MODIFICATION
Z -- Dredging Dredging, Delaware River Main Channel Deepening, Upper Reach ‘B’, New Jersey & Delaware
- Notice Date
- 3/22/2017
- Notice Type
- Modification/Amendment
- NAICS
- 237990
— Other Heavy and Civil Engineering Construction
- Contracting Office
- Department of the Army, U.S. Army Corps of Engineers, USACE District, Philadelphia, 100 Penn Square East, Wanamaker Bldg (RM 643), Philadelphia, Pennsylvania, 19107-3390, United States
- ZIP Code
- 19107-3390
- Solicitation Number
- W912BU-17-R-DRMCD-UPPERRCH-E
- Archive Date
- 4/20/2017
- Point of Contact
- Robert R Hilton, Phone: 2156566911
- E-Mail Address
-
robert.r.hilton@usace.army.mil
(robert.r.hilton@usace.army.mil)
- Small Business Set-Aside
- N/A
- Description
- Solicitation# correction: W912BU-17-R-DRMCD-UPPERRCH-B This is a Sources Sought Notice and is for information purposes only. THIS IS NOT A REQUEST FOR PROPOSALS, QUOTATIONS, OR BIDS. NO SOLICITATION IS CURRENTLY AVAILABLE. A Market Survey is being conducted to determine if there are adequate Small Businesses, HUBZone, 8(a), or Service Disabled Veteran Owned Business contractors for the following proposed contract. Contract will consist of maintenance and new work dredging within the Delaware River main navigation channel and placement of the dredged material in the Oldmans Confined Disposal Facility: (a) Dredging work will be required in portions of the Tinicum, Eddystone, Chester, Marcus Hook, and Bellevue Ranges of the Delaware River main channel from Station 90+000 to Station 155+000 and in a portion of the Marcus Hook Anchorage; (b) Dredging shall be required to a depth of 45 feet below MLLW (47 feet below MLLW from approximately Station 119+500 to Station 128+500) plus 1-foot allowable over depth within the contract work limits; (c) The side slope dredging requirements for this project are 3H to 1V within the contract work limits; (d) The total estimated dredging quantity is 4.0 million cubic yards with approximately 1.5 million cubic yards in the base contract and 2.5 million cubic yards in Options; (e) Award of this contract is subject to the availability of funds; (f) All work and services in the base contract and Option 1 shall be completed no later than December 31, 2017; all work and services in Option 2 shall be completed no later than December 1, 2018. The contract period of performance is 365 calendar days after receipt of the Notice to Proceed. Estimated cost range of the project is $25,000,000.00 to $100,000,000.00. The NAICS Code for this project is 237990 with a size standard of $36.5 Million. Responses to this sources sought announcement will be used by the government to make appropriate acquisition decisions. All interested Small Business, HUBZone, 8(a), or Service Disabled Veteran Owned Business contractors should submit a narrative demonstrating their Specialized Experience in similar type contracts, Past Performance, Key Personnel. Capability statements should include size/classification of your firm, details of similar projects, completion dates, references and contract amount. Narratives shall be no longer than FIVE (5) pages. Responses should be sent to Robert Hilton at robert.r.hilton@usace.army.mil to reach this office on or before April 5, 2017 no later than 3:00 p.m.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA61/W912BU-17-R-DRMCD-UPPERRCH-E/listing.html)
- Record
- SN04444287-W 20170324/170322235133-0a248aef498a7c2cc34e682bcb8af0e0 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |