Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF MAY 26, 2017 FBO #5663
SOLICITATION NOTICE

F -- Nez Perce-Clearwater NF_Washington Creek Rd. Decommisioning

Notice Date
5/24/2017
 
Notice Type
Presolicitation
 
NAICS
238910 — Site Preparation Contractors
 
Contracting Office
Department of Agriculture, Forest Service, R-1 East Side Acquisition Team: Beaverhead-Deerlodge; Custer Gallatin; Helena; Lewis & Clark NFs; Dakota Prairie NG, Montana, United States
 
ZIP Code
00000
 
Solicitation Number
AG-02RC-S-17-0097
 
Point of Contact
Darren M. Zychek, Phone: 2084768224
 
E-Mail Address
dzychek@fs.fed.us
(dzychek@fs.fed.us)
 
Small Business Set-Aside
Total Small Business
 
Description
a. Scope of Contract. The Nez Perce-Clearwater National Forest decommissions roads to reduce erosion and landslide risks; protect and restore water quality, watershed function and condition; and improve soil productivity. This contract includes road decommissioning and related work in compliance with its terms, specifications, and provisions. This includes furnishing labor, equipment, supervision, transportation, operating supplies, and incidentals. b. Description of Work. The Washington Creek Road Decommissioning project consists of decommissioning 15.4 miles of road in the Washington, Tumble, and Lodge Creek watersheds using Roadway Obliteration Method I (recontour) and placing 5.4 miles of road into long-term storage using Roadway Obliteration Method II (outslope). Additional obliteration work may be determined during implementation. Road decommissioning treatments include drainage structure removal, decompaction, recontouring, strong outsloping and seeding of disturbed areas. All fill material and culverts in stream channel crossings and dry swales will be removed. Stream channels will be restored to natural grade and dimensions and grade control structures installed. Native vegetation, slash and duff material available on site will be transplanted to the decompacted and recontoured or outsloped roadway. Project roads include segments with gradients >25%, multiple fill and cutslope failures that require reconstruction for access, and deep fills. Trees greater than 20" DBH exist on some segments which may be worked around and preserved or may have to be removed for access or to excavate road fills.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/398/AG-02RC-S-17-0097/listing.html)
 
Place of Performance
Address: The project area is located northeast of Pierce, Idaho in the Washington, Tumble, and Lodge Creek watersheds in Clearwater County. Access to project roads is by USFS Road 246. From U.S. Highway 12, head north on State Highway 11, at Greer Junction. Travel north on State Highway 11 to Headquarters, ID. At Headquarters turn right onto USFS road 246 and travel for approximately 13.0 miles to camp 60, the project area. Access to individual project roads is described on worklists and maps., Orofino, Idaho, 83544, United States
Zip Code: 83544
 
Record
SN04520775-W 20170526/170524235409-5d52b5e72f7a26c612b640628bc54e62 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.