Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF APRIL 28, 2017 FBO #5635
SOLICITATION NOTICE

Z -- Beach Erosion Control and Hurricane Protection Project, Miami-Dade County, Florida, Beach Renourishment 2017, Sunny Isles Beach

Notice Date
4/26/2017
 
Notice Type
Presolicitation
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
Department of the Army, U.S. Army Corps of Engineers, USACE District, Jacksonville, P.O. Box 4970, Jacksonville, Florida, 32232-0019, United States
 
ZIP Code
32232-0019
 
Solicitation Number
W912EP-17-B-0002
 
Archive Date
8/1/2017
 
Point of Contact
Susan J. Forchette, Phone: 9042322158
 
E-Mail Address
susan.j.forchette@usace.army.mil
(susan.j.forchette@usace.army.mil)
 
Small Business Set-Aside
Total Small Business
 
Description
DESCRIPTION OF WORK: This project will nourish critically eroded shoreline at Sunny Isles Beach. The project beach has a maximum berm elevation of +6.8 feet, NAVD88, and a minimum berm elevation no less than +6.1 feet, NAVD88 with a foreshore slope of 1 Vertical on 10 Horizontal to tie into existing grade. The sand source for the project will be an upland source, and material will be truck hauled to the project location. The upland sourcewill be selected by the Contractor meeting criteria required in the specifications. The Construction Baseline (CBL) and Erosion Control Line (ECL) are the same and the width of the restored beach varies measured perpendicular to the CBL/ECL as shown on the drawings. The work is divided into a Base and four options. Work for the base and all options includes vibration control and monitoring, environmental species monitoring, and turbidity monitoring. The contractor shall begin performance within 30 calendar days and complete performance within 209 calendar days after the issuance of Notice to Proceed. The Invitation for Bid (IFB) will be issued on or about 12 May 2017 and bids will be due on or about 28 June 2017. Magnitude of construction is between $13,000,000.00 and $18,000,000.00. THIS IS A SMALL BUSINESS SET-ASIDE ACQUISITION. ALL RESPONSIBLE OFFERORS ARE ENCOURAGED TO PARTICIPATE.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA17/W912EP-17-B-0002/listing.html)
 
Place of Performance
Address: Sunny Isle Beach, Miami-Dade County, Florida, United States
 
Record
SN04486765-W 20170428/170426235748-f00d25f52900fe037e2ae5bc797031f3 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  © 1994-2020, Loren Data Corp.