Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF MAY 20, 2017 FBO #5657
SPECIAL NOTICE

Y -- Camp Parks, CA - Operational Readiness Transient Training Barracks

Notice Date
5/18/2017
 
Notice Type
Special Notice
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
Department of the Army, U.S. Army Corps of Engineers, USACE District, Louisville, Attn: CELRL-CT, PO Box 59, Louisville, Kentucky, 40201-0059, United States
 
ZIP Code
40201-0059
 
Solicitation Number
W912QR-CAMPPARKSBARRACKS
 
Archive Date
6/10/2017
 
Point of Contact
Jesse E. Scharlow, Phone: 5023156183
 
E-Mail Address
jesse.e.scharlow@usace.army.mil
(jesse.e.scharlow@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Description
Industry Day Time: 08:30-10:30 AM (Pacific Daylight Time) - Informational Meeting & Optional Site Visit The Industry Day informational presentation will be conducted on Wednesday, 7 June 2017 at Building 677 at Parks, CA Reserve Forces Training Area. An optional site visit will follow the informational presentation for those interested in visiting the proposed construction site. Due to security clearance requirements, it is suggested that your company limit the number of attendees requesting site clearance and access for the optional site visit. All members are strongly encouraged to attend the informational session. All interested attendees are required to bring a valid license, vehicle registration, and proof of insurance to the base. The site visit Point of Contact (POC) is Mrs. Sonia Suggs who can be reached at (502) 640-2004 or by email at Sonia.L.Suggs@usace.army.mil Project Descriptions: Construct a standard design three-story Operational Readiness Training Barracks. Buildings will be of permanent construction with reinforced concrete foundations; concrete floor slabs; reinforced concrete or masonry walls; low-slope or sloped roof; Heating, Ventilation and Air Conditioning (HVAC); and plumbing, mechanical, security and electrical systems. Supporting facilities include land clearing, paving, fencing, general site improvements and utility connections. Accessibility for the disabled will be provided. Antiterrorism/Force Protection (AT/FP) and physical security measures will be incorporated into the design including maximum standoff distances from roads, parking areas and vehicle unloading areas. Sustainability/Energy measures will be provided. Facilities will be designed to a minimum life of 40 years in accordance with DoD's Unified Facilities Criteria (UFC 1-200-02) including energy efficiencies, building envelope and integrated building systems performance. Estimated Advertisement Date: 29 June 2017 Estimated Award Date: September 2017
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA27/W912QR-CAMPPARKSBARRACKS/listing.html)
 
Record
SN04514189-W 20170520/170519000017-62ba6ecd94a8620404553fede213f8d9 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  © 1994-2020, Loren Data Corp.