Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF MAY 27, 2017 FBO #5664
MODIFICATION

Z -- Nez Perce-Clearwater NFs - Crooked River Valley Rehabilitation - Option 2 - Site Visit Notes

Notice Date
5/25/2017
 
Notice Type
Modification/Amendment
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
Department of Agriculture, Forest Service, R-1 IMAT: Clearwater; Idaho Panhandle; Kootenai; and Nez Perce NF's, 3815 Schreiber Way, Coeur d'Alene, Idaho, 83815-8363, United States
 
ZIP Code
83815-8363
 
Solicitation Number
AG-02RC-S-17-0077
 
Point of Contact
Karen Ruklic, Phone: 208-983-5144
 
E-Mail Address
kruklic@fs.fed.us
(kruklic@fs.fed.us)
 
Small Business Set-Aside
Total Small Business
 
Description
Site Visit Notes The objective of the Crooked River Valley Rehabilitation Project is to address the impacts of historical dredge mining on aquatic habitat conditions. The Crooked River Valley Rehabilitation project was designed to be constructed in 4 - 6 Phases. The Phases include building a bypass channel, rebuilding floodplain and river channel, and adding large wood structures. Phase 1 Bypass work was completed in 2016 and Phase 2 Bypass Work will be completed in 2017 under a separate contract. The project is being performed on the Red River Ranger District of the Nez Perce Clearwater National Forests in collaboration with the Nez Perce Tribe Watershed Program and funded by Bonneville Power Administration. This contract requires the work specified under Option 2 of the Crooked River Valley Rehabilitation Project. Option 2 requires installation of 10 large woody debris structures utilizing on-site material and re-grading approximately 11 acres of floodplain including bankfull and upland elevations. The floodplain re-grading will require moving and reshaping approximately 11,800 cubic yards of mine tailings on site and hauling approximately 16,300 cubic yards of excess material to a staging area. On site soil and wood chips shall be used as surface treatment on the newly created floodplain. Contractor shall also salvage and transplant/utilize/stockpile soil, brush, vegetation and trees and create floodplain roughness. Contractor shall perform survey and construction staking incidental to these work items. Contractor shall furnish all labor, equipment, structures, supervision, transportation, operating supplies (except those designated at Government-furnished), and incidentals necessary to complete the project as required by the contract, plans, and specifications. The project is approximately 45 mi east of Grangeville, Idaho. At the junction of Highway 14 and the Crooked River Road (FR 233), travel south for approximately 0.25 mile to the project area. The Government's construction estimate is between $250,000 and $500,000. A formal pre-bid tour will be held; see Section L of the solicitation for details. It is anticipated that the solicitation will be issued in early May. Construction work shall commence approximately July 1, 2017; all work shall be completed by September 30, 2017. All in-stream work must take place between July 15th and August 30, 2017. Solicitation was issued on 5/10/2017. Original bid bonds are required. The organized site visit is scheduled for Wednesday, May 17th at 11 AM PST. While drafting the solicitation, the government choose to move the time from 1 o'clock to 11 o'clock. In the rush to post the solicitation, the drafter failed to change the PM to AM. No formal amendment will be made to the solicitation as the time intended is self-evident. Site Visit was held as planned. Notes have been uploaded. A solicitation amendment shall follow to clarify a few requirements and upload aerial photos.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/281/AG-02RC-S-17-0077/listing.html)
 
Place of Performance
Address: Red River Ranger District, 300 American River Road, Elk City, Idaho, 83525, United States
Zip Code: 83525
 
Record
SN04521740-W 20170527/170525235625-56d32f8c16268e0c8dff8c88827f86dd (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.