Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF APRIL 05, 2017 FBO #5612
SOLICITATION NOTICE

Y -- Stanley Lake Campground Improvement Project 2017

Notice Date
4/3/2017
 
Notice Type
Presolicitation
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
Department of Agriculture, Forest Service, R-4 SW Idaho/Nevada Acquisition Center, 1249 S. Vinnell Way, SUITE 200, Boise, Idaho, 83709, United States
 
ZIP Code
83709
 
Solicitation Number
AG-0261-S-17-0003
 
Archive Date
10/1/2017
 
Point of Contact
KAREN L. MORTHLAND, Phone: 2083734115, SHAWN ROBNETT, Phone: (208) 737-3206
 
E-Mail Address
KMORTHLAND@FS.FED.US, SROBNETT@FS.FED.US
(KMORTHLAND@FS.FED.US, SROBNETT@FS.FED.US)
 
Small Business Set-Aside
Total Small Business
 
Description
AG-0261-S-17-0003 Stanley Lake Campground Improvement Project 2017 IN APPROXIMATELY 15 DAY'S, THE SOLICITATION FOR THIS CONSTRUCTION PROJECT WILL BE AVAILABLE TO VIEW AND PRINT. The intent of the contract is to provide for the complete construction of the project described in the contract. Unless otherwise provided, the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies and perform all work required to complete the project in accordance with drawings, specifications, and provisions of the contract. The primary components of the project include the following and are in order of preference of how the work will proceed: 1. Campground expansion (Stanley Lake Campground) A new campground loop will be added to the existing Stanley Lake Campground on the northeast shore of the lake. It will include new campsites, a camp host site with septic holding tank, drinking water hand pump, toilets, and garbage/recycling station. Campsites will include a tent pad, picnic table, and fire ring. The existing access road leading to the Stanley Lake and Lakeview Campgrounds will be relocated approximately 500 feet west of its current location so that it directly accesses the overlook parking lot. The new access road will include a turn-out with a three panel information board. 2. Boat Launch and Day Use renovation/construction A new boat launch and day use picnic area will be developed. Boat launch facilities will include a one lane, pre cast concrete plank boat launch supported by one handling dock, a paved boat prep area and parking area for 5 vehicles with trailers, and an accessible concrete vault toilet (SST model). A day use and picnic area will be developed adjacent to the new boat launch. Facilities will include a gravel parking area for 25 vehicles and 4 to 6 fully accessible picnic tables and fire rings. Optional work will include the following: 1. Existing Infrastructure Existing hand pump wells will be upgraded to fully accessible models and include accessible paths, as well as concrete pads and casing heights that meet Idaho Department of Environmental Quality standards. All rotting barrier logs with dangerously exposed rebar or splintered ends will be replaced with barrier rock. 2. Trails and Trailhead construction A non-motorized trail will be constructed using gravel material to connect the campgrounds on the northeast shore to the boat launch, day use area, and beaches on the northwest shore. Where the trail passes through wetlands, short segments of boardwalk will be installed to facilitate water movement and maintain wetland function. The existing trailhead parking area will be reconstructed to accommodate 5 vehicles with trailers and 20 to 25 single vehicles. The surfacing for the road and parking area will consist of crushed surfacing. 3. Campground renovation (Stanley Lake and Lakeview Campgrounds) Optional work will include replacing or improving, picnic tables, fire rings, camp pads, parking spurs, toilets, and trails at Lakeview and Stanley Lake campgrounds. Project Location: The Stanley Lake Campground CIP is located in the Sawtooth National Recreation Area of the Sawtooth National Forest, Custer County, Idaho. From Stanley, Idaho proceed west approximately 4.5 miles on Idaho State Highway #21 to the intersection with Forest Road 70455. Turn left onto Forest Road 70455 and proceed approximately 3.50 miles to the Stanley Lake Campground Complex. Start Date: The anticipated Project Start Date is September 5, 2017. End Date: The Project End Date is August 31, 2018. Estimated Price Range: $1 Million to $5 Million Contact Shawn Robnett srobnett@fs.fed.us For More Information. NAICS Code: 237990 Size Standard: $36.5 This proposed procurement is a TOTAL SMALL BUSINESS set aside.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/261/AG-0261-S-17-0003/listing.html)
 
Place of Performance
Address: Stanley, Idaho, United States
 
Record
SN04458170-W 20170405/170403235607-945285f5e5937d4d13bb2477f4876ef6 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.