Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF APRIL 08, 2017 FBO #5615
DOCUMENT

Y -- Building 92 Floor Replacement - Waco - Attachment

Notice Date
4/6/2017
 
Notice Type
Attachment
 
NAICS
238330 — Flooring Contractors
 
Contracting Office
Department of Veterans Affairs;Network Contracting Office, NCO17;Central Texas Veterans HCS;2002 Scott Blvd;Temple TX 76504
 
ZIP Code
76504
 
Solicitation Number
VA25717B0001
 
Response Due
11/18/2016
 
Archive Date
5/4/2017
 
Point of Contact
Joyce M Mills
 
E-Mail Address
9-6026<br
 
Small Business Set-Aside
Service-Disabled Veteran-Owned Small Business
 
Award Number
VA257-17-C-0089
 
Award Date
4/4/2017
 
Awardee
WICHITA FALLS TRI-TECH, LLC;1205 WISHING TREE LN;KELLER;TX;76248
 
Award Amount
$141,910.00
 
Description
NOTICE OF CONTRACT AWARD resulting from solicitation: VA257-17-B-0001: Network Contracting Office, NCO17, has awarded a Firm Fixed Price Construction Contract, VA257-17-C-0089, Building 92 Floor Replacement, Waco, Texas, in the amount of $141,910.00; to Wichita Falls Tri-Tech, LLC 1205 Wishing Tree Lane, Keller TX 76248, 972-795-1063. Project consists of, but is not limited to; contractor shall completely prepare site for building operations, including all demolition and removal of existing structures, to prepare the site for the required project per the Scope of Work (SOW) and drawings. The contractor shall be responsible for supplying and installing W60026 Forbo Allura Wood, Classic Beech. The work will involve coordinating with FSC, COR-Michael L. Fincher 254.534.1483 to schedule removal of cubicles, computers and office furniture. The work will be performed in 8 zoned section preventing disruption of FSC Austin Finance. All work must follow conduct rules and guidelines of the VA. All work will be performed at the Central Texas VAHCS facility, 4800 Memorial Drive, Waco Texas 76711. Site Conditions: The installation should not begin until the work of all other trades has been completed, especially overhead trades. Areas to receive flooring should be clean, fully enclosed and weathertight with the permanent HVAC must be fully operational, controlled and set at a minimum of 68o F (20o C) for a minimum of seven days prior to, during, and seven days after the installation. The flooring material (including adhesive and welding rod) should be conditioned in the same manner for a minimum of 48 hours prior to the installation. Areas to receive flooring shall be adequately lighted to allow for proper inspection of the substrate, installation and seaming of the flooring, and for final inspection. Project duration shall be 120 calendar days from issuance of the Notice to Proceed (NTP). **NOTE: For Subcontracting opportunities, please contact the Prime Contractor: Wichita Falls Tri-Tech, LLC 1205 Wishing Tree Lane, Keller TX 76248, 972-795-1063 or rich@tritech-gc.com.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/VA/VACTHCS674/VACTHCS674/VA25717B0001/listing.html)
 
Document(s)
Attachment
 
File Name: VA257-17-C-0089 VA257-17-C-0089_1.docx (https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=3396286&FileName=VA257-17-C-0089-000.docx)
Link: https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=3396286&FileName=VA257-17-C-0089-000.docx

 
Note: If links are broken, refer to Point of Contact above or contact the FBO Help Desk at 877-472-3779.
 
Record
SN04463874-W 20170408/170407000048-cc92a0f858513e975f1efe0442f8aaf7 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.