X -- UP TO 10.20 ACRES OF LAND FOR LEASE FOR ENERGY GENERATION, AND/OR STORAGE, RESILIENCY, RELIABILITY, AND SECURITY AT NBSD and NBC
- Notice Date
- 2/28/2017
- Notice Type
- Modification/Amendment
- NAICS
- 531390
— Other Activities Related to Real Estate
- Contracting Office
- N00025 NAVFAC HQ Code 022G 1322 Patterson Avenue SE Suite 1000 Washington, DC
- ZIP Code
- 00000
- Solicitation Number
- N000252017048
- Response Due
- 3/14/2017
- Archive Date
- 5/15/2017
- Point of Contact
- Debbie Kemp 202-685-0718
- Small Business Set-Aside
- N/A
- Description
- AMENDMENT #1 RFP NO. No. LO-2017048 Naval Base San Diego and Naval Base Coronado California 1.3 SITE LOCATION This section, in its entirety, has been updated to reflect the following changes, highlighted in yellow: The proposed sites ( Site ) consist of 5 non-contiguous parcels consisting of improved land, totaling approximately 10.20 acres of land (see Section 6). The parcels on NBSD/NBC are within the installation s perimeter boundary. Naval Base San Diego has identified two non-contiguous, improved individual parcels totaling approximately 5.08 acres for potential energy generation and/or storage system. Alt 1 Existing plant (2.11 acres) Alt 2 Proposed alternate plant location (2.97 acres) Within the boundary of NBSD Alt 1 is a 40-megawatt (MW) cogeneration plant that is owned and operated by Applied Energy, LLC (AE LLC). The contract for the cogeneration plant and associated centralized steam service expires in February 2018. External to this RFP, the DON is decentralizing the steam system at NBSD. At NBSD, Offerors must provide project designs for Alt 2. Offerors may, but are not required to, provide project designs for Alt 1. An offer/project design for only Alt 1 will not be considered. Naval Base Coronado has identified three non-contiguous, improved individual parcels totaling approximately 5.12 acres for potential energy generation and/or storage system. Alt 1 Existing plant (2.62 acres) Alt 2 Site Expansion Location (1.1 acres) Alt 3 Alternate plant location (1.5 acres) Within the boundary of NBC Alt 1 is a 30-megawatt (MW) cogeneration plant that is owned and operated by Applied Energy, LLC (AE LLC). The contract for the cogeneration plant and associated centralized steam service expires in February 2018. External to this RFP, the DON is decentralizing the steam system at NBC. At NBC, Offerors may provide project designs for one or any combination of parcels. The Sites comprise all of the DON property available for this use, to include any necessary shading, buffers, stand-offs, fencing, or lay-down areas. END OF AMENDMENT
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/DON/NAVFAC/NAVFACHQ/N000252017048/listing.html)
- Record
- SN04416978-W 20170302/170228234632-7711a8894fd5e2307571d1ded32e7b68 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |