Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF MARCH 10, 2017 FBO #5586
SOLICITATION NOTICE

54 -- One (1) Modular Clean Room with Installation (Site Visit) - Provisions and Clauses Full-Text Attachment - Sailent Characteristics Characteristics - Combo Solicitation Document - Evaluation Criteria

Notice Date
3/8/2017
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
332311 — Prefabricated Metal Building and Component Manufacturing
 
Contracting Office
Department of the Army, Army Contracting Command, ACC - APG (W911QX) Adelphi, 2800 POWDER MILL RD, ADELPHI, Maryland, 20783-1197, United States
 
ZIP Code
20783-1197
 
Solicitation Number
W911QX-17-T-0089
 
Archive Date
4/15/2017
 
Point of Contact
Jamie N White, Phone: 3013941615
 
E-Mail Address
jamie.n.white2.civ@mail.mil
(jamie.n.white2.civ@mail.mil)
 
Small Business Set-Aside
Total Small Business
 
Description
Evaluation Criteria COMBO SYNOPSIS SOLICITATION FOR COMMERCIAL ITEMS Salient Characteristics Provisions and Clauses Full-Text Attachment Please read entire description as special instruction for site visit 14 Mar 2017. The Contractor shall provide one (1) modular clean-room to the Weapons and Materials Research Directorate (WMRD) at the Army Research Laboratory (ARL) in Aberdeen Proving Ground (APG), MD 21005. The Contractor shall ensure the clean-room meets the following minimum requirements: 1.The Contractor shall ensure the clean-room is no less than 900 square foot (sq. ft.) with unofficial measurements ate 20' Length x 12' Width x 10' Height. 2.The Contractor shall ensure the clean-room is modular hard wall with sufficient plenum space to incorporate the lights, filters, and blank ceiling panels above the clean-room. 3.The Contractor shall ensure the clean-room meets ANSI/IEST/ISO 14644-1:2015 Cleanroom Standards for ISO 7. 4.The Contractor shall ensure the clean-room has four (4) 3'W x 7'H steel doors. Two (2) doors shall include half 1/4" TSG Windows and two (2) doors shall have no window. The doors shall be installed as double doors; with clearance of each door totaling 6'W x 7'H located in front and back of the clean room). The lockset shall be Americans with Disabilities Act (ADA) Lever Type for the double doors. The Contractor shall receive TPOC approval for door locations before fabrication begins. 5.The Contractor shall ensure the clean-room has Three (3) Fixed Window with the minimum dimensions of ¼"TSG 3'W x 4'H. The Contractor shall receive TPOC approval for window locations before fabrication begins. 6.The Contractor shall ensure the clean-room ceiling system is a nominal 2' x 4' grid system designed to support the lights, filters, and blank ceiling panels provided by the Contractor. The Contractor shall ensure the ceiling grids are gasketed in order to properly seal the room to maintain the clean-room classification above. The ceiling/dustcover shall include plywood 3/4" Fire Resistant Roof Deck (approximately 125lb/ft2). The ceiling/dustcover shall include 22-gauge corrugated steel type B deck. 7.The Contractor shall ensure the clean-room floor is clean and shall ensure the existing epoxy surfaced flooring is re-coated. 8.The Contractor shall ensure the clean-room is outfitted with a Heating, Ventilation, and Air Conditioning (HVAC) control system in accordance with International Organization for Standardization (ISO) standard 14644-1:2015 per Federal Standard 209E. 9.The Contractor shall ensure the clean-room has a positive pressure system with ventilation controls that can maintain 70 degrees (°) Fahrenheit (F) ± 2°F and humidity settings of 50 percent (%) +5% relative humidity (RH). 10.The Contractor shall ensure the clean-room contains gauges to monitor and control the temperature and humidity. 11.The Contractor shall ensure the clean-room contains appropriate lighting as prescribed by local codes for the square foot area that it contains. The Contractor shall ensure that the clean-room contains battery operated emergency lighting near all exit doors with an exit sign by each set of doors. The Contractor shall ensure the clean-room is wired with receptacles in accordance with local codes for the square foot area. 12.The Contractor shall ensure the clean-room contains six (6) vacuum quick disconnects tied into the existing house vacuum system. The Contractor shall request TPOC approval for access to the disconnect locations before commencing fabrication. The Contractor shall ensure the clean-room contains a dust collection vacuum system installed with a minimum of two (2) hose hook-ups. The Contractor shall request TPOC approval for access to the hose hook-ups before fabrication begins. 13.The Contractor shall ensure the clean-room contains fire protection sprinkler heads incorporated into the existing system and located in accordance with local codes. The Contractor shall coordinate installation with the Government building custodian to ensure the sprinkler system meets all local codes. 14.The Contractor shall be responsible for the shipping and installation of all components of the clean-room. 15.The Contractor shall be responsible for supplying all of the required labor for the fabrication and installation of the clean-room. 16.The Contractor shall be responsible all travel costs for any personnel used in the installation or fabrication of the clean-room. 17.The Contractor shall supply the TPOC with a floor plan of the clean-room detailing utilities to include duct work, lights, vacuum disconnects, doors, windows and equipment locations which must be agreed upon with the TPOC before fabrication begins. The floor plans shall be updated accordingly at completion of installation to ensure accuracy of plans. The TPOC will provide a copy of the plans to the appropriate Government office. 18.The Contractor shall provide a warranty that covers all applicable hardware and equipment for a minimum of a one (1) year. 19.The contractor shall ensure APG building requirements for installation and connection to the B4600: Electrical system, Fire Alarm system, Sprinkler system. Clean room installation shall by in accordance with all applicable commercial standards, and local and federal government laws, regulations and statues. 20.Past Experience: Show previous effort installing and completing a similar units in either private or government buildings. Installation and completion means within the: schedule, price, and the ability to meet the technical quality requirements. Examples if experience are: US Army TARDEC, National Institute of Health, private laboratories, etc.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/notices/e53214a8494691c2171b669a3e0d4ae4)
 
Place of Performance
Address: Bldg 4600 Maryland Blvd, Aberdeen Proving Ground, Maryland, 21005, United States
Zip Code: 21005
 
Record
SN04428088-W 20170310/170308234717-e53214a8494691c2171b669a3e0d4ae4 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.