SOLICITATION NOTICE

Y -- The U.S. Army Corps of Engineers (USACE) Transatlantic Afghanistan District (TAA) has a requirement for construction of facilities necessary to deliver electricity to the 1/111th Corps Garrison at Darulaman, Camp Commando Garrison, and MFDU Garrison. - W5J9JE-17-R-0006

Notice Date
4/18/2017
 
Notice Type
Presolicitation
 
NAICS
237130 — Power and Communication Line and Related Structures Construction
 
Contracting Office
Department of the Army, U.S. Army Corps of Engineers, USACE Middle East District, Attn: CETAC-PD-CT, 201 Prince Frederick Drive, Winchester, Virginia, 22602-5000, United States
 
ZIP Code
22602-5000
 
Solicitation Number
W5J9JE-17-R-0006
 
Archive Date
5/18/2017
 
Point of Contact
Adrian O. Gavins, Phone: 5407234949
 
E-Mail Address
Adrian.o.gavins@usace.army.mil
(Adrian.o.gavins@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Description
W5J9JE-17-R-0006 ANA-17-020 ANA AEI Elec Intr DarulamanCamp Command The U.S. Army Corps of Engineers (USACE) Transatlantic Afghanistan District (TAA) has a requirement for construction of facilities necessary to deliver electricity to the 1/111th Corps Garrison at Darulaman, Camp Commando Garrison, and MFDU Garrison. The 1/111th Corps Garrison at Darulaman, Camp Commando Garrison, and MFNDU Garrison electrical connections will be offered as a single contract. An expansion of the Brishnakot substation is required to distribute one 20 kV circuits to 1/111th Corps Garrison at Darulaman and the Camp Commando Garrison in Kabul Province. To provide reliable power to MFNDU, an expansion of the North-West substation is necessary to distribute one 20 kV circuit. The substation expansions shall include the design of a new 20 kV yard with indoor switchgear, connection to one 110 kV/20-15 kV power transformer rated no less than 25 MVA, one 20 kV line bay capable of expansion to 34 MVA, and line dead-end structures for connection to four 20 kV distribution system lines. The project will include the electrical distribution inside the ANA facilities as well. The project will include the material, labor, and all other construction components of the project as shown in the conceptual plans and technical specifications. Work will also include civil site work, to include grading, leveling and compaction for facility/tower construction. Additional work includes demining the transmission line routes and substation locations, and project security. Any and all deficient work will be repaired or replaced. The Contractor shall provide a complete and fully functioning power system. These electrical power distribution system and substation shall be designed and constructed in accordance with current electrical and building codes, safety, and security standards, and applicable to local standards. This project will be awarded based on the CLINs in the bid schedule and will be awarded to a single offeror.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA78/W5J9JE-17-R-0006/listing.html)
 
Place of Performance
Address: Kabul Province, Kabul, Non-U.S., Afghanistan
 
Record
SN04477176-W 20170420/170418235935-c8f9d4e54187a0bfc5d2be306e2bdb17 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.