SOLICITATION NOTICE

99 -- IXPE Mandrel Diamond Turning - RFQ

Notice Date
5/16/2017
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
333314 — Optical Instrument and Lens Manufacturing
 
Contracting Office
NASA Shared Services Center (NSSC), Building 1111, Jerry Hlass Road, Stennis Space Center, Mississippi, 39529, United States
 
ZIP Code
39529
 
Solicitation Number
NNX17625425Q
 
Archive Date
6/6/2017
 
Point of Contact
Victoria C Hargrave, Phone: 2288136103
 
E-Mail Address
Victoria.C.Hargrave@nasa.gov
(Victoria.C.Hargrave@nasa.gov)
 
Small Business Set-Aside
Total Small Business
 
Description
Statement of Work Drawings 2 Drawings RFQ SECTION 1 BID SCHEDULE 1. Introduction This procurement is for diamond turning (DT) services that support the fabrication of grazing incident x-ray optics for the Imaging X-Ray Polarimetry Explorer (IXPE). Up to 6 mandrels may be provided as Government Furnished Equipment for diamond turning under this procurement. Each mandrel will be electroless nickel plated and the diamond turning operations will machine a precise figure, defined by a full Wolter Figure provided by NASA, into the surface. In order to maintain final delivery of the finished mandrels to the expected schedule, NASA may opt to select multiple vendors for this procurement. 2. General 2.1 No subdividing, farming out, or splitting of this procurement is allowed. 2.2 A diamond turning lathe shall be used in a thermally controlled environment to turn optical quality grazing-angle cylindrical mandrels 2.3 The contractor shall diamond turn the provided mandrels to achieve the dimensions as shown in drawing IXPE-MXX-005. Exact parabolic/hyperbolic prescriptions will be provided in a standard conical Wolter formula or in an approximately 15,000 line data package. 2.4 Materials to be turned will be 10 - 12% nickel-phosphorus (coated on Al6061 substrate). Starting thickness of the electroless nickel is 150 - 175 microns and an anticipated removal amount of ~ 75 - 87.5 microns is performed to meet figure requirements. 2.5 Delivery of all six completed mandrels is targeted to be 8/17/2017. 3. Contract Deliverables The contractor shall deliver completed individual mandrels to NASA within 3 days of completion of diamond turning and profile measurements for acceptance testing. The contractor shall deliver the final profile measurements to verify the profiles meets the requirements of drawing IXPE-MX-005. 4. Data Requirements 4.1 The contractor shall provide proof of capabilities (photos of equipment and examples of previous work and accuracies achieved). 4.2 The contractor shall provide equipment capabilities (list of machine capabilities). 4.3 The contractor shall provide references for recent equivalent work. 4.4 The vendor will provide a generic schedule addressing the planned DT duration for each mandrel that includes material removal rates for each DT pass. 4.5 If available, the vendor may provide a list of measurement/metrology capability. 5. Government Furnished Property and Data NASA will provide up to six mandrels identified in drawing IXPE-MXX-003 as IXPE-M01-003, IXPE-M02-003, IXPE-M03-003, IXPE-M22-003, IXPE-M23-003, and IXPE-M24-003. NASA will provide exact parabolic/hyperbolic prescriptions in a standard conical Wolter formula or in an approximately 15,000 line data package, depending on contractor requirements. 6. Period of Performance This contract period of performance is from award (estimated June 15) through 8/30/2017. 7. Quality Requirements 7.1 Final manufacturing performance will be on a "best effort/commercially reasonable" basis to meet the following DT specifications. The contractor shall consult with NASA to verify if conditions not meeting requirements are still acceptable. For example, if the prescription meets requirements but exceeds the surface roughness requirement, NASA may accept the mandrel as is rather than requesting re-work. 7.1.1 The completed surface roughness shall not exceed 300 Angstroms root-mean squared (RMS). 7.1.2 Initial thickness of the nickel coating on each mandrel is 0.008 inches. Minimum desired thickness after diamond turning is 0.004 in. It is anticipated that removal of ~ 75 - 87.5 microns is required to meet figure requirements. 7.1.3 Peak to valley profile deviation of approximately +/- 0.7 micrometer from the desired parabolic/hyperbolic prescription for each mandrel. 7.1.4 DT operations on the mandrel shall be performed so minimize subsurface damage in the electroless nickel coating. Delivery Address: NASA/Marshall Space Flight Center Central Shipping and Receiving Bldg 4631, Saturn Rd Huntsville, AL 35812 Deliver by: 8/17/2017
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/notices/b75cf22e66d3701528fb3a8380a596f6)
 
Place of Performance
Address: NASA/Marshall Space Flight Center, Central Shipping and Receiving, Bldg 4631, Saturn Rd, Huntsville, AL 35812, Huntsville, Alabama, 35812, United States
Zip Code: 35812
 
Record
SN04510187-W 20170518/170516234448-b75cf22e66d3701528fb3a8380a596f6 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.