Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF MARCH 24, 2017 FBO #5600
SOLICITATION NOTICE

Z -- Resurface Walkways FODO Visitors Center

Notice Date
3/22/2017
 
Notice Type
Presolicitation
 
NAICS
238110 — Poured Concrete Foundation and Structure Contractors
 
Contracting Office
NPS, SER - West MABO Headquarters, Gulf Islands National Seashore 1801 Gulf Breeze Parkway ATTN: Contracting Officer Gulf Breeze FL 32563 US
 
ZIP Code
00000
 
Solicitation Number
P17PS00830
 
Response Due
4/20/2017
 
Archive Date
5/5/2017
 
Point of Contact
Ward, Evans
 
Small Business Set-Aside
Total Small Business
 
Description
PROJECT TITLE: Resurface Visitor Center Walkways SYNOPSIS OF PROPOSED CONTRACT ACTION: The National Park Service, Southeast Region, West MABO contracting office seeks quotations from small business concerns within the local trade area having the requisite capability of meeting the requirements of this polymer-modified overlay walkways project at Fort Donelson National Battlefield Visitor Center. The site of work is located at 120 Fort Donelson Park Rd, Dover, Tennessee 37058. MAGNITUDE OF PROJECT: This project has an estimated price range between $25,000 and $100,000 (first quartile Q1). The anticipated Period of Performance: 06/05/2017 to 08/18/2016 (75 calendars Days after the contractor receives the Notice To Proceed) from NPS on or about May 31th 2017. Work to resurface walkways would commence within 10 days of NTP. Anticipated start date could be delayed a few weeks, as the the VC rehab is currently in progress by others under separate contract, but expected to be completed late May. PRE-BID SITE VISIT: Prospective contractors may schedule a site visit during normal duty hours by contacting: Name: David Hamby Address: 174 National Cemetery Dr. Dover, TN 37058 Telephone: 931-232-0830 SCOPE: The primary objective of this project is to resurface 3500 square feet of exterior walkway at the adjoining visitor center parking lot. The walkways to be resurfaced are shown in Attachment D, Figure 1 (Page 22 of 24) of the Performance Work Statement (PWS). A polymer modified overlay used to resurface the walkways shall be custom fabricated to closely match the existing walkways (previously installed in 1962). The desired visual effect and texture of the walkways is depicted in Attachment D, Figure 2 (Page 23 of 24) of the Performance Work Statement (PWS). The NPS desires to retain the historic character of the original design while providing a safe walking surface for visitors and staff alike. Specifically, the contractor is expected to accomplish the following objectives: - Confirm the desired design and functional requirements of resurfaced walkways, based on this Scope of Work and discussion with the park superintendent and staff. Identify a suitable overlay product that balances the park's design, aesthetic, quality, performance, cost, and desires. - Measure the existing walkways and acquire appropriate quantities of high quality resurfacing overlay material from a reputable manufacturer that matches (as closely as possible) the current walkway surface. - Protect exterior landscaping from trampling and impact damage. - Remove loose walkway material and dispose of off-site. - Clean and prepare walkway surface for application of polymer modified overlay. - Prime walkway surface prior to overlay application. - Install resurfacing overlay material according to manufacturer's instructions for recommended preparation and application techniques and materials. - Use repair mortar for deep scaling and spalling of concrete on walkways. - Apply second coat of overlay if full coverage of walkway surface was not achieved on first application. - Apply exterior low solid sealer appropriate for the overlay application applied to walkway. - Prepare and submit all required quality assurance reporting documentation in a timely manner. - Demobilize from the worksite. Clean all walkways. Remove all construction associated debris and equipment from the worksite. - Close Project. Complete all administrative requirements necessary to close project within 2 weeks of final acceptance of site work. Refer to Solicitation Number P17PS00830 for complete details. All solicitation documents and associated attachments are posted electronically at WWW.FEDCONNECT.NET which may also be accessed via link published at the GPE http://www.fedbizopps.gov. SYSTEM FOR AWARD MANAGEMENT (SAM) REGISTRATION: Prospective contractors shall be registered in the SAM database prior to award of a contract. Prospective contractors may obtain information on registration, and shall complete electronic annual representations and certifications at SAM, accessed via https://www.acquisition.gov as a part of required registration. Any questions or concerns regarding this procurement may be directed to the Contracting Officer in writing via email: andre_ward@nps.gov
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOI/NPS/APC-IS/P17PS00830/listing.html)
 
Place of Performance
Address: NPS, SER, Fort Donelson NB 174 National Cemetery Drive PO Box 434 ATTN: Project Manager D. HAMBY DOVER TN 37058-0434 USA
Zip Code: 37058-0434
 
Record
SN04443511-W 20170324/170322234427-62968f61e835c308adb29994b65ece8e (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.