Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF MARCH 16, 2017 FBO #5592
SOLICITATION NOTICE

Z -- CUSTER GALLATIN NATIONAL FOREST - Hyalite Canyon Road #62 Chipseal

Notice Date
3/14/2017
 
Notice Type
Presolicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Agriculture, Forest Service, R-1 East Side Acquisition Team: Beaverhead-Deerlodge; Custer Gallatin; Helena; Lewis & Clark NFs; Dakota Prairie NG, Montana, United States
 
ZIP Code
00000
 
Solicitation Number
AG-0398-S-17-0007
 
Archive Date
12/31/2017
 
Point of Contact
Gary B. Stephens, Phone: (406) 624-3440, Dana M. Bangart, Phone: (406) 624-3442
 
E-Mail Address
gbstephens@fs.fed.us, dbangart@fs.fed.us
(gbstephens@fs.fed.us, dbangart@fs.fed.us)
 
Small Business Set-Aside
Service-Disabled Veteran-Owned Small Business
 
Description
Scope of Work: Work will consist of bituminous surface treatment and aggregate placement (chip sealing) on all existing paved roads, campgrounds, turnouts, parking areas, and trailheads/parking areas. Road centerline and edge striping, along with parking bay striping, are also included. Four sections of pavement repair are incorporated in Additive #1 and one section in Additive #2. These involve removing the existing asphalt, excavating and removing unsuitable material to the required depths and then reconstructing the foundation and pavement structures at those sites. The contractor will furnish all labor, equipment, transportation, supervision, operating supplies, materials and incidentals necessary to complete the project as awarded. All work and equipment shall be in compliance with the terms, specifications, and provisions of this contract. All equipment shall be in good mechanical operating condition, fully capable of performing all phases of work as required, and shall be operated by competent, qualified operators experienced in the work. Project Location: The project is located 7.5 miles south of Bozeman, MT. in the Hyalite Creek drainage on the Bozeman Ranger District of the Gallatin National Forest, Hyalite Creek Road #62. Project start is at Milepost 0.54 (first cattleguard) on Hyalite Road, end is Milepost 10.27 (end of pavement). All additives are located along and adjacent to the same Hyalite Road. Start of Work/Period of Performance: It is estimated that the work will begin on June 1, 2017, with an option to start May 1 for additive #1. Application of oil and chips shall be restricted to a period between July 10, 2017 and August 15, 2017. For the purposes of this contract, seasonal limitations will restrict work to no later than August 30, 2017. The contractor shall be required to: 1) Commence work under this contract within 10 calendar days after the Notice to Proceed is received, 2) Prosecute the work diligently, and 3) Complete the entire project, ready for use, no later than August 30, 2017. The time stated for completion shall include final cleanup of the premises. Submittals: Fourteen (14) days prior to start of work contractor shall furnish Manufacturers Certificates and Data certifying that the following materials conform to the requirements specified: CRS-2P, Traffic Paint, Aggregate (chips), Pavement Repair sections(hot mix asphalt design, permeable backfill, structural backfill, road mix, pipe, and geotextile). Pre-bid Tour: No formal site tour is planned; however bidders are strongly encouraged to visit the sites prior to preparing and submitting their bid. Directional information may be had by contacting Jeff Hiedeman, Gallatin National Forest Supervisors Office, Bozeman, Montana, telephone (406)587-6738. NOTICE: This project will be advertised under FAR Part 52.219-27 "Notice of Service-Disabled Veteran-Owned Small Business Set-Aside." (SDVOSB) It is anticipated the full solicitation and all attachments will be posted to the FBO.gov website on/around 3/28/17.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/398/AG-0398-S-17-0007/listing.html)
 
Place of Performance
Address: The project is located 7.5 miles south of Bozeman, MT. in the Hyalite Creek drainage on the Bozeman Ranger District of the Gallatin National Forest, Hyalite Creek Road #62. Project start is at Milepost 0.54 (first cattleguard) on Hyalite Road, end is Milepost 10.27 (end of pavement)., Bozeman, Montana, 59715, United States
Zip Code: 59715
 
Record
SN04434019-W 20170316/170314234121-1f9241b767c9e70ab31d822bbae3d358 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.