Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF MAY 06, 2017 FBO #5643
SPECIAL NOTICE

Y -- Pipeline Dredging Industry Day Meeting, USACE Portland District

Notice Date
5/4/2017
 
Notice Type
Special Notice
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
Department of the Army, U.S. Army Corps of Engineers, USACE District, Portland, Attn: CECT-NWP, PO Box 2946, Portland, Oregon, 97208-2946, United States
 
ZIP Code
97208-2946
 
Solicitation Number
W9127N-17-PIPELINE
 
Archive Date
6/7/2017
 
Point of Contact
David C. Boone, Phone: 5038084614
 
E-Mail Address
david.c.boone@usace.army.mil
(david.c.boone@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Description
THIS IS A SPECIAL NOTICE OF AN UPCOMING PIPELINE DREDGING INDUSTRY DAY MEETING. NO CONTRACT AWARD WILL BE MADE FROM THIS NOTICE. THIS IS NOT AN INVITATION FOR BIDS. The U.S. Army Corps of Engineers (USACE), Portland District, is conducting an industry day to discuss potential upcoming pipeline dredging contracts within USACE Portland District. The purpose of this meeting is to discuss future projects in an attempt to partner and communicate openly with the dredging industry early with the intent to have a better contract. The projects being discussed are Chinook Channel, Garibaldi Boat Basin Entrance, Depoe Bay, South Beach Marina at Yaquina Bay, Bandon Boat Basin, and Rogue River Turning Basin and Entrance to Boat Basin. All cubic yardage listed is approximate. The dredging at Chinook Channel, 150,000 cubic yards, will include beach nourishment on East Sand Island. The purpose of this project is erosion control and payment will be based on placement. The dredging at Garibaldi, 45,000 cubic yards, will be in-water placement with tidal restrictions. The dredging at Depoe Bay, 25,000 cubic yards, will include dredging with surf zone placement, and excavating and trucking material from the check dam. The dredging at South Beach Marina, 25,000 cubic yards, will be upland placement. The dredging at Bandon Boat Basin, 9,000 cubic yards, will be in-water placement with tidal restrictions. The dredging at Rogue River, 80,000 cubic yards, includes both upland placement at a rehandle location, and surfzone placement. The industry day meeting will be held on May 23, 2017 from 10:30 AM until 11:30 AM. Firms interested in attending should contact David Boone, Contract Specialist via email at david.c.boone@usace.army.mil and provide the names and email addresses of the individuals who will attend. This meeting will be held in person at the Block 300 Building, 333 SW 1st Ave, Portland, Oregon. For those who cannot attend, an informational powerpoint presentation can be provided upon request.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA57/W9127N-17-PIPELINE/listing.html)
 
Place of Performance
Address: 333 SW 1st Ave, Portland, Oregon, 97204, United States
Zip Code: 97204
 
Record
SN04495915-W 20170506/170504235049-a8b1cbdeed48466dada76c32cc44c5f9 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.