Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF MARCH 26, 2017 FBO #5602
SOLICITATION NOTICE

Z -- HOOD MINING TAR GAP MINE 3061 PROJECT

Notice Date
3/24/2017
 
Notice Type
Presolicitation
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
OSM, Headquarters 1951 Constitution Ave, NW Washington DC 20240 US
 
ZIP Code
00000
 
Solicitation Number
S17PS00024
 
Response Due
5/10/2017
 
Archive Date
5/25/2017
 
Point of Contact
Lamb, Michael
 
Small Business Set-Aside
Total Small Business
 
Description
The Department of the Interior's Office of Surface Mining Reclamation and Enforcement intends to release an Invitation for Bid (IFB), Solicitation No. S17PS00004, for Hood Mining Tar Gap 3061 Mine Reclamation Project, on or about April 10, 2017. NAICS 237990 is applicable. Size standard is $36.5M. Reclamation of the Hood Mining Tar Gap 3061 site is being funded by bond forfeiture and civil penalty monies. Award shall not exceed $198,000.00. The project site is located in Grimsley/Wilder, Fentress County, Tennessee. The majority of the work shall include the mobilization and demobilization of contractor ¿s workers, equipment, and materials. Site preparation, clearing & grubbing, erosion and sediment control installation and maintenance. Excavation of an area to dispose of stockpiled coal. Construction and placement of rock lined and vegetative drainage channels. The general regrading, and the revegetation of all disturbed areas. The IFB will result in a single, firm fixed price contract to be awarded to the lowest responsive, responsible bidder. The IFB will be released publicly at https://www.fedconnect.net, and all documents in the solicitation package can be viewed by clicking Search Public Opportunities on the Home page, then searching by Reference Number S17PS00004. No hard copies of the IFB will be issued. Amendments, if any, will also be posted on FedConnect. Pre-Bid Conference will be held on or about April 19, 2017. The period of construction performance is 50 calendar days with an anticipated start date mid to late May. Bids will be due on or about May 10, 2017. Bidders must have an ACTIVE Registration in the System for Award Management (SAM) at https://www.sam.gov. Point of contact for this action is Michael Lamb. All questions and/or comments in response to this IFB shall be submitted in writing, by email, to mlamb@osmre.gov. No telephonic requests will be accepted.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOI/OSM/1438/S17PS00024/listing.html)
 
Record
SN04446783-W 20170326/170324234318-04495c44c056ec260ed61f883c94ff97 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.