SOLICITATION NOTICE
Y -- South Fork Nooksack Trail Bridge - DRAFT Drawings - Project Photos
- Notice Date
- 4/25/2017
- Notice Type
- Presolicitation
- NAICS
- 237310
— Highway, Street, and Bridge Construction
- Contracting Office
- Department of Agriculture, Forest Service, R-6 Contracting North - Mt. Baker-Snoqualmie NF, 2930 Wetmore Avenue Ste 3A, Everett, Washington, 98201, United States
- ZIP Code
- 98201
- Solicitation Number
- AG-05M6-S-17-0043
- Point of Contact
- Brian A. Johnson, Phone: (425) 783-6056
- E-Mail Address
-
bajohnson03@fs.fed.us
(bajohnson03@fs.fed.us)
- Small Business Set-Aside
- Total Small Business
- Description
- Project Photos DRAFT Drawings SCOPE OF CONTRACT : This project includes the installation of a 38' steel girder pedestrian bridge with timber decking and handrails. This project includes the transportation and installation of the trail bridge superstructure, approach fills, footings, backwalls, decking, and handrails. The steel girders and associated hardware, timber decking, deck nailers, handrails, and backwalls are Government Supplied. Contractor to supply all timber hardware, concrete grade beams, and anchor bolts. All Government Supplied Materials are located at the Koma Kulshan storage yard near Baker Lake. The bridge will be installed on the South Fork Nooksack Trail. A large staging area and crew camp is located at the northern terminous of this trail (Pioneer Camp). Use of helicopters has been approved for this contract. PROJECT LOCATION : This project is located on the Mt. Baker Ranger District Ranger District of the Mt. Baker-Snoqualmie National Forest (T37N - R7E - Sec. 22). From the Mount Baker Ranger District office in Sedro-Woolley, travel east on Hwy 20 for 16 miles, turn left on the Baker Lake Highway (FSR 11) and continue for 12 miles to FSR 12, and turn left on FSR 12 and go 14 miles to the Pioneer Camp Trailhead. The South Fork Nooksack Trail is located on the left (south) side of the parking area. The bridge site is 2000' south of the Trailhead. DESIRED DATE FOR STARTING WORK : July 10, 2017 NUMBER OF DAYS FOR CONSTRUCTION : 113 ESTIMATED COMPLETION DATE : October 31, 2017 DISCLOSURE OF THE MAGNITUDE OF CONSTRUCTION PROJECTS : The Government's estimate is between $25,000.00 and $100,000.00. WORK RESTRICTIONS : Wildlife --- the project area has a seasonal closure for November 1st through July 1st for wildlife winter range. Noise Restrictions --- From July 1st through September 23rd, all activities that generate noise above 92 decibels shall only occur between 2 hours after sunrise and 2 hours before sunset to minimize potential adverse effects to breeding marbled murrelets. PRE-BID CONFERENCE : None scheduled. If you have technical questions, call Luke Silvis (360) 854-2624 or e-mail lesilvis@fs.fed.us. PROJECT PHOTOS / DRAFT DRAWINGS : Photos and draft drawings are attached for planning purposes. PROPOSAL PREPARATION : Once the formal soliciation is issued 15 calendar days after this presolicitation notice, the Forest Service will only be allowing 14 calendar days for proposal preparation and submission due to a requirement that this contract must be awarded no later than June 1, 2017. PAYMENT BOND REQUIREMENT : A payment bond is required after contract award is made.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/05M6/AG-05M6-S-17-0043/listing.html)
- Place of Performance
- Address: Mt. Baker Ranger District, Whatcom County, United States
- Record
- SN04483970-W 20170427/170425234149-86e453adafbc6a058ed8a99eb98c9757 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |