Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF MARCH 16, 2017 FBO #5592
SOLICITATION NOTICE

Y -- CA FTNP SEKI 10(10) Generals Highway

Notice Date
3/14/2017
 
Notice Type
Presolicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, 12300 West Dakota Avenue, Lakewood, Colorado, 80228
 
ZIP Code
80228
 
Solicitation Number
DTFH6817B00007
 
Point of Contact
Jeremiah Rogers, , Joe Wilson,
 
E-Mail Address
CFLContracts@dot.gov, CFLContracts@dot.gov
(CFLContracts@dot.gov, CFLContracts@dot.gov)
 
Small Business Set-Aside
N/A
 
Description
THIS IS NOT AN INVITATION FOR BID, PLANS AND SPECIFICATIONS ARE CURRENTLY NOT AVAILABLE. THE TENTATIVE ADVERTISEMENT DATE IS MARCH 29th, AND WILL BE ADVERTISED ON A FULL AND OPEN BASIS CA FTNP SEKI 10(10) Generals Highway Project Description: This project consists of roadway resurfacing, restoration, rehabilitation, and reconstruction of approximately 2.4 miles of roadway within Sequoia and Kings Canyon National Park, Tulare County, California. 0.96 miles of Generals Highway will be reconstructed from Deer Ridge to Eleven Range and 1.4 miles of Wolverton Road including the parking lot will be rehabilitated under this project. The terrain is mountainous with the elevation for the Generals Highway work ranging between 4,500 and 5,500 feet and Wolverton Road work ranging between 6,900 and 7,300 feet. The estimated price range is between $8,000,000 and $12,000,000. The anticipated advertisement date is February 2017 with construction anticipated from May 2017 to October 2018. Principle work items include (estimated): 9,800 square feet of reinforced concrete retaining wall (4 feet to 14 feet high), 9,100 tons of asphalt concrete pavement, 1,700 linear feet of steel bridge rail, 200 cubic yards of structural concrete, 4,600 tons of aggregate base, 3,900 cubic yards of roadway excavation and 4,900 cubic yards of waste, 6,100 linear feet of concrete curb, and 600 linear feet of micropiles All of the work is occurring in natural resource sensitive areas. Construction phasing, temporary traffic control, and timely completion of construction will be crucial to minimize disruptions to park visitors throughout construction.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FHWA/68/DTFH6817B00007/listing.html)
 
Place of Performance
Address: Sequoia / Kings Canyon National Park, Tulare County, California, 93262, United States
Zip Code: 93262
 
Record
SN04434013-W 20170316/170314234119-ef5075df5f9d9ebb37452ee1c688a5be (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.