Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF FEBRUARY 18, 2017 FBO #5566
DOCUMENT

Z -- ZOB Electrical Manhole Sump Pump and Monitoring System Replacement Project - Attachment

Notice Date
2/16/2017
 
Notice Type
Attachment
 
NAICS
238220 — Plumbing, Heating, and Air-Conditioning Contractors
 
Contracting Office
FEDERAL AVIATION ADMINISTRATION, aaq-520 CN - Central Logistics Service Area (Central)
 
Solicitation Number
DTFASA-17-R-00288
 
Response Due
3/6/2017
 
Archive Date
3/6/2017
 
Point of Contact
Patricia Mogck, patricia.mogck@faa.gov, Phone: 817-222-5962
 
E-Mail Address
Click here to email Patricia Mogck
(patricia.mogck@faa.gov)
 
Small Business Set-Aside
Total Small Business
 
Description
ARTCC ZOB Replacement Power Panels The Federal Aviation Administration (FAA) is seeking competent and qualified contractors interested in providing offers for Air Route Traffic Control Center (ARTCC) Electrical Manhole (EMH) Sump Pumps and Monitoring System Replacement Project. This is not a Screening Information Request (SIR) or Request for Proposal (RFP). See Section III for documentation required to be submitted and evaluated to determine which vendors receive the solicitation. SECTION I REQUIREMENT SCOPE Project general scope for the replacement of the Electrical Manhole (EMH) Sumps Pumps and Monitoring System at the Cleveland Air Route Traffic Control Center (ARTCC) in Oberlin, Ohio, as follows: 1)Removing existing equipment includes, but is not limited to: pumps, control panel, partial piping, high water level sensor, and oil switch etc. in each electrical manhole, namely: EMH-B, EMH-C, EMH-D, EMH-E, EMH-G, EMH-H, EMH-J, EMH-K & EMH-Kl. Clean and prepare sump pit for new installation of dewatering pumping systems. 2)Provide two new dewatering pumps, duplex control panel for each electrical manhole: EMH-B, EMH-C, EMH-D, EMH-E, EMH-G, EMH-H, EMH-J, EMH-K & EMH-KI 3)New controllers/panels will be located in the Admin chiller room, Auto Wing basement, PSB and the Hazmat building. 4)Provide new high water level and oil alarms. All alarms shall be connected to the existing DDC system. 5)Other new work as shown on drawing ZOB-D-ARTCC-M032 (to be provided with solicitation). The contractor must furnish all equipment, labor, material and tools required for this project All work shall be in accordance with the plans and specifications to be provided upon release of solicitation. The total estimated price of the proposed construction project is between $100,000 and $200,000. PAYMENT AND PERFORMANCE BONDS WILL BE REQUIRED AS PART OF THE SOLICITATION. SECTION II- CONTRACT TYPE AND EVALUATION CRITERIA Award will be made to the responsive and responsible offeror whose offer results in the lowest total price for the project. The North American Industry Classification System (NAICS) is 238220, Plumbing, Heating and Air Conditioning Contractors. The small business size standard is $15 Million, and will be a competed action, 100% small business set-aside. SECTION III- GO/NO GO CRITERIA The initial information submitted will be evaluated on a Go/No-Go basis. Offerors must receive a œGo on all of the following criteria to be considered a viable offeror and receive the solicitation. The Government reserves the right to perform clarifications/discussions with any offerors. To receive a œGo rating the offeror must have 5 years of experience performing mechanical work, be able to provide the necessary bonding for a project of this size (construction estimate of $100,000 to $200,000), and complete the following documents: 1.Past Experience Information* 2.Sensitive Security Information Form 3.Business Declaration *To receive a œGo rating for past experience, the offeror must provide three (3) mechanical projects,that are similar to the current EMH Sump Pump project, with project values over $100,000.00 per project, completed in the past three years, at FAA facilities or similar facilities. The information provided will also be used as part of the responsibility determination. Responses must be emailed to patricia.mogck@faa.gov, no later than 17:00 (Central Standard Time) on 03/06/2017. Please place "Attention: ZOB Electrical Sump Pump Replacement Project in the subject line of your email. Requests received after this date and time will not be honored. Failure to submit all required information will deem the request for solicitation as non-responsive. NOTE: Contractors must have active registration in System for Award Management (SAM), formerly the Central Contractor Registration (CCR,) before award can be made. Contractors can register at www.sam.gov. 02/16/2017 If you're viewing this announcement from a source other than Federal Aviation Administration Contract Opportunities (FAACO), visit https://faaco.faa.gov/index.cfm/announcement/view/26635 to view the original announcement.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FAA/CRMO/DTFASA-17-R-00288/listing.html)
 
Document(s)
Attachment
 
File Name: Attachment #2 Senitive Security Information form (pdf) (https://faaco.faa.gov/index.cfm/attachment/download/75581)
Link: https://faaco.faa.gov/index.cfm/attachment/download/75581

 
File Name: Attachment #3 Business Declaration (pdf) (https://faaco.faa.gov/index.cfm/attachment/download/75582)
Link: https://faaco.faa.gov/index.cfm/attachment/download/75582

 
File Name: Attachment #1 Past Experience History (pdf) (https://faaco.faa.gov/index.cfm/attachment/download/75580)
Link: https://faaco.faa.gov/index.cfm/attachment/download/75580

 
Note: If links are broken, refer to Point of Contact above or contact the FBO Help Desk at 877-472-3779.
 
Record
SN04405362-W 20170218/170216234722-7e2118eebf8681f2f86cdb5750c62644 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  © 1994-2020, Loren Data Corp.