- Department of Agriculture, Forest Service, R-1 East Side Acquisition Team: Beaverhead-Deerlodge; Custer Gallatin; Helena; Lewis & Clark NFs; Dakota Prairie NG, Montana, United States
- ZIP Code
- 00000
- Solicitation Number
- AG-0398-S-17-0007
- Archive Date
- 12/31/2017
- Point of Contact
- Gary B. Stephens, Phone: (406) 624-3440, Dana M. Bangart, Phone: (406) 624-3442
- E-Mail Address
-
gbstephens@fs.fed.us, dbangart@fs.fed.us
(gbstephens@fs.fed.us, dbangart@fs.fed.us)
- Small Business Set-Aside
- Service-Disabled Veteran-Owned Small Business
- Description
- Scope of Work: Work will consist of bituminous surface treatment and aggregate placement (chip sealing) on all existing paved roads, campgrounds, turnouts, parking areas, and trailheads/parking areas. Road centerline and edge striping, along with parking bay striping, are also included. Four sections of pavement repair are incorporated in Additive #1 and one section in Additive #2. These involve removing the existing asphalt, excavating and removing unsuitable material to the required depths and then reconstructing the foundation and pavement structures at those sites. The contractor will furnish all labor, equipment, transportation, supervision, operating supplies, materials and incidentals necessary to complete the project as awarded. All work and equipment shall be in compliance with the terms, specifications, and provisions of this contract. All equipment shall be in good mechanical operating condition, fully capable of performing all phases of work as required, and shall be operated by competent, qualified operators experienced in the work. Project Location: The project is located 7.5 miles south of Bozeman, MT. in the Hyalite Creek drainage on the Bozeman Ranger District of the Gallatin National Forest, Hyalite Creek Road #62. Project start is at Milepost 0.54 (first cattleguard) on Hyalite Road, end is Milepost 10.27 (end of pavement). All additives are located along and adjacent to the same Hyalite Road. Start of Work/Period of Performance: It is estimated that the work will begin on June 1, 2017, with an option to start May 1 for additive #1. Application of oil and chips shall be restricted to a period between July 10, 2017 and August 15, 2017. For the purposes of this contract, seasonal limitations will restrict work to no later than August 30, 2017. The contractor shall be required to: 1) Commence work under this contract within 10 calendar days after the Notice to Proceed is received, 2) Prosecute the work diligently, and 3) Complete the entire project, ready for use, no later than August 30, 2017. The time stated for completion shall include final cleanup of the premises. Submittals: Fourteen (14) days prior to start of work contractor shall furnish Manufacturers Certificates and Data certifying that the following materials conform to the requirements specified: CRS-2P, Traffic Paint, Aggregate (chips), Pavement Repair sections(hot mix asphalt design, permeable backfill, structural backfill, road mix, pipe, and geotextile). Pre-bid Tour: No formal site tour is planned; however bidders are strongly encouraged to visit the sites prior to preparing and submitting their bid. Directional information may be had by contacting Jeff Hiedeman, Gallatin National Forest Supervisors Office, Bozeman, Montana, telephone (406)587-6738. NOTICE: This project will be advertised under FAR Part 52.219-27 "Notice of Service-Disabled Veteran-Owned Small Business Set-Aside." (SDVOSB) It is anticipated the full solicitation and all attachments will be posted to the FBO.gov website on/around 3/28/17.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/398/AG-0398-S-17-0007/listing.html)
- Place of Performance
- Address: The project is located 7.5 miles south of Bozeman, MT. in the Hyalite Creek drainage on the Bozeman Ranger District of the Gallatin National Forest, Hyalite Creek Road #62. Project start is at Milepost 0.54 (first cattleguard) on Hyalite Road, end is Milepost 10.27 (end of pavement)., Bozeman, Montana, 59715, United States
- Zip Code: 59715
- Zip Code: 59715
- Record
- SN04434019-W 20170316/170314234121-1f9241b767c9e70ab31d822bbae3d358 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |