Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF MARCH 29, 2017 FBO #5605
MODIFICATION

Z -- WY-SHOSHONE POWERPLANT ROOF REPLACEMENT - Solicitation 2

Notice Date
3/27/2017
 
Notice Type
Modification/Amendment
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
Bureau of Reclamation Great Plains Regional Office 2021 4th Ave. N. GP-5000 Billings MT 59101 US
 
ZIP Code
00000
 
Solicitation Number
R17PS00266
 
Response Due
4/26/2017
 
Archive Date
10/1/2017
 
Point of Contact
Paris Everson, Phone: (406) 247-7817
 
E-Mail Address
peverson@usbr.gov
(peverson@usbr.gov)
 
Small Business Set-Aside
Woman Owned Small Business
 
Description
Solicitation Number R17PS00266 Work is located at Shoshone Powerplant, in Park County, Wyoming approximately 4.5 miles west of Cody, Wyoming. The power plant is located near the base of the Buffalo Bill Dam along a Government-owned restricted access road adjacent to North Fork Highway (State Route 14, 16 and 20) in the Shoshone River Gorge, The Shoshone Powerplant was constructed in 1922. The power plant roof is in its original state and is past its 20 year service life. Without replacing the roof decking & materials, leakage may occur and become uncontrollable, causing significant water & corrosion damage within the powerplant. The principal components of work to be performed under these specifications include the following: 1) Removal of existing roof ballast, haul to off-site location, stockpile and grade; 2) Removal of existing asbestos-cement underdrain pipes and asbestos weatherproofing materials from roof deck; 3) Clean and prepare the roof deck to receive new roofing system; 4) Install new roof deck drainage system including the replacement of perforated underdrain pipes, removal and replacement of drain well structures and cleaning of catch basins; 5) Furnish all materials and perform all work to install new roof waterproofing system across entire roof deck; including all roof accessory elements; 6) Install new EPS Geofoam and ballast system on roof deck; 7) Provide manufacturer’s warranty of workmanship and materials for all components of the roofing system.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/notices/2ab9d03fb0ebedf9bd0ac9f504f50233)
 
Place of Performance
Address: Work is located at Shoshone Powerplant, in Park County, Wyoming approximately 4.5 miles west of Cody, Wyoming. The power plant is located near the base of the Buffalo Bill Dam along a Government-owned restricted access road adjacent to North Fork Highway (State Route 14, 16 and 20) in the Shoshone River Gorge, Cody, Wyoming, United States
 
Record
SN04448330-W 20170329/170327234552-2ab9d03fb0ebedf9bd0ac9f504f50233 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.