Inspection Date Temp Reading Pass/Fail Corrective Action 1A 250 SINK 1A 252 SINK 1A 256 SINK 1A 261 SINK 1A 261A SINK AND SHOWER 1A 262 SINK 1A 262A SINK AND SHOWER 1A 263 SINK 1A 263A SINK AND SHOWER 1A 265 SINK 1A 265A SINK AND SHOWER 1A 266 SINK 1A 266A SINK AND SHOWER 1A 267 SINK 1A 267A SINK AND SHOWER 1A 268 SINK 1A 268A SINK AND SHOWER 1A 270 SINK 1A 271 SINK 1A 271A SINK AND SHOWER 1A 272 SINK 1A 272A SINK AND SHOWER Bldg # Room # Description Temp Reading Inspection Date Inspection Date Temp Reading Pass/Fail Corrective Action 1B 305 SINK 1B 305A SINK AND SHOWER 1B 309 SINK 1B 309A SINK AND SHOWER 1B 313 SINK 1B 313A SINK AND SHOWER 1B 313B SINK 1B 317 SINK 1B 317A SINK AND SHOWER 1B 318 SINK 1B 320 SINK 1B 320A SINK AND SHOWER 1B 321 SINK 1B 325 SINK 1B 325A SINK AND SHOWER 1B 326 SINK 1B 327 SINK 1B 327A SINK AND SHOWER 1B 328 SINK 1B 329 SINK 1B 329A SINK AND SHOWER 1B 333 SINK 1B 338 SINK 1B 338A SINK AND SHOWER 1B 339 SINK 1B 341 SINK 1B 341A SINK AND SHOWER 1B 344A SINK 1B 345 SINK 1B 345A SINK AND SHOWER Bldg # Room # Description Temp Reading Inspection Date Inspection Date Temp Reading Pass/Fail Corrective Action 1B 346 SINK 1B 352 SINK 1B 352A SINK AND SHOWER 1B 356 SINK 1B 356A SINK AND SHOWER 1B 357 SINK 1B 358 SINK 1B 358A SINK AND SHOWER 1B 359 SINK 1B 359A SINK AND SHOWER 1B 362 SINK 1B 362A SINK AND SHOWER 1B 363 SINK 1B 364 SINK 1B 364A SINK AND SHOWER 1B 365 SINK 1B 366 SINK 1B 366A SINK AND SHOWER 1B 367 SINK 1B 368 SINK 1B 368A SINK AND SHOWER 1B 372 SINK 1B 372A SINK AND SHOWER 1B 372B SINK 1B 373 SINK 1B 373A SINK AND SHOWER 1B 378 SINK 3G G04F SINK 3G G04G SINK 3G GO4H SINK 3G G04J SINK 3G G04K SINK 3G G04L SINK 3G G04M SINK 3G G04Q SINK 3G G04P SINK 3G G05 SINK 3G G06 SINK 3G G14 SINK 3G G16 SINK 3G G18A SINK 3G G18E SINK 3G G18F SINK 3G G18G SINK 3G G18H SINK 3G G18I SINK 3G G18J SINK 3G G18K SINK 3G G18N SINK 3G G18P SINK 3G G21C SINK 3G G21D SINK 3G G21E SINK 3G G21F SINK 3G G21H SINK 3G G21J SINK 3G G21K SINK 3G G21O SINK Bldg # Room # Description Temp Reading Inspection Date Inspection Date Temp Reading Pass/Fail Corrective Action 3A 101 SINK 3A 102 SINK 3A 105 SINK 3A 106 SINK 3A 108 SINK 3A 111 SINK 3A 112 SINK 3A 114 SINK 3A 115 SINK 3A 116A SINK X 2 3A 124 SINK 3A 125B SINK 3A 126A SINK 3A 126B SINK 3A 127B SINK 3A 127C SINK 3A 127D SINK 3A 127E SINK 3A 130 SINK 3A 135 SINK 3A 149 SINK 3A 150 SINK 3B 214 SINK 3B 215 SINK 3B 220 SINK 3B 233 SINK 3B 245A SINK 3B 245B SINK 3B 247 SINK 3B 248 SINK 3B 248A SINK   Bldg # Room # Description Temp Reading Inspection Date Inspection Date Temp Reading Pass/Fail Corrective Action 3B 250 SINK 3B 252 SINK 3B 252A SINK 3B 253 SINK 3B 255 SINK     4 G108A SINK 4 G108B SINK 4 G111 SINK 4 G114 SINK       5G G01B SINK 5G G11A SINK 5G G11B SINK 5G G15 SINK 5G G15C SINK 5G G15D SINK/TUB 5G G20A SINK X 2/SHOWER 5G G20C SINK X 2/SHOWER       6G G11 SINK 6G G12 SINK 6G G15 SINK 6G G21 SINK 6G G21A SINK 6G G21E SINK 6G G21F SINK 6G G21H SINK Bldg # Room # Description Temp Reading Inspection Date Inspection Date Temp Reading Pass/Fail Corrective Action 7G G14 SINK X 2 7G G23 SINK 7G G33 SINK 7G G33B SINK       7A 105 SINK AND SHOWER 7A 106 SINK AND SHOWER 7A 107 SINK AND SHOWER 7A 108 SINK AND SHOWER 7A 109 SINK AND SHOWER 7A 110 SINK 7A 119 SINK 7A 128 SINK AND SHOWER 7A 130 SINK AND SHOWER 7A 131 SINK AND SHOWER 7A 133 SINK AND SHOWER 7A 135 SINK AND SHOWER 7A 138 SINK AND SHOWER 7A 139 SINK AND SHOWER 7A 140 SINK AND SHOWER 7A 141 SINK AND SHOWER 7A 144 SINK AND SHOWER 7A 146 SINK AND SHOWER       7B 206A SINK AND SHOWER 7B 207A SINK AND SHOWER 7B 208A SINK AND SHOWER 7B 209A SINK AND SHOWER 7B 210A SINK AND SHOWER 7B 211A SINK AND SHOWER 7B 222 SINK Bldg # Room # Description 7B 231A SINK AND SHOWER 7B 233A SINK AND SHOWER 7B 235A SINK AND SHOWER 7B 236A SINK AND SHOWER 7B 238A SINK AND SHOWER 7B 241A SINK AND SHOWER 7B 242A SINK AND SHOWER 7B 243A SINK AND SHOWER 7B 244A SINK AND SHOWER 7B 247 SINK 7B 249A SINK AND SHOWER Bldg # Room # Description Temp Reading Inspection Date Inspection Date Temp Reading Pass/Fail Corrective Action 8G G12 SINK 8G G18 SINK 8G G23 SINK 8G G26J SINK       8A     8A 105A SINK AND SHOWER 8A 106A SINK AND SHOWER 8A 107A SINK AND SHOWER 8A 108A SINK AND SHOWER 8A 109A SINK AND SHOWER 8A 110A SINK AND SHOWER 8A 111A SINK AND SHOWER 8A 119 SINK 8A 126 SINK AND SHOWER 8A 127 SINK AND SHOWER 8A 128A SINK AND SHOWER 8A 129A SINK AND SHOWER 8A 132A SINK AND SHOWER 8A 133A SINK AND SHOWER 8A 134A SINK AND SHOWER 8A 136A SINK AND SHOWER 8A 137A SINK AND SHOWER 8A 138A SINK AND SHOWER 8A 139A SINK AND SHOWER 8A 140A SINK AND SHOWER 8A 141A SINK AND SHOWER 8A 144B SINK AND SHOWER 8A 149 SINK 150 SINK Bldg # Room # Description Temp Reading Inspection Date Inspection Date Temp Reading Pass/Fail Corrective Action 8B 207A SINK AND SHOWER 8B 208A SINK AND SHOWER 8B 209A SINK AND SHOWER 8B 210A SINK AND SHOWER 8B 211A SINK AND SHOWER 8B 212A SINK AND SHOWER 8B 222A SINK AND SHOWER 8B 230 SINK 8B 231 SINK AND SHOWER 8B 232A SINK AND SHOWER 8B 233A SINK AND SHOWER 8B 235A SINK AND SHOWER 8B 236A SINK AND SHOWER 8B 237A SINK AND SHOWER 8B 239A SINK AND SHOWER 8B 240A SINK AND SHOWER 8B 241A SINK AND SHOWER 8B 242A SINK AND SHOWER 8B 234A SINK AND SHOWER 8B 244A SINK AND SHOWER 8B 247B SINK AND SHOWER Bldg # Room # Description Temp Reading Inspection Date Inspection Date Temp Reading Pass/Fail Corrective Action 9G G02 SINK 9G G04 SINK 9G G05 SINK 9G G07D SINK 9G G07I SINK X 2 9G G11A SINK 9G G11D SINK 9G G13 SINK       9A 104 SINK 9A 105 SINK 9A 116 SINK X 4 9A 126 SINK 9A 148 SINK X 4 9A 151 SINK       9B 202 SINK 9B 208 SINK 9B 209 SINK 9B 210 SINK 9B 211 SINK 9B 212 SINK 9B 213 SINK 9B 215 SINK 9B 216 SINK 9B 217 SINK 9B 218 SINK 9B 220 SINK 9B 221 SINK 9B 222 SINK Bldg # Room # Description Temp Reading Inspection Date Inspection Date Temp Reading Pass/Fail Corrective Action 9B 228 SINK 9B 229 SINK 9B 230 SINK 9B 231 SINK 9B 241 SINK 9B 242 SINK 9B 243 SINK 9B 244 SINK 9B 245 SINK 9B 246 SINK 9B 252 SINK 9B 254 SINK 9B 255 SINK 9B 256 SINK 9B 257 SINK 9B 260 SINK 9B 261 SINK 9B 262 SINK 9B 265 SINK 9B 266 SINK 9B 267 SINK 9B 270 SINK 9B 271 SINK 9B 272 SINK 9B 273 SINK 9B 274 SINK 9B 275 SINK 9B 279 SINK 9B 280 SINK 9B 281 SINK Bldg # Room # Description Temp Reading Inspection Date Inspection Date Temp Reading Pass/Fail Corrective Action 10A 104 SINK 10A 107 SINK 10A 108 SINK 10A 109 SINK 10A 111 SINK 10A 112 SINK 10A 116 SINK       10B 209 SINK 10B 205 SINK 10B 206 SINK AND SHOWER 10B 207 SINK/SHOWER/TUB 10B 210 SINK 10B 212A SINK       11G G07 SINK       11A 104 SINK X 3/SHOWER 11A 114A SINK 11A 114B SINK       11B 209 SINK X 2/SHOWER X 2 11B 215 SINK X 2/SHOWER   Bldg # Room # Description 17 103 SINK 17 104 SINK 17 105 SINK 17 106 SINK 17 108 SINK AND SHOWER 17 111 SINK AND SHOWER 17 112 SINK AND SHOWER 17 114 SINK AND SHOWER 17 119 SINK AND SHOWER 17 121 SINK AND SHOWER 17 122 SINK AND SHOWER 17 125 SINK AND SHOWER 17 131 SINK X 2 17 137 SINK AND SHOWER 17 140 SINK AND SHOWER 17 141 SINK AND SHOWER 17 143 SINK AND SHOWER 17 148 SINK AND SHOWER 17 150 SINK AND SHOWER 17 151 SINK AND SHOWER 17 154 SINK AND SHOWER 17 156 SINK Bldg # Room # Description Temp Reading Inspection Date Inspection Date Temp Reading Pass/Fail Corrective Action 106 101 SINK 106 102 SINK 106 112 SINK 106 123 SINK 106 124 SINK 106 129 SINK 106 132 SINK 106 133 SINK 106 134 SINK 106 143 SINK Bldg # Room # Description Temp Reading Inspection Date Inspection Date Temp Reading Pass/Fail Corrective Action 107 G04 SINK 107 G06H SINK X 2 107 G07 SINK X 2 107 G10 SINK X 2 107 G12A SINK 107 G12B SINK 107 G14 SINK X 2/SHOWER 107 G15B SINK 107 G18 SINK X 2/SHOWER       116 A108 SINK 116 A109 SINK 116 A110 SINK 116 A111 SINK 116 A120 SINK 116 A121 SINK X 2 116 B104 SINK 116 B105 SINK 116 B107 SINK 116 B110 SINK 116 B111 SINK 116 B113 SINK 116 B114 SINK 116 B116 SINK 116 B117 SINK 116 B118 SINK 116 B121 SINK 116 B123 SINK 116 B125 SINK 116 B126 SINK Bldg # Room # Description Temp Reading Inspection Date Inspection Date Temp Reading Pass/Fail Corrective Action 116 B127 SINK 116 B127A SINK 116 B128 SINK 116 B129 SINK 116 B129A SINK 116 B130 SINK 116 B131 SINK 116 B131A SINK 116 B132 SINK 116 B133 SINK 116 B133A SINK 116 B134 SINK 116 B137 SINK 116 B137A SINK 116 B138 SINK 116 B139 SINK 116 B139A SINK 116 B140 SINK 116 B141 SINK 116 B141A SINK 116 B142 SINK 116 B143 SINK 116 B143A SINK 116 B144 SINK 116 B145 SINK 116 B145A SINK 116 B146 SINK 116 B147 SINK 116 B147A SINK 116 B148 SINK 116 B150 SINK Bldg # Room # Description Temp Reading Inspection Date Inspection Date Temp Reading Pass/Fail Corrective Action 116 B154 SINK X 2 116 B156 SINK 116 B135 SINK/SHOWER X 5 116 C102 SINK 116 C104 SINK 116 C104A SINK 116 C105 SINK 116 C106 SINK 116 C106A SINK 116 C107 SINK 116 C108 SINK 116 C108A SINK 116 C109 SINK 116 C110 SINK 116 C110A SINK 116 C111 SINK 116 C112 SINK 116 C112A SINK 116 C113 SINK 116 C114 SINK 116 C114A SINK 116 C117 SINK/ SHOWER X 5 116 C118 SINK 116 C118A SINK 116 C119 SINK 116 C120 SINK 116 C120A SINK 116 C121 SINK 116 C122 SINK 116 C122A SINK 116 C123 SINK Bldg # Room # Description Temp Reading Inspection Date Inspection Date Temp Reading Pass/Fail Corrective Action 116 C124 SINK 116 C124A SINK 116 C125 SINK 116 C126 SINK 116 C126A SINK 116 C127 SINK 116 C129 SINK 116 C129A SINK 116 C130 SINK 116 C131 SINK 116 C133 SINK 116 C134 SINK 116 C134A SINK 116 C135 SINK 116 C136 SINK 116 C136A SINK 116 C137 SINK 116 C138 SINK 116 C138A SINK 116 C139 SINK 116 C141 SINK 116 C141A SINK 116 C142 SINK 116 C144 SINK 116 C144A SINK 116 C145 SINK 116 C146 SINK AND TUB 116 C147 SINK 116 C147A SINK 116 C150 SINK 116 C151 SINK Bldg # Room # Description Temp Reading Inspection Date Inspection Date Temp Reading Pass/Fail Corrective Action 117 G04 SINK 117 G06 SINK 117 G07 SINK 117 G07A SINK 117 G08 SINK 117 G09 SINK 117 G11 SINK 117 G12 SINK 117 G13 SINK 117 G14 SINK 117 G15 SINK 117 G16 SINK 117 G20 SINK 117 G21 SINK 117 G22 SINK 117 G23 SINK 117 G25 SINK 117 G26 SINK 117 G27 SINK 117 G28 SINK 117 G29 SINK 117 G31 SINK 117 G32 SINK 117 G33 SINK 117 G34 SINK 117 G35 SINK 117 G36 SINK 117 G37B SINK 117 G37C SINK 117 G37D SINK Bldg # Room # Description Temp Reading Inspection Date Inspection Date Temp Reading Pass/Fail Corrective Action 117 G37E SINK 117 G37F SINK 117 G37G SINK 117 G37H SINK 117 G37I SINK 117 G37K SINK 117 G37L SINK 117 G37M SINK 117 G37N SINK 117 G37Q SINK 117 G37R SINK 117 G37S SINK 117 G42 2 SINKS 117 G44 2 SINKS 117 G45C SINK 117 G45E SINK 117 G45J SINK 117 G45K SINK 117 G45L SINK 117 G45M SINK 117 G45N SINK 117 G45P SINK 117 G45Q SINK 117 G45T SINK 117 G45U SINK 117 G45V SINK 117 G45W SINK 117 G45X SINK 117 G45Y SINK 117 G49 SINK Bldg # Room # Description Temp Reading Inspection Date Inspection Date Temp Reading Pass/Fail Corrective Action 117 G54 SINK 117 G56 SINK 117 G57 SINK 117 G59 SINK 117 G60 SINK 117 102 SINK 117 105 2 SINKS 117 105D SINK 117 106 SINK 117 108 SINK 117 112 2 SINKS 117 112N SINK 117 113 SINK 117 114 SINK 117 114A SINK Price/Cost Schedule Base Period: March 1, 2017 through September 30, 2017 CLIN DESCRIPTION OF SUPLIES/SERVICES QTY U/I EXT. PRICE TOTAL 1001 Semi-Annual Testing 1 JB $___________ $_________ BASE OPTION -PERIOD OF PERFORMANCE - TOTAL $_________ Option Year 1: October 1, 2017 through September 30, 2018 CLIN DESCRIPTION OF SUPLIES/SERVICES QTY U/I EXT. PRICE TOTAL 2001 Semi-Annual Testing 1 JB $___________ $_______ 2002 Semi-Annual Testing 1 JB $___________ $________ OPTION 1-- PERIOD OF PERFORMANCE - TOTAL $_________ Option Year 2: October 1, 2018 through September 30, 2019 CLIN DESCRIPTION OF SUPLIES/SERVICES QTY U/I EXT. PRICE TOTAL 3001 Semi-Annual Testing 1 JB $__________ $_______ 3002 Semi-Annual Testing 1 JB $_________ $_______ OPTION 2-- PERIOD OF PERFORMANCE - TOTAL $_______ Option Year 3: October 1, 2019 through September 30, 2020 CLIN DESCRIPTION OF SUPLIES/SERVICES QTY U/I EXT. PRICE TOTAL 4001 Semi-Annual Testing 1 JB $__________ $_______ 4002 Semi-Annual Testing 1 JB $__________ $________ Option 3-- PERIOD OF PERFORMANCE - TOTAL $________ Option Year 4: October 1, 2020 through September 30, 2021 CLIN DESCRIPTION OF SUPLIES/SERVICES QTY U/I EXT. PRICE TOTAL 5001 Semi-Annual Testing 1 JB $__________ $_________ 5002 Semi-Annual Testing 1 JB $_________ $_________ Option 4-- PERIOD OF PERFORMANCE TOTAL $________ SUMMARY OF ANNUAL EXPENDITURES FOR THIS BPA: BASE PERIOD OF PERFORMANCE - TOTAL: $ OPTION 1 - PERIOD OF PERFORMANCE - TOTAL: $ OPTION 2 - PERIOD OF PERFORMANCE - TOTAL: $ OPTION 3 - PERIOD OF PERFORMANCE - TOTAL: $ OPTION 4 - PERIOD OF PERFORMANCE - TOTAL: $ TOTAL: $ Inspection and acceptance shall be accomplished as follows: The Government, for all supplies/services furnished under any resulting order, hereby designates the COR in the program office as the point of final inspection and acceptance. END OF SECTION
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/VA/NaVAMC/VAMCCO80220/VA24917Q0344/listing.html)
 
Document(s)
Attachment
 
File Name: VA249-17-Q-0344 VA249-17-Q-0344.docx (https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=3277258&FileName=VA249-17-Q-0344-000.docx)
Link: https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=3277258&FileName=VA249-17-Q-0344-000.docx

 
Note: If links are broken, refer to Point of Contact above or contact the FBO Help Desk at 877-472-3779.
 
Place of Performance
Address: Alvin C. York Campus;3400 Lebannon Pike;Murfreesborok TN
Zip Code: 37129-1237
 
Record
SN04401892-W 20170216/170214234544-a91e8fd0419fd1bfbe74bc0f909e6261 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.