Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF MAY 05, 2017 FBO #5642
SOLICITATION NOTICE

Z -- Replace Kitchens in Family Housing Buildings # 276 & 283, USAG Bavaria, Grafenwoehr Military Community - Tower Barracks

Notice Date
5/3/2017
 
Notice Type
Presolicitation
 
NAICS
236116 — New Multifamily Housing Construction (except Operative Builders)
 
Contracting Office
Department of the Army, Army Contracting Command, ECC, 409th CSB (W912PB) RCO Bavaria, UNIT 28130, APO AE, 09114, Germany
 
ZIP Code
00000
 
Solicitation Number
W912PB-17-B-8111
 
Archive Date
7/27/2017
 
Point of Contact
Sean O. Higgins, Phone: DSN 314-475-8716
 
E-Mail Address
sean.o.higgins.civ@mail.mil
(sean.o.higgins.civ@mail.mil)
 
Small Business Set-Aside
N/A
 
Description
This project specifies the following work: Replace existing kitchens within Buildings # 276 and # 283, located on the first, second and third floor. A total of 24 kitchens will be renewed. Building # 276 - 12 each: - 6 each "standard" - 6 each "arranged in a mirrored layout" Building # 283 - 12 each: - 6 each "standard" - 6 each "arranged in a mirrored layout" Perform the following work on the first floor, on the second floor and on the third floor: 1. Provide a dust-tight security partition with job-site door leaf of wood and separate cylinder in each apartment, to allow for separation of the living room and the working area. It must be guaranteed that the apartments remain habitable for the residents during the entire construction period. 2. Dismount the existing kitchens including sinks and faucets. Furthermore, clear and dismount the refrigerator, the dish washer and the freestanding kitchen range. Store them intermediately and reinstall them as well as reconnect them at a later date. 3. Dismantle the existing wall tiles. 4. Deliver and install new kitchen furniture with recess back panels and counter tops. 5. Connect the existing electrical kitchen appliances. 6. Replace ceiling light fixtures within the respective buildings, apartments and kitchens. Note: The dismantling of the existing PVC floor covers including base boards as well as the installation of the new PVC floor covers will be performed by means of a separate contract. Coordination of the respective sections via COR is required. During the entire construction period the apartments are still being used by residents resulting in obstructions for the contractor. Take all necessary precautions to guarantee construction site safety.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/notices/7e841d68a463f1b30b6a31707ecb0efe)
 
Record
SN04495341-W 20170505/170503235813-7e841d68a463f1b30b6a31707ecb0efe (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.