Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF APRIL 15, 2017 FBO #5622
DOCUMENT

J -- UPS Battery Replacement and Refresh services Questions and Answers #1 - Attachment

Notice Date
4/13/2017
 
Notice Type
Attachment
 
NAICS
811212 — Computer and Office Machine Repair and Maintenance
 
Contracting Office
Strategic Acquisition Center - Frederick;Department of Veterans Affairs;321 Ballenger Center Drive, Suite 125;Frederick MD 21703
 
ZIP Code
21703
 
Solicitation Number
VA119A17Q0166
 
Response Due
4/19/2017
 
Archive Date
5/19/2017
 
Point of Contact
Nathan Bradley
 
E-Mail Address
5-1627<br
 
Small Business Set-Aside
Service-Disabled Veteran-Owned Small Business
 
Description
VA119A-17-Q-0166 Amendment P00001 The purpose of this amendment is to provide the Government s responses to the questions below. Questions and Answers #1: Can you please let me know if there is easy access to the locations and if there is a loading dock at both locations?   There is easy access to both locations.     Tuscaloosa has a small loading dock, Birmingham does not, but the access door is very close to the data room where the batteries will be installed.     Can the batteries be moved via a  pallet jack and relocated by using an elevator?   The batteries can be moved by pallet jack in Birmingham only to the door that leads in to the outer room area for the data room.       The same would go for Tuscaloosa.     In both cases, the contractor would have to provide the pallet jack.     Birmingham is not located at a VAMC, and in Tuscaloosa, the logistics group is too far away from our building to provide a pallet jack.     Will the batteries have to be carried down any stairs?     No for Birmingham, possibly for Tuscaloosa.     The steps leading down from the loading dock are 4-5, but there is also a handicap ramp that can be used in lieu of the steps.     Can the replacement batteries be stored in the room where they will be installed?     Tuscaloosa   - yes, Birmingham no.     The data room in Birmingham is not large enough to store the batteries.       Is the 4 year option only for the  Tuscaloosa OI&T Field Office?     Yes, Birmingham currently has a separate maintenance agreement in place for the UPS unit.       0001 only mentions replacing batteries at    Birmingham OI&T Field Office.        That is correct.     The Birmingham UPS only needs to have the batteries replaced.     No other work is required for this UPS.      
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/VA/AFMLOVASS/VASSMD/VA119A17Q0166/listing.html)
 
Document(s)
Attachment
 
File Name: VA119A-17-Q-0166 VA119A-17-Q-0166_1.docx (https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=3413158&FileName=VA119A-17-Q-0166-001.docx)
Link: https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=3413158&FileName=VA119A-17-Q-0166-001.docx

 
Note: If links are broken, refer to Point of Contact above or contact the FBO Help Desk at 877-472-3779.
 
Record
SN04471576-W 20170415/170413234855-6201770e84266218072d6283fafcdaa0 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.