Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF MAY 06, 2017 FBO #5643
SPECIAL NOTICE

28 -- IMPROVED TURBINE ENGINE ENGINEERING AND MANUFACTURING DEVELOPMENT REQUEST FOR INFORMATION

Notice Date
5/4/2017
 
Notice Type
Special Notice
 
NAICS
336412 — Aircraft Engine and Engine Parts Manufacturing
 
Contracting Office
Department of the Army, Army Contracting Command, ACC - RSA (W58RGZ) Aviation, SPARKMAN CIR BLDG 5303, Redstone Arsenal, Alabama, 35898-0000, United States
 
ZIP Code
35898-0000
 
Solicitation Number
W58RGZ-17-R-0224
 
Point of Contact
Felix R. Marrero, Phone: (256) 313-5445, Julie A. Kress, Phone: (256 ) 313-1354
 
E-Mail Address
felix.r.marrero.civ@mail.mil, julie.a.kress2.civ@mail.mil
(felix.r.marrero.civ@mail.mil, julie.a.kress2.civ@mail.mil)
 
Small Business Set-Aside
N/A
 
Description
IMPROVED TURBINE ENGINE PROGRAM (ITEP) REQUEST FOR INFORAMTION FOR THE ENGINEERING and MANUFACTURING DEVELOPMENT (EMD) ANNOUNCEMENT IS FOR INFORMATION AND PLANNING PURPOSES ONLY. IT DOES NOT CONSTITUE AN INVITATION FOR BID (IBF) OR A REQUEST FOR PROPOSAL (RFP) AND IS NOT TO BE CONSTRUED AS A COMMITMENT BY THE GOVERNMENT. THE U.S. GOVERNEMENT WILL NOT BE LIABLE FOR ANY COST ASSOCIATED IWTH PREPARATION OF ANY RESPONSE TO THIS RFI OR ITS ASSOCIATED INFORMATIONAL PACKAGE. TABLE OF CONTENTS. TABLE OF CONTENTS 1.1 PURPOSE. THE U.S. ARMY IMPROVED TURBINE ENGINE PRODUCT OFFICE (ITE PO) SEEKS INFORMATION ON THE CRITICAL DESIGN, DEVELOPMENT, QUALIFICATION, FLIGHT TEST SUPPORT, PRODUCT SUPPORT AND MANUFACTURING READINESS SUPPORT FOR AN IMPROVED TURBINE ENGINE (ITE) IN ACCORDANCE WITH (IAW) THE DRAFT SYSTEM REQUIREMENTS DOCUMENT (SRD), DRAFT STATEMENT OF WORK (SOW), AND DRAFT DOCUMENT SUMMARY LIST (DSL) (ALL DRAFT DOCUMENTS ARE AVAILABLE UPON REQUEST). THE ITE IS A 3000 HORSEPOWER ENGINE THAT PROVIDES AN ADVANCED TURBOSHAFT PROPULSION CAPABILITY, PRIMARILY FOR APPLICATION TO THE ARMYS BLACK HAWK AND APACHE HELICOPTERS. THE ITE IS BASED UPON THE OPERATIONAL ENERGY FOR SUSTAINED GROUND OPERATIONS INITIAL CAPABILITIES DOCUMENT (OE ICD) AND EMPHASIZES SIGNIFICANT INCREASES IN PERFORMANCE CAPABILITY (WORLDWIDE PERFORMANCE IN HIGH/HOT CONDITIONS AT 6K/95) AND REDUCED COST OF OWNERSHIP (FUEL AND MAINTENANCE SAVINGS) THAT SUPPORT THE DOD'S CAPABILITY NEEDS FOR MULTI-MISSION MOBILITY, PERSISTENT ENGAGEMENT, PROTECTION, AND PERSISTENT COMMAND AND CONTROL, INTELLIGENCE, SURVEILLANCE AND RECONNAISSANCE (C2ISR) PLATFORMS. PREVIOUS REQUESTS FOR INFORMATION FOR THIS SUBJECT WERE ISSUED ON 22 JULY 2009, W58RGZ-09-R-0589. UPDATED REQUESTS FOR INFORMATION WERE ISSUED ON 14 DECEMBER 2010 (W58RGZ-11-R-0164) AND AMENDED 27 DECEMBER 2010 (W5RGZ-11-R-0173), 26 JANUARY 2012 (W58RGZ-12-R-0243), 07 FEBRUARY 2012 (W58RGZ-12-R-0260), 17 FEBRUARY 2012 (W58RGZ-12-R-0267), 5 JUNE 2013 (W58RGZ-13-R-0317), 20 JUNE 2013 (W58RGZ-13-R-0333), 6 JUNE 2013 (W58RGZ-13-R-0337), AND 17 OCT 2014 (W58RG-15-R-0054). THIS RFI REQUESTS INFORMATION RELATED TO COST AND INTEGRATION, AND REQUESTS FEEDBACK ON THE GOVERNMENT FURNISHED DATA. 1.2 CONCEPT. FOLLOWING A MILESTONE B DECISION, THE GOVERNMENT INTENDS TO AWARD AN ENGINEERING AND MANUFACTURING DEVELOPMENT (EMD) EFFORT THAT RESULTS IN A US ARMY MILITARY QUALIFIED ITE THAT HAS DEMONSTRATED A TECHNOLOGY READINESS LEVEL (TRL) OF 8 AND A MANUFACTURING READINESS LEVEL (MRL) OF 8. WHICH CONFORMS TO THE REQUIREMENTS OUTLINED IN THE DRAFT SRD. (ALL DRAFT DOCUMENTS ARE AVAILABLE UPON REQUEST). SECTION 2 ADMINISTRATIVE 2.1 PURPOSE. TO EXPLAIN THE FORMAT AND TYPE OF INFORMATION THE GOVERNMENT WISHES TO RECEIVE IN RESPONSE TO THIS RFI, AND TO DEFINE THE DATA THE GOVERNMENT WILL PROVIDE. RESPONSES SHALL BE STRUCTURED AGAINST EACH OF THE MAJOR AREAS OF INTEREST, AS DESCRIBED IN THIS RFI AND SHALL BE IN ENGLISH USING U.S. MILITARY/NATO TERMS WHENEVER POSSIBLE. 2.2 GOVERNMENT FURNISHED DATA. ALL GOVERNMENT FURNISHED DATA WILL BE PROVIDED ELECTRONICALLY ON CD-ROM. UPON RELEASE OF THIS RFI, CD-ROMS WILL BE AVAILABLE IN PERSON OR BY MAIL FROM THE CONTRACTING OFFICER AT THE ARMY CONTRACTING COMMAND, REDSTONE ARSENAL (ACC-RSA). THE CD-ROM WILL CONTAIN UNCLASSIFIED DATA AND DATA FOR WHICH EXPORT IS RESTRICTED BY THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C SEC 2751 ET SEQ) OR THE EXPORT ADMINISTRATION ACT (TITLE 50, U.S.C. APP 2401-2402). ANY U.S. CITIZEN REPRESENTING ANY U.S. ENTITY THAT HAS RELEVANT AEROSPACE BUSINESS MAY REVIEW/RECEIVE THE INFORMATION BY SUBMITTING A VISIT REQUEST PROVIDING THE NECESSARY INFORMATION TO VERIFY THE COMPANY/INDIVIDUAL SECURITY CLEARANCE TO MS. ARNETTA MANUEL (FAX: 256-313-4346) OR ARNETTA.D.MANUEL.CIV@MAIL.MIL. FOREIGN VISIT REQUESTS ARE SUBMITTED THROUGH RESPECTIVE EMBASSIES TO HQDA, ATTN: DAMI-IR. REQUESTS RECEIVED IN ANY OTHER MANNER WILL NOT BE HONORED. THE FOLLOWING INFORMATION WILL BE PROVIDED ON CD-ROM FOR CONTRACTOR USE: DRAFT SRD, DRAFT SOW, DRAFT CONTRACT DATA REQUIREMENTS LIST (CDRLS), DRAFT DSL, AND NOTIONAL PROGRAM MILESTONE SCHEDULE. INFORMATION REQUESTED IN SUPPORT OF RFI RESPONSES WILL BE PROVIDED AS THAT INFORMATION IS AVAILABLE. 2.3 NON-DISCLOSURE AGREEMENTS. THE GOVERNMENT ANTICIPATES USING THE FOLLOWING SUPPORT CONTRACTORS TO ASSIST IN THE EVALUATION OF YOUR RESPONSES TO THIS RFI: A) QUANTITECH, INC., 360A QUALITY CIRCLE, SUITE 100, HUNTSVILLE, AL 35806; B) TECOLOTE RESEARCH, INC., 420 S. FAIRVIEW AVE., SUITE 201, GOLETA, CA 93117; C) IRON MOUNTAIN, 7047 OLD MADISON PIKE, SUITE 350, HUNTSVILLE, AL 35806; D) 4M RESEARCH, INC., 675 DISCOVERY DR. BLDG. 2, SUITE 303, HUNTSVILLE, AL 35806; E) DIGITAL FUSION, 4904 RESEARCH DRIVE, HUNTSVILLE, AL 35805; F) INTUITIVE, 5030 BRADFORD DR., BUILDING 2 SUITE 205, HUNTSVILLE, AL 35805; G) JOHN H. NORTHROP & ASSOCIATES, INC., 11602 LAWTER LANE, CLIFTON, VA 20124; H) KORD, 635 DISCOVERY DRIVE NW, HUNTSVILLE, AL 35806; I) PEOPLE TEC, 4901-I CORPORATE DRIVE, HUNTSVILLE, AL 35805; J) S3, 615 DISCOVERY DRIVE, HUNTSVILLE, AL 35806, K) SAIC, 1710 SAIC DRIVE, MCLEAN, VA 22012; L) UNIVERISTY OF ALABAMA IN HUNTSVILLE, 301 SPARKMAN DRIVE, VBH E-12, HUNTSVILLE, AL 35899. COMPLETE EVALUATIONS OF CONTRACTOR RESPONSES TO THIS RFI IS NOT POSSIBLE UNLESS RESPONDENTS EXECUTE NON-DISCLOSURE AGREEMENTS WITH THE AFORESTATED SUPPORT CONTRACTORS. IF ADDITIONAL SUPPORT CONTRACTORS ARE UTILIZED DURING THE ASSESSMENT PROCESS, RESPONDENTS WILL BE NOTIFIED TO OBTAIN NECESSARY AGREEMENTS. RESPONDENTS SHOULD PROVIDE COPIES OF EXECUTED NON-DISCLOSURE AGREEMENTS WITH THEIR RESPONSES. SECTION 3 TECHNICAL DATA 3.1 PROGRAM OBJECTIVE. THE GOAL OF THE PROGRAM IS TO COMPLETE ENGINEERING AND MANUFACTURING DEVELOPMENT AND QUALIFY AN ENGINE THAT MEETS THE PERFORMANCE, AIRWORTHINESS QUALIFICATION, MANUFACTURING READINESS, PRODUCT SUPPORT AND LOGISTICS REQUIREMENTS IN A COST EFFECTIVE AND TIMELY MANNER. 3.2 PURPOSE. THE GOVERNMENT DESIRES TO OBTAIN INFORMATION TO INFORM A MILE STONE (MS) B DECISION AND TO DEFINE SCHEDULE AND PROGRAM REQUIREMENTS FOR ITE EMD DESIGN AND QUALIFICATION, INTEGRATION FLIGHT TESTING, AND A POTENTIAL FUTURE MS C DECISION FOR LOW RATE INITIAL PRODUCTION. SPECIFICALLY, THE GOVERNMENT DESIRES INDUSTRY COMMENTS TO THE DRAFT SRD, DRAFT SOW, DRAFT CDRLS, DRAFT DSL, AND NOTIONAL PROGRAM SCHEDULE, WHICH HAS INCORPORATED PREVIOUSLY SUBMITTED INDUSTRY COMMENTS AS WELL AS OTHER RECENT ADDITIONS. A DRAFT Master Test Plan and schedule which supports the program milestone schedule provided by the government is requested. this plan should provide a list of engine and component testing to support ITE qualification iaw the program schedule requirements, to include The recommended number, estimated cost and utilization of engine and component test assets to support qualification and platform integration flight test. COST INFORMATION RELATED TO THE DEVELOPMENT, TEST AND QUALIFICATION OF THE ENGINE BROKEN DOWN BY GOVERNMENT FISCAL YEAR IS REQUESTED. 3.3 CONCEPT DESCRIPTION. 3.3.1 THE CONTRACTOR SHOULD PROVIDE COMMENTS TO THE DRAFT SRD, DRAFT SOW, DRAFT DSL, AND DRAFT CDRLS AND PROVIDE RATIONALE ON ANY SUGGESTED REQUIREMENT CHANGES. THE INFORMATION PROVIDED IN RESPONSE TO THIS RFI SHOULD CONTAIN TECHNICAL INFORMATION SUFFICIENT TO PROVIDE A CLEAR UNDERSTANDING OF THE CONTRACTOR'S RECOMMENDATIONS AND COMMENTS WITH REGARD TO THE EMD PROGRAM AND THE CONTRACTOR'S APPROACH TO MEET THE ITE PROGRAM REQUIREMENTS. INFORMATION SHALL, IN SUFFICIENT DETAIL TO CONVEY AN UNDERSTANDING OF THE ITE EMD PROGRAM, INCLUDE THE FOLLOWING: PROPOSED APPROACH, SCHEDULE, DEVELOPMENT COSTS, RECURRING COSTS, TEAMING REQUIREMENTS, PRODUCTION CAPABILITIES, AIRCRAFT MODIFICATION/IMPACTS, GOVERNMENT FURNISHED INFORMATION (GFI) / GOVERNMENT FURNISHED EQUIPMENT (GFE) REQUIREMENTS, AND TECHNOLOGY MATURITY AND MANUFACTURING READINESS USING TECHNOLOGY READINESS ASSESSMENT AND MANUFACTURING READINESS ASSESSMENT LEVELS USED BY DOD AS OF CONTRACT AWARD, AND AN APPROACH TO ACHIEVE LEVEL 8 PRIOR TO CONTRACT COMPLETION. IN ADDITION TO PROVIDING TECHNICAL DATA ON APPROACH, THE CONTRACTOR SHOULD DISCUSS COMPLIANCE TO THE DRAFT SRD AND THEIR ABILITY TO MEET FULL QUALIFICATION, LOGISTICS, PRODUCT SUPPORT, MANUFACTURING READINESS, FLIGHT TEST SUPPORT AND OPERATIONS REQUIREMENTS AS OUTLINED IN THE DRAFT SOW. 3.3.2. PROVIDE FEEDBACK CONCERNING THE CLARITY AND CORRELATION OF THE DOCUMENTS MADE AVAILABLE AND SUGGEST HOW THESE DOCUMENTS CAN BE IMPROVED TO ELICIT THE BEST AND MOST COST EFFECTIVE RESPONSES FROM INDUSTRY IF A RFP WERE TO BE RELEASED. 3.3.3 THE INTEGRATION OF THE ITE INTO THE H-60 BLACK HAWK AND AH-64 APACHE IS INTENDED TO BE ACCOMPLISHED THROUGH SEPARATE CONTRACTS BETWEEN THE USG AND THE AIRFRAME OEMS, SIKORSKY, AND BOEING RESPECTIVELY. WHILE THE AIRCRAFT OEMS WILL HAVE THE LEAD ROLE FOR THE ENGINE INTEGRATION, SUPPORT IS REQUIRED FROM THE ENGINE MANUFACTURER, TO INCLUDE ON-SITE FLIGHT TESTING ENGINEERING AND MAINTENANCE SUPPORT, INTERGATION DESIGN OPTIMIZATION, SOFTWARE SUPPORT AND DELIVERY OF PRELIMINARY FLIGHT RATED TEST ENGINES. THE CONTRACTOR SHOULD FULLY DESCRIBE THE PROPOSED ROLE AND DUTIES OF THE ENGINE MANUFACTURER IN THE ENGINE INTEGRATION PROCESS. THE REQUIRED ENGINE INTEGRATION SUPPORT IS INTENDED TO BE TASKS WITHIN THE PROPOSED ITE CONTRACT. 3.3.4. COST DATA COMMENSURATE WITH THE PROPOSED CONCEPT SHOULD BE PROVIDED IN THEN YEAR DOLLARS CONSTANT DOLLARS BROKEN DOWN BY GOVERNMENT FISCAL YEAR. USE 31 DECEMBER 2018 AS NOTIONAL CONTRACT AWARD AS A TIME BASIS FOR COST REPORTING. 3.4 QUESTIONS AND DEADLINES. TO RECEIVE FULL CONSIDERATION, RESPONSES TO 3.3.1, 3.3.2, AND 3.3.3 MUST BE RECEIVED NO LATER THAN 30 DAYS AFTER RELEASE OF THIS RFI AND THE RESPONSE TO 3.3.4 MUST BE RECEIVED WITHIN 60 DAYS. RESPONSES TO THE RFI SHALL BE DELIVERED IN ELECTRONIC FORMAT (MICROSOFT WORD, MICROSOFT EXCEL, MICROSOFT POWERPOINT, AND/OR MICROSOFT PROJECT SUBMITTED ON A CD-ROM). ARMY CONTRACTING COMMAND - REDSTONE POCS ARE FELIX MARRERO, CONTRACTING OFFICER, (256)313-5445, FELIX.R.MARRERO.CIV@MAIL.MIL OR JULIE KRESS, CONTRACT SPECIALIST, (256)313-1354, JULIE.A.KRESS2.CIV@MAIL.MIL.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/notices/d55beac46b75022629614e6a835a9862)
 
Place of Performance
Address: ARMY CONTRACTING COMMAND - REDSTONE, ATTENTION: FELIX R. MARRERO, 5304 Martin Rd, Redstone, Alabama, 35898-5280, United States
Zip Code: 35898-5280
 
Record
SN04496757-W 20170506/170504235816-d55beac46b75022629614e6a835a9862 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.